Original source · versioned page text
Meeting papers
Very large file (67.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 140, section 1. The text section number identifies this passage in the reader.
Burgess Creek Monitoring Program
Annual Review 2022
Figure 33. The temporal variability of pH during 2021.
8
7.5
7
pH
6.5
6
5.5
5
4.5
4
Month Sampled
Site SW3 Site B1 Site B5 Site B6 Site B3 Site B8 Site B2
Figure 34.The temporal variability of electrical conductivity during 2021.
2500
2000
Electrical Conductivity (µS/cm3)
1500
1000
500
0
Month Sampled
Site SW3 Site B1 Site B5 Site B6 Site B3 Site B8 Site B2
This document may not, in whole or part, be copied, photocopied, reproduced,
or translated without prior consent from the CEO, Unitywater. Page 30 of 64
Page 140 of 215
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.