2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Part 8                 Overlays
8.1                   Preliminary
(1)       Overlays identify areas in the planning scheme that reflect state and local level interests and that have one or more of the following
          characteristics:
          (a)   there is a strong sensitivity to the effects of development
          (b)   there is a constraint on land use or development
          (c)   there are valuable resources
          (d)   there are particular opportunities for development.

(2)       Overlays are mapped and included in Schedule 2 (mapping).
(3)       The changed category of development or assessment, if applicable, for development affected by an overlay is in Part 5 Tables of
          Assessment.
(4)       Assessment benchmarks for an overlay may be contained in one or more of the following:
          (a)   a map for an overlay
          (b)   a code for an overlay
          (c)   a zone code
          (d)   a local plan code
          (e)   a development code

(5)       Where development is proposed on premises partly affected by an overlay, the assessment benchmarks for the overlay only relate
          to the part of the premises affected by the overlay.

8.2                   Overlay codes
The overlay codes for the planning scheme are:
(a)       Acid Sulfate Soils Overlay Code
(b)       Biodiversity, Waterways and Wetlands Overlay Code
(c)       Bushfire Hazard Overlay Code
(d)       Coastal Protection and Scenic Amenity Overlay Code
(e)       Extractive Resources Overlay Code
(f)       Flood Hazard Overlay Code
(g)       Heritage Overlay Code
(h)       Landslide Hazard Overlay Code
(i)       Regional Infrastructure Overlay Code


8.2.1                 Acid Sulfate Soils Overlay Code

8.2.1.1               Application
(1)       This code applies to assessable development:
          (a)   subject to the Acid Sulfate Soils Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
          (b)   identified as requiring assessment against the Acid Sulfate Soils overlay code by the tables of assessment in Part 5
                (Tables of assessment).

(2)       All provisions in this code are assessment benchmarks for applicable assessable development.

Editor's Note—the Acid Sulfate Soils Overlay Maps in Schedule 2 (Mapping) identify the following areas potentially subject to acid sulfate
soils:­
(a)       Area 1 (Above 5 metres to 20 metres AHD); and
(b)       Area 2 (5 metres AHD or below).

      **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                   Page 1 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 78 (of 439)

Section 2

Editor’s Note—Planning scheme policy for Assessment of Natural Hazards provides advice and guidance for achieving certain
outcomes of this code, including guidance for the preparation of an ASS investigation report and management plan.

8.2.1.2           Purpose and overall outcome
(1)   The purpose of the Acid Sulfate Soils overlay code is to ensure that the generation or release of acid and metal contaminants from
      acid sulfate soils (ASS) does not have adverse effects on the natural environment, built environment, infrastructure or human
      health.
(2)   The overall outcome of the Acid Sulfate Soils overlay code is that development ensures that the release of acid and associated
      metal contaminants into the environment is avoided by either:
       (a)   not disturbing ASS when excavating or otherwise removing soil or sediment, extracting groundwater or filling land; or
       (b)   treating and, if required, undertaking ongoing management of any disturbed ASS and drainage waters.

Table 8.2.1.3 ­ Criteria for assessable development
Performance outcomes                                                Acceptable outcomes

Avoidance and management of ASS




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 2 of 51

Section 3

Performance outcomes                                              Acceptable outcomes
PO1                                                               AO1.1
Development:                                                      The disturbance of ASS is avoided by:
(a)     does not disturb ASS; or                                  (a)   undertaking an ASS investigation and soil analysis
(b)     is managed to avoid or minimise the release of acid and         according to the National Acid Sulfate Soils Guidance;
        metal contaminants, where disturbance of ASS is           (b)   not excavating or otherwise removing soil or sediment
        unavoidable.                                                    containing ASS;
                                                                  (c)   not permanently or temporarily extracting groundwater that
                                                                        results in the aeration of previously saturated ASS; and
                                                                  (d)   not undertaking filling on land at or below 5 metres AHD
                                                                        that results in:­
                                                                        (i)    actual ASS being moved below the water table; or
                                                                        (ii)   previously saturated ASS being aerated.


                                                                  Editor's note—National Sampling and Identification Methods
                                                                  Guidelines is a reference to:
                                                                  (a) National Acid Sulfate Soils Guidance: National acid
                                                                  sulfate soils sampling and identification methods manual,
                                                                  Department of Agriculture and Water Resources, Canberra
                                                                  (Sullivan et al, 2018); and
                                                                  (b) National Acid Sulfate Soils Guidance: National Acid
                                                                  Sulfate Soils Identification and Laboratory Methods Manual,
                                                                  Department of Agriculture and Water Resources, Canberra;
                                                                  and
                                                                  (c) the Australian Standard 4969.

                                                                  OR

                                                                  AO1.2
                                                                  The disturbance of ASS avoids the release of acid and metal
                                                                  contaminants by:­
                                                                  (a)   undertaking an ASS investigation conforming to
                                                                        the National Acid Sulfate Soils Guidance;
                                                                  (b)   neutralising existing acidity and preventing the generation
                                                                        of acid and metal contaminants using strategies
                                                                        documented in the Soil Management Guidelines; and
                                                                  (c)   preventing the release of surface or groundwater flows
                                                                        containing acid and metal contaminants into the
                                                                        environment.

                                                                  AND

                                                                  Editor's note—Soil Management Guidelines is a reference to the
                                                                  'Soil Management Guidelines. Queensland Acid Sulfate Soils
                                                                  Technical Manual'. Dear SE, Moore NG, Dobos SK, Watling KM
                                                                  and Ahern CR. Department of Natural Resources and
                                                                  Mines (2002).

                                                                  AO1.3
                                                                  Where potential or actual ASS is identified, they are managed in
                                                                  accordance with an ASS management plan.


8.2.2              Biodiversity, Waterways and Wetlands Overlay Code


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 3 of 51

Section 4

8.2.2.1             Application
(1)    This code applies to assessable development:
       (a)    subject to the Biodiversity, Waterways and Wetlands Overlay shown on the overlay maps contained within Schedule 2
              (Mapping);
       (b)    subject to the protected vegetation overlay area; and
       (c)    identified as requiring assessment against the Biodiversity, Waterways and Wetlands overlay code by the tables of
              assessment in Part 5 (Tables of assessment).

(2)    All provisions in this code are assessment benchmarks for applicable assessable development.


8.2.2.2             Purpose and overall outcomes
(1)    The purpose of the Biodiversity, Waterways and Wetlands overlay code is to to protect, rehabilitate and enhance ecologically
       important areas and improve connectivity and ecological linkages across Noosa Shire.
(2)    The overall outcomes sought for the Biodiversity, Waterways and Wetlands overlay code are:
       (a)    The natural resources and ecosystem values of Noosa Shire are protected and enhanced including ecologically important
              areas and land and environmental values of scenic, aesthetic, cultural, educational, recreational, scientific, economic and
              social value.
       (b)    Development is designed, sited, constructed and operated in a way that avoids adverse impacts on ecologically important
              areas, ecological systems and processes.
       (c)    Development design and layout provides for ecological connectivity across the landscape through the protection,
              rehabilitation and enhancement of native vegetation and ecological linkages.
       (d)    Ecological linkages and riparian vegetation are conserved, managed, enhanced and rehabilitated to protect and improve
              biodiversity, ecosystem health, landscape stability and resilience.
       (e)    Development design and layout provides for the protection and establishment of appropriate buffers to waterways,
              wetlands, native vegetation and significant fauna habitat.
       (f)    The terrestrial and aquatic native flora and fauna and their habitats are protected and enhanced.
       (g)    Development and its associated landscaping provides for the rehabilitation of ecologically important areas, degraded
              ecosystems and habitats to achieve a functional and healthy ecosystem state that requires minimal human intervention.
       (h)    Development is designed, sited, constructed and operated to avoid or minimise adverse impacts on koalas and their
              habitat and to provide for connectivity and safety for the long term viability of the koala population.
       (i)    In urban areas, biodiversity values are protected and enhanced to assist with ecosystem health, flora and fauna, urban
              amenity and quality of life.
Editor's Note—Ecologically important areas include Areas of Biodiversity Significance, Riparian Buffer Areas, wetland areas and other values as
defined in Schedule 1. Wetland areas are identified on the Queensland Wetland Program mapping.

Editor's Note—The Planning Act 2016 and Planning Regulation 2017 allow for native forest timber production authorised under the Forestry Act 1959
and the Vegetation Management Act 1999 to generally be conducted without being subject to the provisions of a planning scheme.

Table 8.2.2.3 ­ Criteria for assessable development
Performance outcomes                                                      Acceptable outcomes
Ecologically important areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                       Page 4 of 51

Section 5

PO1                                                                     AO1.1
Development is sited and designed to protect the physical and           Ecologically important areas are conserved or improved to ensure
ecological integrity and biodiversity of ecologically important areas   their ongoing contribution to the natural resources and biological
through protection of:                                                  diversity of Noosa Shire.
(a)   existing habitat areas and ecological linkages; and
                                                                        AND
(b)   existing riparian vegetation, waterways and wetland habitat
      values.
                                                                        AO1.2
                                                                        Buildings, structures and associated works are located within
                                                                        existing cleared areas or areas of lowest ecological value.

                                                                        AND

                                                                        AO1.3
                                                                        Where constructing a dwelling house or community residence,
                                                                        buildings and associated structures are not located on land
                                                                        identified as an area of biodiversity significance on a Biodiversity,
                                                                        Waterways and Wetlands Overlay Map.

                                                                        or

                                                                        Clearing vegetation (other than for a driveway access) does not
                                                                        extend beyond—
                                                                        (a)   30 metres of a building or 10 metres of a class 10a
                                                                              structure on lots greater than 10 hectares; or
                                                                        (b)   10 metres of a building or class 10a structure on lots 10
                                                                              hectares or less but more than 3,000m2; or
                                                                        (c)   3 metres of a building or class 10a structure on lots
                                                                              3,000m2 or less.

                                                                        AND

                                                                        AO1.4
                                                                        Clearing of vegetation for a boundary fence does not extend
                                                                        beyond 5 metres either side of the fence.


Reconfiguring a lot            Table 8.2.2.3 ­ Criteria for assessable development (part)
Performance outcomes                                                    Acceptable outcomes
Reconfiguring a lot
PO2                                                                     AO2
New lots are only created if they maintain ecological linkages and      Where clearing vegetation for the purpose of Reconfiguring a Lot
minimise the clearing of vegetation.                                    —
                                                                        (a)   new boundaries to lots do not transect and fragment
                                                                              existing native vegetation;
                                                                        (b)   new lots are created to allow for suitable building
                                                                              envelopes for future buildings and works to be located
                                                                              within existing cleared areas or areas of low ecological
                                                                              value;
                                                                        (c)   building envelopes are designated for each lot; and
                                                                        (d)   ecological linkages and ecologically important areas are
                                                                              secured by environmental covenant or transferred to public
                                                                              ownership or through gazettal of a nature reserve.


Management of impacts                 Table 8.2.2.3 ­ Criteria for assessable development (part)

  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                   Page 5 of 51

Section 6

Performance outcomes                                                  Acceptable outcomes
Management of impacts
PO3                                                                   AO3.1
Development is designed and sited to manage adverse impacts           Where clearing of vegetation cannot be practicably avoided, the
on ecologically important areas by:                                   development:
(a)   minimising the total footprint within which all activities,     (a)   ensures the design and siting limits the loss of vegetation
      buildings, structures driveways and other works are                   to the smallest extent possible;
      contained;                                                      (b)   protects and retains ecological values and ecosystem
(b)   locating development in existing cleared areas or areas of            processes to the greatest extent possible within and
      low ecological value over other areas to the greatest extent          adjacent to the site;
      possible; and                                                   (c)   provides measures to allow for safe movement of fauna
(c)   incorporating siting and design measures to protect and               through the site; and
      retain ecological values and ecosystem processes within         (d)   provides suitable habitat replacement and replanting in
      or adjacent to the development site; and                              accordance with PSP3 Ecological Assessment Guidelines.
(d)   where adverse impacts have been minimised, any                  AO3.2
      residual impacts on ecological values are compensated           Habitat trees, recruitment habitat trees, and roosting, breeding
      for through suitable habitat replacement and replanting         and feeding areas are protected for native fauna habitat.
      on site in the first instance or in a way that results in a
      net gain and enhancement of the overall habitat values
      of Noosa Shire.
PO4                                                                   AO4.1
Development provides for effective measures during construction       Vegetation is protected from disturbance or damage from
and operation to protect ecological values including:                 construction and operation activities by:
(a)   avoiding disturbance to or clearing of vegetation in and        (a)   clearly marking trees to be retained with flagging tape;
      within the vicinity of the site;                                (b)   installing protective fencing around the dripline of the
(b)   managing habitat disturbance and physical harm to fauna               vegetation and avoid filling and excavating in these fenced
      from noise, vibration, dust, light, dewatering or excavating;         areas;
      and                                                        (c)        ensuring stockpiling, storage and vehicle parking occurs
(c)   avoiding clearing in areas where erosion or slippage could            outside the identified vegetation areas; and
      occur.                                                     (d)        using low impact construction techniques around
                                                                            vegetation.


                                                                      AO4.2
                                                                      Vegetation which is capable of forming or contributing to a
                                                                      buffer between different land uses or a buffer against pollution,
                                                                      light spillage or noise is retained.

                                                                      AO4.3
                                                                      Lighting associated with development:
                                                                      (a)   does not contribute an unacceptable level of illuminance
                                                                            (greater than 1 lux) for light sensitive species within or at
                                                                            the boundary of an ecologically important area; and
                                                                      (b)   does not contribute to an unacceptable level of illuminance
                                                                            on landward horizons along coastal areas and known
                                                                            marine turtle nesting beaches.

                                                                      AO4.4
                                                                      Clearing of vegetation does not involve clearing that may cause or
                                                                      contribute to hillslope erosion, bank erosion, or slippage.


Connectivity         Table 8.2.2.3 ­ Criteria for assessable development (part)


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 6 of 51

Section 7

Performance outcomes                                           Acceptable outcomes
Connectivity
PO5                                                              AO5
Development is designed and operated to maintain and enhance Development is designed and operated to maintain ecological
connectivity between and across ecologically important areas and linkages and maximise opportunity for connectivity and the
connecting habitat and support unimpeded and safe movement of movement of fauna by:
terrestrial and aquatic fauna.                                   (a)   ensuring protection of wildlife refuges;
                                                               (b)    maintaining vegetation in patches of the greatest possible
                                                                      size and within the smallest possible edge­to­area ratio;
                                                               (c)    enhancing connectivity through planting and rehabilitation
                                                                      works, including across property boundaries, to areas of
                                                                      national park, state forest or reserve;
                                                               (d)    avoiding the creation of physical barriers and safety
                                                                      hazards (such as roads, pedestrian access and instream
                                                                      structures) along and within the ecological linkage;
                                                               (e)    providing mitigation measures such as wildlife movement
                                                                      infrastructure, fauna exclusion and directional fencing,
                                                                      underpasses/overpasses and traffic calming devices,
                                                                      signage and lighting; and
                                                               (f)    where offsets are necessary, delivering offsets that support
                                                                      and enhance ecological linkages.



Waterways and wetlands                 Table 8.2.2.3 ­ Criteria for assessable development (part)
Performance outcomes
Waterways and wetlands




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                        Page 7 of 51

Section 8

PO6                                                                 AO6.1
The biodiversity and ecosystem values of waterways, wetlands        Development and clearing of vegetation does not occur within:
and adjacent riparian zones are protected by:                      (a)    a riparian buffer area;
(a)   avoiding any new development in a riparian buffer area and (b)      a wetland area; or
      wetland area;
                                                                   (c)    10 metres either side of the centre line of other waterways
(b)   retaining aquatic and terrestrial habitat in riparian zones;        identified on a Biodiversity, Waterways and Wetlands
(c)   maintaining and enhancing wildlife corridors and                    Overlay Map.
      connectivity along watercourses and drainage lines for
      native fauna movement;                                        AO6.2
(d)   avoiding edge effects and damage from adjacent land           Development provides for the rehabilitation of land within:
      uses;                                                         (a)   a riparian buffer area;
(e)   maintaining stream integrity and bank stability by            (b)   a wetland area; and
      minimising bank erosion and slumping;
                                                                    (c)   10 metres either side of the centre line of any other
(f)   maintaining water quality through filtering sediments,              waterway identified on a Biodiversity, Waterways and
      nutrients and other pollutants; and                                 Wetlands Overlay Map.
(g)   removing pest species and replacing them with local native
      species.                                                   AO6.3
                                                                 Recreational facilities (eg. playgrounds, pergolas, barbeques) are
                                                                 setback a minimum of 10 metres from the top of the bank of a
                                                                 waterway.

                                                                    Editor’s Note—Setbacks to waterways for certain uses and works
                                                                    are also specified in the relevant codes.

                                                                    Editor's Note—Wetland areas are identified on the Queensland
                                                                    Wetland Program mapping

                                                                    Editor's Note—Any clearing of vegetation also needs to meet the
                                                                    outcomes of the Earthworks Code and the Water Quality and
                                                                    Drainage Code.
PO7
Vegetation within 400 metres of the full ponded water within Lake   No acceptable outcome provided.
Macdonald is retained.
PO8                                                                 AO8.1
Development on land adjacent to a waterway or wetland               Development adjacent to a waterway or wetland provides that:
maintains appropriate extent of public access to waterways and      (a)   no new lots directly back onto a riparian buffer area; and
wetlands and minimises edge effects.
                                                                    (b)   new public roads are located between a riparian buffer area
                                                                          or riparian zone and the proposed development area.




Water hydrology            Table 8.2.2.3. ­ Criteria for assessable development (part)
Performance outcomes                                                Acceptable outcomes
Surface and ground water hydrology




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 8 of 51

Section 9

PO9                                                                  AO9.1
Development ensures that the natural surface water and ground        Development does not impact on the natural surface water or
water hydrologic regimes of waterways, wetlands and                  groundwater hydrologic regimes and this is facilitated by:
hydrologically­sensitive plant communities are not adversely         (a)   avoiding or minimising channelization, redirection or
impacted.                                                                  interruption of flow;
                                                                           avoiding groundwater extraction;
Editor's Note—Groundwater dependent ecosystems are identified (b)
on Queensland Government Wetland Info mapping.                (c)          maintaining groundwater recharge and discharge
                                                                           processes;
                                                                     (d)   maintaining natural groundwater fluctuations;
                                                                     (e)   avoiding causing ingress of saline water into freshwater
                                                                           aquifers of wetlands; and
                                                                     (f)   avoiding contaminants entering groundwater (e.g. from
                                                                           runoff, effluent disposal).



Rehabilitation of ecologically important areas                      Table 8.2.2.3 ­ Criteria for assessable development
(part)
Performance outcomes                                                 Acceptable outcomes
Rehabilitation of ecologically important areas
PO10                                                                 AO10.1
Development provides for ecologically important areas to be          Landscaping and rehabilitation complements and supports
restored and enhanced through:                                       ecologically important areas by:
(a)   designing landscaped areas to complement and enhance           (a)   utilising local native species;
      existing vegetation and ecological linkages;                   (b)   utilising suitable plant species identified in PSP2
(b)   removing species likely to displace native flora species or          Landscaping;
      degrade fauna habitat;                                         (c)   restoring degraded ecosystems to achieve a functional
(c)   replanting and rehabilitating degraded habitat;                      ecosystem state that requires minimal human intervention;
(d)   replacing any vegetation removed with suitable local native    (d)   replicating adjacent remnant habitats of the same type,
      species;                                                             including the understorey vegetation;
(e)   providing for fauna habitat; and                               (e)   creating or enhancing linkages between existing habitats;
(f)   avoiding the planting of pest plant species.                   (f)   avoiding the use of pest plant species listed in PSP2 ­
                                                                           Landscaping;
                                                                     (g)   planting riparian zones to filter stormwater run­off, stabilise
                                                                           soil and provide for wildlife habitat; and
                                                                     (h)   providing ground and arboreal structures for fauna, which
                                                                           may include ground depressions, rocks, hollows, nesting
                                                                           boxes and in­stream habitat.

                                                                     AO10.2
                                                                     Vegetation cleared is replaced with:
                                                                     (a)   plantings of equivalent area that replicate the floristic
                                                                           structure of the vegetation removed; or
                                                                     (b)   where this is not possible due to the characteristics of the
                                                                           site and the development, plantings twice the number of the
                                                                           removed trees and plants.

                                                                     Editor’s Note — Revegetation and rehabilitation works are to be
                                                                     carried out in accordance with an approved Revegetation and
                                                                     Rehabilitation Management Plan, as referred to in PSP3
                                                                     Ecological assessment guidelines.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 9 of 51

Section 10

Koala habitat protection and enhancement                        Table 8.2.2.3 ­ Criteria for assessable development
(part)
Performance outcomes                                                Acceptable outcomes
Koala habitat protection and enhancement
PO11                                                                AO11.1
Development is designed, constructed and operated to—               Development avoids clearing non­juvenile koala habitat trees.
(a)   protect and enhance koalas and koala habitat and avoid
                                                             AO11.2
      adverse impacts;
                                                                    Development design complies with the Koala Sensitive Design
(b)   provide measures to assist the survival of koala              Guideline: A guide to koala sensitive design measures for
      populations in the area to mitigate any potential threats     planning and development activities (Queensland Government
      or risk to koalas;                                            2012).

(c)   provide for safe and appropriate koala movement across     AO11.3
      the landscape; and                                         Where clearing of non­juvenile koala habitat trees is unavoidable
(d)   provide for a net gain in mature and actively regenerating such clearing is minimised and an environmental offset is
      koala habitat.                                             provided in accordance with the Queensland Environmental Offset
                                                                 Policy and provides for a net gain in koala habitat in Noosa Shire.

                                                                    AO11.4
Editor's note—Koala Habitat Areas are mapped in Schedule            Development incorporates revegetation and landscaping that
2. Koala habitat trees are not confined to these mapped             provides food, shelter and movement opportunities for koalas.
areas, but also occur throughout other parts of Noosa Shire.
The State Government Koala Assessable Development Areas             AO11.5
identify koala habitat within assessable development areas          Development is designed to maximise and enhance connectivity
                                                                    between koala habitat trees and ensure safe koala movement.
under the Planning Act 2016.
                                                                    AO11.6
                                                                    During construction, measures are incorporated to not increase
                                                                    the risk of death or injury to koalas, including koala requirements
                                                                    set out in Schedule 11 of the Planning Regulation 2017.


Bushfire management                Table 8.2.2.3 ­ Criteria for assessable development (part)
Performance outcomes                                                Acceptable outcomes

Bushfire management
PO12                                                                No acceptable outcome provided
Bushfire management measures are adopted based on
ecological principles, which:                                       Editor's note—The performance outcome applies to properties in
(a)   maintain and enhance biodiversity;                            bushfire hazard areas and only where clearing is reasonably
                                                                    necessary for the control of bushfire risk to a building or
(b)   minimise threat of fire to the natural environment, as well
                                                                    structure. Bushfire hazard areas are shown on Bushfire Hazard
      as life and property; and
                                                                    Overlay maps in Schedule 2.
(c)   provide for effective use and maintenance of buildings and
      structures.



Scenic amenity           Table 8.2.2.3 ­ Criteria for assessable development (part)
Performance outcomes                                                Acceptable outcomes
Scenic amenity




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 10 of 51

Section 11

PO13                                                                 AO13.1
The scenic amenity and vegetated character of the landscape          Vegetation is retained:
is protected by retaining vegetation:                                (a)   on and within 30 metres of prominent ridgelines and on
(a)     along and around watercourses and drainage lines;                  sloping sites;

(b)     on steep slopes and ridgelines;                              (b)   in gullies;

(c)     along the major road network; and                            (c)   along watercourses and drainage lines;

(d)     that forms coastal vistas to and from beaches.               (d)   within 10 metres of the major road network; and
                                                                     (e)   along the front coastal dune system.


8.2.3              Bushfire Hazard Overlay Code

8.2.3.1            Application
(1)    This code applies to assessable development:
       (a)   subject to the Bushfire Hazard Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
       (b)   identified as requiring assessment against the Bushfire Hazard overlay code by the tables of assessment in Part 5 (Tables
             of assessment).

(2)    All provisions in this code are assessment benchmarks for applicable assessable development.

Editor's note—Planning scheme policy 9 for assessment of natural hazards provides guidance on preparing bushfire hazard
assessments and mitigation reports.

8.2.3.2            Purpose and overall outcomes
(1)    The purpose of the Bushfire Hazard overlay code is to ensure that development avoids or mitigates the potential adverse impacts
       of bushfire on people, property, economic activity and the environment.
(2)    The overall outcomes sought for the Bushfire Hazard overlay code are:
       (a)   Development in areas at risk from bushfire hazard is compatible with the nature of the hazard.
       (b)   The risk to people, property and the natural environment from bushfire hazard is minimised.
       (c)   Development does not result in a material increase in the extent and severity of bushfire hazard.
       (d)   Bushfire risk mitigation treatments are accommodated in a manner that avoids or minimises impacts on the natural
             environment and ecological processes.
       (e)   Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
       (f)   Community infrastructure essential to the health, safety and wellbeing of the community is located and designed to function
             effectively during and immediately after a bushfire event.
       (g)   Development avoids the release of hazardous materials as a result of a bushfire hazard event.

Table 8.2.3.3 ­ Criteria for assessable development
Performance outcomes                                                 Acceptable outcomes

Safety of people and property




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 11 of 51

Section 12

Performance outcomes                                                 Acceptable outcomes
PO1                                                              AO1.1
Development maintains the safety of people and property from the Development which will materially increase the number of
adverse impacts of bushfire.                                     people living or congregating on premises, including
                                                                     reconfiguring a lot, is not located within a medium or high
                                                                     bushfire hazard area.


                                                                     AO1.2
                                                                     Development maximises setbacks from hazardous vegetation to
                                                                     achieve an acceptable risk.

                                                                     Editor’s Note — PSP8 Natural Hazards provides guidance for
                                                                     assessing bushfire hazard risk and preparing a bushfire hazard
                                                                     management plan.



Impacts on Ecologically Important Areas
PO2
Bushfire mitigation measures do not adversely impact on:             No acceptable outcome provided
(a)   biodiversity values, connectivity and ecosystem functioning;
      and
(b)   the long term physical integrity of waterways, wetland and
      areas of native vegetation.

Water Supply for Fire Fighting Purposes
PO3                                                                  AO3.1
Development provides an adequate water supply for fire fighting Premises are connected to the reticulated water supply.
purpose which is reliable, safely located and freely accessible.
                                                                 Editor's note—For reconfiguring a lot, water supply needs to
                                                                 provide for a minimum flow and pressure of 10 litres a second
                                                                 at 200kPa at all times for fire fighting purposes.

                                                                     OR

                                                                     AO3.2
                                                                     Where there is no available reticulated water supply, the premises
                                                                     has:
                                                                     (a)     an accessible dam, swimming pool or water tank available
                                                                             for fire fighting purposes with an onsite water volume of not
                                                                             less than 5,000 litres; and
                                                                     (b)     a water supply outlet pipe 50 milimetres in diameter fitted
                                                                             with a standard fire brigade fitting connected to the water
                                                                             supply (other than where the water supply is in a swimming
                                                                             pool or dam).

                                                                     Editor’s Note—Water supply capacity for fire fighting purposes is
                                                                     in addition to water supply capacity for other uses and activities on
                                                                     the premises.


Essential Community Infrastructure




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 12 of 51

Section 13

Performance outcomes                                                 Acceptable outcomes
PO4                                                                  AO4.1
Essential community infrastructure is able to function effectively   Development involving essential community infrastructure is not
during and immediately after bushfire events.                        located within a medium or high bushfire hazard area.

                                                                     OR

                                                                     AO4.2
                                                                     Where located in a medium or high bushfire hazard area,
                                                                     development involving essential community infrastructure is
                                                                     designed to function effectively during and after a bushfire event in
                                                                     accordance with a Bushfire Hazard Management Plan.

                                                                     Editor’s Note— PSP8 Natural Hazards provides guidance for
                                                                     assessing bushfire hazard risk and preparing a bushfire hazard
                                                                     management plan.
Hazardous Materials
PO5                                                                  AO5
Public safety and the environment are not adversely affected         Hazardous materials are not manufactured or stored in bulk in
by the impacts of bushfire on hazardous materials                    a bushfire hazard area.
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6                                                                  AO6.1
Roads provide for easy and safe evacuation of residents of           The road layout provides for through­roads and avoids cul­de­
premises and access by emergency services.                           sacs and dead­end roads.

                                                                     OR

                                                                     AO6.2
                                                                     The development has a perimeter road reserve with a minimum
                                                                     width of 20 metres and maximum gradient of 12.5%.

                                                                     OR

                                                                     AO6.3
                                                                     Cul­de­sacs or no­through roads are provided with fire trails or
                                                                     access easements, which are capable of being navigated by
                                                                     conventional vehicles and which link to through roads.

                                                                     AO6.4
                                                                     Safe access and egress is available at all times to all of the
                                                                     development for emergency vehicles and personnel.

                                                                     AO6.5
                                                                     Where an emergency access point is required, it complies with
                                                                     the relevant works codes and PSP6 Engineering Design
                                                                     Standards.
Lot design




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 13 of 51

Section 14

Performance outcomes                                               Acceptable outcomes

PO7                                                                AO7
Lot design and building siting minimises bushfire hazard risk to   Each residential lot:
people and property.                                               (a)     includes a building envelope, identified on a plan of
                                                                           subdivision;
                                                                   (b)     is of sufficient size and shape to allow for efficient
                                                                           emergency access to buildings for fire fighting appliances
                                                                           (e.g. by avoiding battle­axe/hatchet lots and long narrow lots
                                                                           with long access driveways to buildings);
                                                                   (c)     where more than 2500m², achieves setbacks from
                                                                           hazardous vegetation in line with Bushfire Attack Level 29
                                                                           requirements as per AS3959; and
                                                                   (d)     is designed so that buildings and structures are sited in
                                                                           locations of lowest hazard within the lot and elements of the
                                                                           development least susceptible to fire are closest to the fire
                                                                           hazard.

Firebreaks and fire access tracks
PO8                                                                AO8.1
Firebreaks and fire access tracks provide:                         Where development involves the creation of a new road and
(a)     adequate access for fire fighting and other emergency      lots, a firebreak is provided by providing a cleared road reserve
        vehicles; and                                              not less than 20 metres wide and maximum gradient of 12.5%
(b)     adequate access for the evacuation of residents and        around the perimeter of the subdivision, between the created
        emergency personnel in an emergency situation.             lots and surrounding vegetated lands.

                                                                   OR

                                                                   AO8.2
                                                                   Fire access tracks are provided between the created lots and
                                                                   surrounding vegetated land that:
                                                                   (a)     have a cleared minimum width of 6 metres;
                                                                   (b)     have a maximum gradient of 12.5%;
                                                                   (c)     provide unbroken access for fire fighting vehicles;
                                                                   (d)     provide passing bays and turning areas;
                                                                   (e)     are located within an access easement that is granted in
                                                                           favour of Noosa Council and the Queensland Fire and
                                                                           Rescue Service.

                                                                   AO8.3
                                                                   Bushfire management measures are carried out on the subject
                                                                   property and not any adjoining property.


8.2.4             Coastal Protection and Scenic Amenity Overlay Code

8.2.4.1           Application
(1)   This code applies to assessable development:
      (a)    subject to the Coastal Protection and Scenic Amenity Overlay shown on the overlay maps contained within Schedule 2
             (Mapping); and
      (b)    identified as requiring assessment against the Coastal Protection and Scenic Amenity overlay code by the tables of
             assessment in Part 5 (Tables of assessment).

(2)   All provisions in this code are assessment benchmarks for applicable assessable development.


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 14 of 51

Section 15

8.2.4.2           Purpose and overall outcomes
(1)   The purpose of the Coastal Protection and Scenic Amenity overlay code is to:
      (a)   maintain coastal processes including erosion and accretion processes to enable these natural functions to continue;
      (b)   maintain the protective function of coastal resources including vegetation and dunes to mitigate risks associated with
            coastal erosion; and
      (c)   ensure development is designed and sited to protect the natural beach experience and scenic amenity of the coastal area
            enjoyed by Noosa Shire residents and visitors.


Editor's Note—Coastal hazards including coastal erosion, storm tide inundation, or permanent inundation from sea level rise. The term
includes the impacts from climate change. Storm tide inundation is specifically addressed in the Flood Hazard overlay code.

Editor's Note—Coastal Erosion Areas are identified on Council's online mapping for the years 2040, 2070 and 2100.


(2)   The purpose of the code will be achieved through the following overall outcomes:
      (a)   Development allows for natural processes of erosion and accretion to occur naturally, including as a result of sea level rise.
      (b)   Development ensures landforms, creeks, dunes, vegetation and biodiversity in coastal areas are not impacted by
            development to mitigate coastal hazard risks and to protect environmental values; and
      (c)   Development is designed and sited to protect the visual character and scenic amenity of the Coastal Protection and Scenic
            Amenity Area and to integrate with the surrounding natural landscape and skyline vegetation.

Table 8.2.4.3 ­ Criteria for assessable development
Performance outcomes                                                Acceptable outcomes
Development in Coastal Erosion Areas
PO1                                                                 No acceptable outcome provided.
Development allows for natural fluctuations of the coast and
foreshores to occur, including allowance of climate change.         Editor's note—Coastal erosion areas are identified on Council's
                                                                    online mapping for the years 2040, 2070 and 2100.
Protection of dunes and coastal creeks

PO2
Development is located, designed and constructed to:                No acceptable outcome provided

(a)    maintain dune crest heights and minimise and mitigate the
       risk to development from wave overtopping and storm tide
       inundation;
(b)    maintain or enhance coastal ecosystems and natural
       features such as coastal creeks and marine plants
       including mangroves, salt marshes and coastal wetlands,
       to assist in protecting and buffering communities and
       infrastructure from sea­level rise and coastal inundation
       impacts.

Coastal building Lines
PO3
Where a coastal building line exists on a lot, all buildings,       No acceptable outcome provided
structures and retaining walls do not extend seaward of the
coastal building line for the site, other than—                     Editor's Note—State coastal building lines are identified on the
(a)    uncovered and unenclosed cantilevered balconies that do      Coastal Protection Overlay Maps. State coastal building lines are
       not extend greater than 3 metres seaward of the coastal      declared under the Coastal Protection and Management Act 1995.
       building line; and
(b)    are setback a minimum of 6 metres from the seaward
       boundary (see Figure 8.2.4.4).




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 15 of 51

Section 16

Performance outcomes                                                 Acceptable outcomes

PO4                                                                  No acceptable outcome provided
Where a coastal building line does not exist on a lot fronting the
beachfront or a reserve adjoining the beachfront, new buildings
and structures are setback no less than 6 metres from the
seaward boundary of the site.

Performance outcomes                                                 Acceptable outcomes
Visual Character and Scenic Amenity
PO5                                                                  AO5
Development within the Coastal Protection and Scenic Amenity         A mix of native landscaping, such as ground covers, shrubs and
Area is—                                                             trees, is provided for a width of 5 metres from the seaward or rear
(a)   designed to protect character and scenic amenity and           boundary of the site to provide adequate landscape buffering to
      integrate with the surrounding natural landscape and           protect the coastal dune system.
      skyline vegetation (see Figure AP3­3A); and
                                                                     Editor's Note—Refer to the Table 3.1 & 3.2 of PSP2 Landscaping
(b)   finished predominately in colours and hues of the
                                                                     for suitable coastal species.
      surrounding natural landscape.
                                                                     Editor's Note The following is a useful guide for ensuring that
                                                                     buildings blend with the natural surrounds.

                                                                     External building materials that are lightweight and comprise
                                                                     predominantly timber or board, stainless steel, glass, and
                                                                     corrugated iron will generally be more in keeping with the
                                                                     beach/riverside character than concrete rendered block.

                                                                     Use external colours and roof finishes which are non­reflective and
                                                                     which do not cause glare. Shades that match the colours and
                                                                     tones of surrounding vegetation will ensure the buildings are less
                                                                     visually prominent from the beach or the water.

                                                                     Appropriate wall colours will depend on the existing native
                                                                     vegetation and backdrop, but may include muted
                                                                     earth/environmental tones that blend with the natural environment,
                                                                     such as–
                                                                          green;
                                                                          olive green;
                                                                          blue green;
                                                                          grey green;
                                                                          green blue;
                                                                          indigo;
                                                                          brown;
                                                                          blue grey; and
                                                                          green yellow.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 16 of 51

Section 17

Performance outcomes                                                Acceptable outcomes
PO6                                                                 AO6.1
Rear fences adjacent to the beachfront within the Coastal           Rear fences adjacent to the beachfront within the Coastal
Protection Area are designed and sited to be sympathetic with the   Protection Area incorporate the following—
visual amenity of the beachfront and do not degrade the natural     (a)   height of no more than 1.2 metres; and
beachfront character.
                                                                    (b)    open construction (ie at least 50% transparent);
                                                                    (c)   lightweight materials (eg. timber); and
                                                                    (d)   dark colours to blend with the natural landscape.

                                                                    AO6.2
                                                                    Gates are not installed in fences as direct access to the
                                                                    beachfront does not occur.

                                                                    AO6.3
                                                                    Only beach access points for use by the community are
                                                                    constructed.

Figure 8.2.4.4 ­ Coastal Building Lines




8.2.5             Extractive Resources Overlay Code

8.2.5.1           Application
(1)   This code applies to assessable development:
      (a)   subject to the Extractive Resource Areas Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
      (b)   identified as requiring assessment against the Extractive Resources overlay code by the tables of assessment in Part 5
            (Tables of assessment).

(2)   All provisions in this code are assessment benchmarks for applicable assessable development.


8.2.5.2           Purpose and overall outcomes
(1)   The purpose of the Extractive Resources overlay code is to protect extractive resource areas and transport routes from
      development that is not compatible with extractive industry operations and to minimise land use conflicts between the extractive


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 17 of 51

Section 18

      industry operation and other activities in the vicinity of extractive resource areas.
(2)   The overall outcomes sought for the Extractive Resources overlay code are:
      (a)   Development does not adversely affect or impede extraction of resources from extractive resource areas.
      (b)   Development ensures that extractive resource separation areas and transport route separation areas are not encroached
            upon by incompatible development that could affect or impede extraction or haulage of resources.
      (c)   Development, other than for an extractive industry, is buffered from and is able to mitigate impacts likely to occur as a result
            of an extraction of resources from an extractive resource area.
      (d)   A high level of amenity for residents and land uses in the vicinity of extractive industry operations and transport routes is
            maintained.



Table 8.2.5.3 ­ Criteria for assessable development
Performance outcomes                                                    Acceptable outcomes

Development within Resource Processing Areas
PO1                                                                     AO1
Development within the resource/processing area does not                Development within the resource processing area is for:
constrain, prevent or otherwise interfere with the winning or           (a)    extractive industry uses;
processing of extractive resources.
                                                                        (b)    uses that are directly associated with an extractive industry;
                                                                               or
                                                                        (c)    temporary or non­intensive uses that are compatible with
                                                                               future extractive industry operations.

Development within Extractive Resource Processing / Separation Areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 18 of 51

Section 19

Performance outcomes                                              Acceptable outcomes
PO2                                                               AO2.1
Development within the resource processing/separation area:       Development does not result in the creation of additional lots
(a)   does not increase the number of people living in the        used or capable of being used for residential purposes.
      separation area;
                                                                  AO2.2
(b)   incorporates measures to avoid or mitigate adverse
                                                                  Where realigning boundaries, the development does not worsen
      impacts from the extracting and transporting of the
                                                                  the situation with respect to the distance between available house
      extractive resource; and
                                                                  sites and the resource processing area.
(c)   does not compromise the function of the separation area in
      providing a buffer between the extractive industry and other AO2.3
      incompatible uses beyond the separation area.                Development does not result in an increase in the scale or density
                                                                   of residential uses within a resource/processing separation area;

                                                                  OR

                                                                  AO2.4
                                                                  Development within the extractive resource separation area
                                                                  incorporates design, orientation and construction materials that
                                                                  mitigate potential adverse effects from an existing or future
                                                                  extractive industry;

                                                                  OR

                                                                  AO2.5
                                                                  Development within the extractive resource separation area
                                                                  operates outside the normal hours of operation for existing or
                                                                  future extractive industry activities.

                                                                  AO2.6
                                                                  Extractive industry development does not occur within the
                                                                  extractive resource separation area.

                                                                  OR

                                                                  AO2.7
                                                                  Where extractive industry development occurs within the extractive
                                                                  resource separation area, the extractive industry does not impact
                                                                  on sensitive land uses located within or outside of the extractive
                                                                  resource separation area.

                                                                  Editor’s Note—Where lots have land both within and outside the
                                                                  separation area, a residential use of the lot may be approved
                                                                  provide dwellings are located outside the separation areas. Plans
                                                                  lodged with Council shall include building envelopes that identify
                                                                  the location of the dwelling.
Development within Transport Route Separation Areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 19 of 51

Section 20

Performance outcomes                                                      Acceptable outcomes
PO3                                                                       AO3.1
Development does not increase the number of people living in a            Development does not result in an increase in the scale or density
transport route separation area.                                          of residential uses within a transport route separation area.

                                                                          AO3.2
                                                                          Reconfiguring a lot within a transport route separation area:
                                                                          (a)    does not result in the creation of additional lots used or
                                                                                 capable of being used for residential purposes; and
                                                                          (b)    where realigning boundaries, does not worsen the existing
                                                                                 situation with respect to the distance between available
                                                                                 building sites and the transport route.


PO4                                                                       AO4
Development involving a sensitive land use within a transport             Development involving a sensitive land use within a transport
route separation area maintains an acceptable level of amenity.           route separation area ensures an acceptable level of amenity by:
                                                                          (a)    maintaining an adequate separation distance to the
                                                                                 transport route; and
                                                                          (b)    incorporating mitigation measures such as landscape
                                                                                 buffer strips, mounding and screening.

PO5                                                                       AO5.1
Development does not adversely affect the safe and efficient              Development does not increase the number of properties with
operation of vehicles transporting extractive materials.                  access points to a transport route.

                                                                          OR

                                                                          AO5.2
                                                                          Development provides access points that are designed to avoid
                                                                          adversely affecting the safe and efficient operation of vehicles
                                                                          transporting extractive materials along the transport route.


8.2.6               Flood Hazard Overlay Code

8.2.6.1             Application
(1)    This code applies to assessable development:
       (a)    in the Flood Hazard Overlay shown on the overlay maps contained within Schedule 2 Mapping; and
       (b)    identified as requiring assessment against the Flood Hazard overlay code by the tables of assessment in Part 5 (Tables of
              Assessment).

(2)     All provisions of the code are assessment benchmarks for applicable assessable development.



Editor's Note—The Flood Hazard Overlay Maps in Schedule 2 (Mapping) identify flooding and inundation areas where flooding and storm tide
modelling has been undertaken by Council. Other areas not identified by the Flood Hazard Overlay may also be subject to flooding or storm tide
inundation. Maximum flow velocity mapping is also available from Council.

Editor’s Note—Planning scheme policy 9 for Assessment of Natural Hazards provides guidance for achieving certain outcomes of this code, including
for the preparation of a flood hazard assessment and mitigation report.


8.2.6.2             Purpose and overall outcomes
(1)    The purpose of the Flood Hazard overlay code is to:
       (a)    provide for the assessment of the compatibility of development in the flood hazard overlay to flood and storm tide inundation


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                      Page 20 of 51

Section 21

            risk, taking into account the predicted effects of climate change;
      (b)   ensure that risk to life, property, community, economic activity and the environment during flood and storm tide inundation
            events is avoided or mitigated; and
      (c)   ensure that development does not increase potential for flood damage on­site or to other property.

(2)   The overall outcomes sought for the Flood Hazard overlay code are:
      (a)   Development in areas at risk from flood and storm tide inundation is compatible with the nature of the defined flood event or
            defined storm tide event.
      (b)   Development protects floodplains and the flood conveyance capacity of waterways.
      (c)   Development is resilient to flood and storm tide events by ensuring siting and design responds to and minimises potential
            risks of flood and storm tide inundation to people and property.
      (d)   Development directly, indirectly and cumulatively avoids an unacceptable increase in the extent or severity of flood or storm
            tide inundation and does not significantly increase the potential for damage on the site or to other properties.
      (e)   Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
      (f)   Development avoids the release of hazardous materials as a result of a flood event.
      (g)   Natural processes and the protective function of landforms and vegetation are maintained in flooding and inundation areas.

Table 8.2.6.3 ­ Criteria for assessable development
Performance outcomes                                                  Acceptable outcomes
Floodplain protection, immunity and safety ­ for development areas

PO1                                                                   AO1
Development provides that for all flood events up to and              The finished flood level is not less than the minimum design
including the DFE :                                                   levels specified in Table 8.2.6.4
﴾a﴿    the safety of people on the site is protected; and
﴾b﴿    the risk of damage to property on the site is avoided or
       minimised as far as practicable.


PO2                                                                AO2
All lots have sufficient area that is above the DFE flood level or The minimum area above flood level (flood free area) for each
where modelling is not available, the highest recorded flood       lot, is in accordance with Table 8.2.6.5.
level, to safely and adequately accommodate the intended
use.


PO3                                                                   PO3
For reconfiguring a lot or operational works, development is          Flood immunity for development areas is not achieved by filling
undertaken in a manner that ensures:                                  land below the 1%AEP flood level.
﴾a﴿    natural hydrological systems are protected from erosion,
       scour or flood damage on the premises or other           OR
       premises;
                                                                Where flood modelling is not available, flood immunity for
﴾b﴿    natural landforms and drainage lines are maintained to
                                                                development areas is not achieved by filling land below the
       protect the hydraulic performance of waterways and
                                                                highest recorded flood level.
       flood plain; and
﴾c﴿    development integrates with the natural landform rather
       than modifying the landform to suit the development as
       far as practicable.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 21 of 51

Section 22

Performance outcomes                                                Acceptable outcomes

PO4                                                                 AO4.1
For reconfiguring a lot, development does not compromise the        Development provides an effective evacuation route that
safety of people resulting from the flood risk associated with      remains passable, with sufficient flood warning time, to enable
events exceeding the DFE.                                           people to progressively evacuate to safe areas above the PMF
                                                                    in the face of advancing flood or waters for events that exceed
                                                                    the DFE.

                                                                    OR

                                                                    AO4.2
                                                                    Development provides for an area of sufficient size and
                                                                    dimensions on site above the PMF that allows for safe
                                                                    congregation and refuge.

                                                                    AO4.3
                                                                    Where the existing roads servicing a development provide a
                                                                    specific flood immunity (as determined by the Qld Transport
                                                                    Road and Drainage Design Manual, Queensland Urban
                                                                    Drainage Manual and the Australian Rainfall and Runoff
                                                                    Guide), all lots have access to the flood free area identified in
                                                                    Table 8.2.6.5 that matches the road immunity.
PO5                                                                 AO5
For reconfiguring a lot or operational works, development does      In the Flood Hazard Overlay, or in areas otherwise determined
not directly, indirectly or cumulatively alter the flood            to be subject to the DFE or DSTE, development ensures:
characteristics external to the development site for all flooding   ﴾a﴿   there is no loss of on­site flood storage capacity;
and inundation events up to and including the DFE or DSTE
                                                                    ﴾b﴿   all changes to level, depth, duration and velocity of
based on:
                                                                          floodwaters are contained within the site for all flood
﴾a﴿   current climate conditions; and                                     events up to and including the DFE based on current
﴾b﴿   incorporating an appropriate allowance for the predicted            climate and predicted impacts of climate change at
      impacts of climate change.                                          2100; and
                                                                    ﴾c﴿   there is no acceleration or retardation of flows, or any
                                                                          retardation in flood warning times, elsewhere on the
                                                                          floodplain and to any overland flow paths; and
                                                                    ﴾d﴿   there is no increased stormwater ponding on sites
                                                                          upstream, downstream or in the general vicinity of the
                                                                          site.

Resilient building design and form




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 22 of 51

Section 23

Performance outcomes                                          Acceptable outcomes

PO6                                                           AO6.1
Development ensures that building design and building form:   Buildings are designed to integrate well with the street level
﴾a﴿   accounts for potential flood risk;                      and the levels of adjoining properties to facilitate pedestrian
                                                              flows and visual and physical connectivity between the
﴾b﴿   is resilient to flood events; and
                                                              footpath and ground floors.
﴾c﴿   maintains a functional and attractive street address
      appropriate to the intended use.
                                                              AO6.2
                                                              Buildings incorporate appropriate screening to ensure that any
                                                              under­storey is not visible from the street, where such
                                                              screening does not impede flood water flows.

                                                              AO6.3
                                                              Residential buildings minimise risk from flooding by providing
                                                              parking and other low intensive, non­habitable uses at ground
                                                              level, rather than habitable uses.

                                                              AO6.4
                                                              Non­residential buildings and structures are oriented to the
                                                              street by activating the street frontage with appropriate uses
                                                              and urban design treatments such as recessed wall
                                                              treatments, screening or landscaping, whilst allowing for flow
                                                              through of flood waters on the ground floor.

                                                              Editor's Note— The use of flood resilient building materials is
                                                              also encouraged for building works up to the probable
                                                              maximum flood to reduce the consequences of flooding.

                                                              AO6.5
                                                              Basements and underground car parking areas are designed to
                                                              drain and function safely during a flood event and power failure.

                                                              Editor's note—Basements should have flood immunity above the
                                                              1%AEP defined flood event with alternative means to mechanical
                                                              pumping used to achieve such immunity.

Disaster management




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                     Page 23 of 51

Section 24

Performance outcomes                                            Acceptable outcomes

PO7                                                             AO7.1
Development supports, and does not unduly burden, disaster      Development is located to support self­evacuation of people
management response or recovery capacity or capabilities.       and ensure sufficient warning time for the nature of the use.

                                                                AO7.2
                                                                Development does not:
                                                                ﴾a﴿   increase the number of people calculated to be at risk
                                                                      from flooding;
                                                                ﴾b﴿   increase the number of people likely to need evacuation;
                                                                ﴾c﴿   shorten flood warning times for other uses in the
                                                                      floodplain; or
                                                                ﴾d﴿   impact on the ability of traffic to use evacuation routes,
                                                                      or unreasonably increase traffic volumes on evacuation
                                                                      routes.

                                                                AO7.3
                                                                Materials stored on site:
                                                                ﴾a﴿   are readily able to be moved in a flood event to a flood
                                                                      free area; or
                                                                ﴾b﴿   are contained in order to minimise movement in times of
                                                                      flood.

                                                                Editor's Note— Businesses should ensure that necessary
                                                                emergency and continuity plans are in place to account for the
                                                                potential need to evacuate personnel and to relocate property
                                                                prior to a flood event.
Essential network infrastructure
PO8                                                             AO8
Essential network infrastructure maintains effective function   Essential network infrastructure that is likely to fail to function
during and immediately after flood and storm tide inundation    or may result in contamination when inundated by flood water
events.                                                         (e.g. water supply pipeline air valves and the like) is located
                                                                above the DFE level (or where the DFE has not been modelled
                                                                for the area, above the highest recorded flood level for the
                                                                area).
Essential community infrastructure




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                        Page 24 of 51

Section 25

Performance outcomes                                              Acceptable outcomes

PO9                                                               AO9.1
Essential community infrastructure is able to function            Essential community infrastructure is sited and constructed to
effectively during and immediately after flood events.            ensure that flood levels comply with flood immunity
                                                                  requirements specified in Table 8.2.6.4.

                                                                  AO9.2
                                                                  Essential community infrastructure which is located below the
                                                                  specified flood immunity requirements:
                                                                  ﴾a﴿   is designed and constructed to function effectively
                                                                        during and immediately after the recommended flood
                                                                        level event; and
                                                                  ﴾b﴿   has direct access to low hazard evacuation routes or an
                                                                        emergency rescue area above the PMF if it is for
                                                                        emergency services (including emergency shelters,
                                                                        police facilities, hospitals and associated facilities).

Earthworks
PO10                                                              AO10
Excavation and filling for operational works only occur where     Filling, other than accessways, does not extend more than 3
they:                                                             metres beyond the footprint of a building, measured from the
﴾a﴿   result in the protection, rehabilitation and repair of      outer walls of the building.
      ecologically important areas, watercourses, drainage
      lines and wetlands;
﴾b﴿   do not adversely impact on the overall hydrology,
      hydraulics and flood capacity of a waterway;
﴾c﴿   do not directly, indirectly or cumulatively cause adverse
      impacts external to the site;
﴾d﴿   do not cause increased flooding, which adversely affects
      the safety or use of any land upstream or downstream;
﴾e﴿   do not cause ponding of water on the site or nearby
      land;
﴾f﴿   do not result in a reduction in flood storage capacity;
﴾g﴿   do not adversely affect the flow of water in any overland
      flow path; and
﴾h﴿   do not adversely affect the privacy or visual amenity of
      surrounding property.

Editor’s Note— The Earthworks Code sets out further
requirements for earthworks.
Hazardous materials




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                     Page 25 of 51

Section 26

Performance outcomes                                              Acceptable outcomes

PO11                                                            AO11.1
Development ensures that public safety and the environment      Materials manufactured or stored on site are not hazardous or
are not adversely affected by avoiding the release of hazardous noxious, or do not comprise materials that may cause a
materials into flood waters and the environment.                detrimental effect on the environment if discharged in a flood
                                                                event.

                                                                  OR

                                                                  AO11.2
                                                                  If a DFE is adopted, structures used for the manufacture or
                                                                  storage of hazardous material are located above the DFE level.

                                                                  OR

                                                                  AO11.3
                                                                  If a flood level is not adopted, hazardous materials and their
                                                                  manufacturing equipment are located on the highest part of the
                                                                  site to enhance flood immunity and designed to prevent the
                                                                  intrusion of flood waters.

                                                                  Editor’s Note— Refer to the Work Health and Safety Act
                                                                  2011 and associated Regulation and Guidelines, the
                                                                  Environmental Protection Act 1994 and the relevant building
                                                                  assessment provisions under the Building Act 1975 for
                                                                  requirements relating to the manufacture and storage of
                                                                  hazardous substances. Information is provided by Business
                                                                  Queensland on the requirements for storing and transporting
                                                                  hazardous chemical.

Table 8.2.6.4 ­ Flood Levels and Flood Immunity Requirements
Type of development                 Flood Level (Defined Flood    Minimum design level – surface Minimum finished floor level ­
                                    Event ) for a 2100 planning   level
                                    period

General
Business Activities                  1% AEP                       DFE/DSTE or Historical flood       DFE + 0.3m or Historical flood
                                                                  level                             level + 0.6m
Industrial Activities                1% AEP                       DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
                                                                  Historical flood level + 0.6m     level + 0.6m
Accommodation Activities             1% AEP                       DFE/DSTE + 0.3m or                 DFE + 0.3m or Historical flood
(excluding residential care                                       Historical flood level + 0.6m     level + 0.6m
facility)
Residential care facility            0.2% AEP                     DFE/DSTE or Historical flood       DFE + 0.3m or Historical flood
                                                                  level                             level + 1m
Community Activities                 0.2% AEP                     DFE/DSTE or Historical flood       DFE+ 0.3m or Historical flood
(education establishment,                                         level                             level + 1m
childcare centre)




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                       Page 26 of 51

Section 27

Type of development                 Flood Level (Defined Flood      Minimum design level – surface Minimum finished floor level ­
                                    Event ) for a 2100 planning     level
                                    period

Essential community infrastructure (recommended flood level) Editor's note­ Some emergency services and police facilities
(e.g. water police and search and rescue operations) are dependent on direct water access. The flood levels do not apply to these
aspects but other operational areas should be located above the recommended flood level to the greatest extent feasible.

Emergency services , other           0.2% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
than police station                                                 level                             level + 1m
Police facilities                    0.2% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
                                                                    level                             level + 1m
Hospital and associated              0.2% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
facilities                                                          level                             level + 1m
Stores of valuable records or        0.5% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
items of historical or cultural                                     level                             level + 1m
significance
Essential infrastructure (recommended flood level) Editor's note­ The recommended flood level only applies to electrical
and other equipment that, if damaged by flood water or debris, would prevent the plant from functioning. This equipment should
either be protected from damage or designed to withstand inundation.
Major switch yard and                0.5% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
substation                                                          level                             level + 1m
Power facilities                     0.2% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
                                                                    level                             level + 1m
Sewerage treatment plant             0.1% AEP                        DFE/DSTE or Historical flood     DFE + 0.3m or Historical flood
equipment                                                           level                             level + 1m
Water cycle management               0.5% AEP                        DFE/DSTE or Historical flood     DFE+ 0.3m or Historical flood
infrastructure (water treatment                                     level                             level + 1m
plant)
Other Editor's note­ Minimum design levels for infrastructure apply to standalone infrastructure only. Where infrastructure is
proposed as part of development, the minimum design levels nominated for that development category also apply to the
associated infrastructure.
Manufacture and storage of           1% AEP                         DFE/DSTE + 0.3m or                 DFE+ 0.3m or Historical flood
hazardous materials in bulk                                         Historical flood level +1m        level + 1m
Access roads and car parking         10% AEP                         DFE/DSTE + maximum                n/a
                                                                    inundation depth of 250mm
                                                                    during 1%AEP event at 2100
Collector roads and above            1% AEP                          DFE/DSTE                          n/a
Infrastructure other than            1% AEP                          DFE/DSFE or Historical flood      DFE + 0.3m or Historical flood
specified above                                                     level                             level + 1m

Table 8.2.6.5 ­ Minimum Size of Flood Free House Site Areas or Development Areas for Lots
Zone                                                               Modelled DFE or DSTE level or where not modelled,
                                                                   above the highest known flood level
Low Density Residential                                            100% of the lot
Medium Density Residential                                         100% of the lot
High Density Residential                                           100% of the lot



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 27 of 51

Section 28

Zone                                                                      Modelled DFE or DSTE level or where not modelled,
                                                                          above the highest known flood level
Tourist Accommodation                                                     100% of the lot
Major Centre                                                              100% of the lot
District Centre                                                           100% of the lot
Neighbourhood Centre                                                      100% of the lot
Local Centre                                                              100% of the lot
Innovation                                                                100% of the lot
Low Impact Industry                                                       1000m2
Medium Impact Industry                                                    1000m2
Community Facilities                                                      450m2
Rural Residential                                                         1000m2 plus additional area of effluent disposal
Rural                                                                     1000m2 plus additional area of effluent disposal
Recreation and Open Space                                                 1000m2 or 10% of the total site area, whichever is the greater
Environmental Management and Conversation                                  n/a


8.2.7                 Heritage Overlay Code

8.2.7.1               Application
(1)     This code applies to assessable development:
        (a)   subject to the Heritage Overlay shown on the overlay maps contained within Schedule 2 (Mapping) and listed in Table
              8.2.7.4 and Table 8.2.7.5 of this code; and
        (b)   identified as requiring assessment against the Heritage overlay code by the tables of assessment in Part 5 (Tables of
              assessment).

(2)     All provisions in this code are assessment benchmarks for applicable assessable development.


8.2.7.2               Purpose and overall outcomes
(1)     The purpose of the Heritage overlay code is to ensure :
        (a)   development on an identified local heritage place is compatible with the heritage significance of the place; and
        (b)   the streetscape character and significance of identified character areas are conserved and enhanced.

(2)     The overall outcomes sought for the Heritage overlay code are:
        (a)   Development on a local heritage place is compatible with the heritage significance of the place by:
              (i)     retaining local heritage places to a level that ensures the retention of their cultural heritage significance;
              (ii)    maintaining or encouraging as much as possible the appropriate use or adaptive reuse of a local heritage place to
                      provide for the future protection of its heritage values, while also protecting the amenity of adjacent uses;
              (iii)   protecting, as far as practical, the context and setting of the local heritage place;
              (iv)    ensuring that development on a local heritage place is sympathetic with the cultural heritage significance and retains
                      valued heritage features of the place.

        (b)   Development is appropriately managed to prevent damage and disturbance to local heritage places during construction
              and operational phases of development.
        (c)   Development in a character area is sympathetic to the streetscape character and heritage values of the area by retaining
              buildings, structures and other elements that contribute to the preferred character of the area and by complementing the
              predominant building styles in the street.
        (d)   For Cooroy­Maple Street Character Area:
              (i)     The historic business centre of Cooroy extending from Marara St in the north to Crystal Street in the south, including


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                       Page 28 of 51

Section 29

                   9­73 Maple Street and 19 Crystal Street, as shown on Heritage Overlay Map is retained and protected.
          (ii)     Business, community and residential buildings from the early to mid­twentieth century, which influence the character
                   of the area are retained.
          (iii)    Local heritage places within Table 8.2.7.4 of this overlay code are protected including:
                   (A)   Former Cooroy Butter Factory (Art Gallery), c.1930 – 11 Maple Street;
                   (B)   Former Ferguson’s Auctioneer’s Office, c.1910 – 21 Maple Street;
                   (C)   The Memorial Hall, c.1926 – 23­29 Maple Street;
                   (D)   Cooroy Post Office, c.1914 – 33 Maple Street;
                   (E)   Methodist (Uniting) Church and Church Hall, c.1911 – 51 Maple Street; and
                   (F)   Peachy’s House, c.1929 – 68 Maple Street.

          (iv)     Development reflects country town character elements reminiscent of Cooroy’s heritage characteristics.
          (v)      Development maintains and reflects the historic architectural features in Cooroy including the traditional building
                   designs of a predominately low rise and low impact scale, typified by lightweight construction, with a timber frame,
                   generally raised above ground on stumps, many featuring verandah elements, sunhoods and awnings to window
                   and wall openings and simple roof designs, either gabled or hipped. Typical materials used include timber for
                   cladding and corrugated iron for roofs.
          (vi)     The business centre characteristics, including continuous shop fronts with buildings predominantly single storey,
                   reflecting a human scale with flat cantilevered awnings over the footpath that create an intimate town atmosphere,
                   are retained and protected.
          (vii)    Outdoor dining, verandas and glazed shopfronts provide an active interesting streetscape and places for people to
                   meet.
          (viii)   Development along Maple Street, south of the business centre maintains a domestic scale and form consistent with
                   the Queensland vernacular with landscaped setbacks and front yards without front fences, and low impact domestic
                   scale buildings that contribute to the open character of this part of the character area.

    (e)   For Cooroy­Tewantin Road Character Area:
          (i)      The Tewantin Road Character Area extending along the south­eastern side of Tewantin Road at the eastern
                   approach to Cooroy township, including 26 to 52 Tewantin Road, as shown on Heritage Overlay Map is protected.
          (ii)     The relatively large allotments with Queensland vernacular style timber and iron houses on stumps, many featuring
                   verandah elements, sunhoods to windows and wall openings and simple roof designs, either gabled or hipped are
                   retained.
          (iii)    The Anglican Church of the Holy Nativity at 46 Tewantin Road contributes to the Tewantin Road Character Area’s
                   features.

    (f)   For Pomona Character Area:
          (i)      The Pomona Character Area comprising the central area of Pomona township, south west of the railway line
                   including business, residential and community premises within parts of Reserve Street, Memorial Avenue, Station
                   Street, Rectory Street, Hospital Street, Red Street and Signal Street, as shown on Heritage Overlay Map is protected.
          (ii)     Local heritage places within Table 8.2.7.4 of this code are protected including—
                   (A)   Pomona Post Office, c1936 – 11 Memorial Ave;
                   (B)   Memorial School of Arts, c.1926 – 6 Reserve Street;
                   (C)   Ambulance Building, c.1917; 1971 – 17 Reserve Street;
                   (D)   Former Pomona State School (Pomona & District Kindergarten and Childcare Centre), c.1907;
                   (E)   Stan Topper Park, 21 Reserve Street;
                   (F)   The Rotunda, c1939 – 2 Bazzo Park, Reserve Street; and
                   (G)   Pomona Hotel, c1901; 1913 – 1 Station Street.

          (iii)    The urban residential areas of Pomona continue to be characterised by typical Queensland vernacular houses
                   (pitched roofs and lightweight construction raised on stumps) and open landscaped front yards with no or only low
                   fences to frontages.
          (iv)     Development maintains the historic architectural features and grid pattern streets.
          (v)      The business centre along Memorial Avenue and the eastern side of Reserve Street maintains continuous


**FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 29 of 51

Section 30

                      shopfronts making use of simple parapet walls for advertising.
             (vi)     Buildings along Memorial Avenue reflecting the art deco style built after a fire in 1939 are protected and maintain
                      features reflective of the art deco style including pressed tin ceilings, geometric decorative features and parapets,
                      light, neutral and pastel colours, and rendered masonry construction.
             (vii)    Shopfronts along Memorial Avenue form a row of continuous narrow shopfronts that directly adjoin the street
                      frontage, providing an active streetscape with outdoor dining opportunities and a place for people to meet.
             (viii)   Buildings in Memorial Avenue maintain wide awnings over the street front, with integrated signage and large
                      windows providing an open and welcoming feel and visual interest and character to the streetscape.
             (ix)     Key public buildings which form part of Pomona’s identity including the School of Arts Hall, Post Office, old
                      Courthouse, the Pomona Hotel, old ANZ bank building, the railway buildings and the like are protected.

      (g)    For Cooran Character Area:­
             (i)      The Cooran Character Area comprising the commercial precinct of Cooran along the south western side of King
                      Street, extending north­west from the corner of Prince Street, as shown on Heritage Overlay Map is protected.
             (ii)     The Cooran Character Area maintains a number of small­scale businesses, community buildings and residences
                      that remain from the early to mid­twentieth century when the town grew into a thriving rural centre and railhead.
             (iii)    Key places, running east to west along King Street are protected and contribute to Cooran’s heritage character
                      including—
                      (A)   Memorial School of Arts, c.1906 – 14 King Street;
                      (B)   Former Commercial Bank, c.1906 (now Country Kitchen café) – 16 King Street;
                      (C)   Former Butchers Shop, c.1905 (now private house) – 18 King Street;
                      (D)   Former Baker, c.1935­40 – 24A King Street;
                      (E)   Former Alfredsons Joinery, c1934 (Trading Post & Secondhand dealers) – 28 King Street;
                      (F)   Former Railway Goods Shed, c.1890 – 30 King Street; and
                      (G)   Former Alfredsons Joinery office/garage, c.1962 (Mill Studio) – 30 King Street.

             (iv)     The rural railway town character which is derived from its discrete scale, linear form and confinement to the one side
                      of King Street adjacent to the North Coast rail line is maintained.
             (v)      Cooran is characterised by traditional building designed largely of a domestic form and scale or derived from
                      conversions or additions to domestic buildings, that are low rise and low scale.
             (vi)     The Memorial School of Arts is protected as an impressive, decorative and articulated building along the streetscape.
             (vii)    Buildings in Cooran are typified by:
                      (A)   lightweight construction, with a timber frame, generally raised above ground on stumps, many featuring
                            verandah elements, sunhoods to windows and wall openings;
                      (B)   gabled or hipped roof designs with moderate slope and awnings sloping down over the footpath and front
                            entries represent the dominant character; and
                      (C)   timber for cladding and corrugated iron for roofs.

             (viii)   Buildings abut or are positioned close to the front boundary and are framed by a grassed road reserve that slopes up
                      from the street.
             (ix)     Landscaped setbacks between buildings contribute to the character and rhythm of the streetscape and visually
                      integrate the separate buildings into the surrounding rural landscape.

Editor's Note—The Heritage overlay code does not apply to Aboriginal cultural heritage which is protected under the Aboriginal
Cultural Heritage Act 2003.

Editor's Note—Table 8.2.7.5 lists places on the Queensland Heritage Register at the time of gazettal of the planning scheme.
Contact the Queensland Government for the latest list of places.

Editor's Note—development on State heritage places is regulated by the Queensland Heritage Act 1992.

Table 8.2.7.3 ­ Criteria for assessable development

Material change of use involving a local heritage place                            Table 8.2.7.3 ­ Criteria for assessable

  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 30 of 51

Section 31

development (part)
Performance outcomes                                          Acceptable outcomes
Material change of use involving a local heritage place

PO1                                                           AO1
Development is compatible with the cultural heritage          Development is undertaken in accordance with the Australian
significance of the local heritage place.                     ICOMOS Charter for Places of Cultural Heritage Significance
                                                              (Burra Charter).

                                                              Editor’s Note—Council may require a heritage impact
                                                              statement prepared by a suitably qualified heritage consultant,
                                                              in accordance with PSP1 Preparing a well made application,
                                                              demonstrating how the development mitigates and minimises
                                                              detrimental impacts on cultural heritage significance and
                                                              supports ongoing conservation management of the local
                                                              heritage place.
PO2
Local heritage places are conserved and protected by          No acceptable outcome provided
providing for their adaptive reuse, provided the new use is
compatible with the ongoing conservation management of the
local heritage place.




Reconfiguring a lot involving a heritage place or character area                    Table 8.2.7.3 ­ Criteria for
assessable development
Performance outcomes                                          Acceptable outcomes

Reconfiguring a lot involving a heritage place or character area
PO3                                                           AO3
Development does not:                                         Development is undertaken in accordance with the Australian
(a)   reduce public access to the local heritage place;       ICOMOS Charter for Places of Cultural Heritage Significance
(b)   result in a local heritage place being obscured from    (Burra Charter).
      public view; and
                                                              Editor’s Note—Council may require a heritage impact
(c)   obscure or destroy any pattern of an historic
                                                              statement prepared by a suitably qualified heritage consultant,
      subdivision, the landscape setting or the scale and
                                                              in accordance with PSP1 Preparing a well made
      consistency of the urban fabric relating to the local
                                                              application demonstrating how the development mitigates and
      heritage place or character area.                       minimises detrimental impacts on cultural heritage significance
                                                              and supports ongoing conservation management of the local
                                                              heritage place.


Building work for demolition or removal of a local heritage place                    Table 8.2.7.3 ­ Criteria for
assessable development
Performance outcomes                                          Acceptable outcomes

Building work for demolition or removal of a local heritage place




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                    Page 31 of 51

Section 32

Performance outcomes                                           Acceptable outcomes

PO4                                                            AO4.1
Local heritage places are retained, where practicable, and not Local heritage places are retained on their existing premises;
removed from character areas.
                                                               OR

                                                               AO4.2
                                                               Where a local heritage place cannot be practicably retained on
                                                               its existing premises, it is relocated to an alternative location
                                                               within the Noosa Shire and reinstated to a standard that is
                                                               suitable for reuse, provided relocation of the building or
                                                               structure will not adversely impact on the cultural heritage
                                                               significance of the heritage site, having regard to whether the
                                                               maintenance of its significance is dependent on the building
                                                               on structure being retained in its existing location;

                                                               Editor’s Note—Council may require a heritage impact statement
                                                               prepared by a suitably qualified heritage consultant, in
                                                               accordance with PSP1 Preparing a well made
                                                               application,demonstrating that the cultural heritage significance
                                                               will not be adversely affected.

                                                               OR
                                                               AO4.3
                                                               Demolition only occurs where the—
                                                               ﴾a﴿   building or structure cannot be practicably retained on
                                                                     the existing premises; and
                                                               ﴾b﴿   the premises are physically constrained such that the
                                                                     building or structure cannot be relocated to an
                                                                     alternative site; or
                                                               ﴾c﴿   the building or structure is structurally unsound and not
                                                                     capable of economic repair.

                                                               Editor’s Note—Council may require a heritage impact statement
                                                               prepared by a suitably qualified heritage consultant, in
                                                               accordance with PSP1 Preparing a well made
                                                               application demonstrating that the building or structure is
                                                               structurally unsound and not capable of economic repair.

                                                               AO4.4
                                                               Where a local heritage place is to be relocated or demolished,
                                                               an archival quality photographic record is made of the features
                                                               of the place, which meets the standards outlined in the
                                                               Queensland Government Guideline: Archival recording of
                                                               heritage places.




Building work or operational work involving a local heritage place                       Table 8.2.7.3 ­ Criteria for
assessable development
Performance outcomes                                           Acceptable outcomes



 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                      Page 32 of 51

Section 33

Building work or operational work involving a local heritage place
PO5                                                                  AO5
Development conserves and is subservient to the features and         Development does not alter, damage remove or conceal
values of the local heritage place that contribute to its cultural   significant features of the local heritage place.
heritage significance and does not adversely affect the
character, setting or appearance of the local heritage place.        Editor's Note—Council may require a heritage impact
                                                                     statement prepared by a suitably qualified heritage consultant,
                                                                     in accordance with PSP1 Preparing a well made
                                                                     application demonstrating how the development mitigates any
                                                                     adverse impacts on the local heritage place.
PO6
Development on local heritage places:                                No acceptable outcome provided
﴾a﴿   respects the original architectural style and proportions
      of the relevant era;
﴾b﴿   retains the original roof form and pitch;
﴾c﴿   retains or conforms with the original veranda, window
      and door design and detailing;
﴾d﴿   ensures building works are compatible with the scale,
      height and bulk of the building;
﴾e﴿   provides visual and structural disconnection of new
      works from the existing building;
﴾f﴿   locates building works to the rear of the existing building
      or to where they are not visible or overly obtrusive from
      the street or public places;
﴾g﴿   uses materials of the relevant architectural era;
﴾h﴿   retains existing mature vegetation around the site,
      particularly where it contributes to the heritage
      significance of the place;
﴾i﴿   ensures new garages, fencing and landscaping are
      compatible with the scale and design of the relevant
      architectural era; and
﴾j﴿   ensures excavations and earthworks do not have a
      detrimental impact on sites of archaeological potential.

PO7
The construction timing, transport, access, storage and use of No acceptable outcome provided
materials on and adjacent to the local heritage place are
managed to avoid adversely impacting on the local heritage
place.


Retention of historical streetscapes within character areas                         Table 8.2.7.3 ­ Criteria for assessable
development
Performance outcomes                                                 Acceptable outcomes

Retention of historical streetscapes within character areas




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 33 of 51

Section 34

Performance outcomes                                           Acceptable outcomes

PO8                                                            AO8.1
The valued streetscape character within character areas are    Character buildings and heritage sites within character areas
protected through the retention of buildings that contribute   are retained (see Figure AP3­6B for examples of character
positively to that character.                                  buildings);

                                                               Editor's Notes:­Council may request a report prepared by a
                                                               suitably qualified heritage consultant, in accordance with PSP1
                                                               Preparing a well made application demonstrating whether the
                                                               building is a character building.

                                                               OR

                                                               AO8.2
                                                               Where a character building or heritage site cannot be
                                                               practicably retained on its existing premises, the building or
                                                               structure is relocated to an alternative location within the
                                                               Noosa Shire and reinstated to a standard that is suitable for
                                                               reuse, provided relocation of the character building or heritage
                                                               site will not result in the loss of valued streetscape character;

                                                               Editor's Notes:­Council may request a report be prepared by a
                                                               suitably qualified heritage consultant, in accordance with PSP1
                                                               Preparing a well made application demonstrating that the
                                                               character area will not be adversely affected.

                                                               OR

                                                               AO8.3
                                                               Demolition only occurs where the—
                                                               ﴾a﴿   building or structure cannot be practicably retained on
                                                                     the existing premises; and
                                                               ﴾b﴿   the premises are physically constrained such that the
                                                                     building or structure cannot be relocated to an
                                                                     alternative location; or
                                                               ﴾c﴿   the building or structure is structurally unsound and not
                                                                     capable of economic repair.

                                                               Editor's Notes:­Council may request that an assessment is
                                                               undertaken by a suitably qualified structural engineer, in
                                                               accordance with PSP1 Preparing a well made application
                                                               demonstrating that the building or structure is structurally
                                                               unsound and not capable of economic repair.

                                                               AO8.4
                                                               Where a character building or local heritage place is to be
                                                               relocated or demolished, an archival quality photographic
                                                               record is made of the features and values, which meets the
                                                               standards outlined in the Queensland Government Guideline:
                                                               Archival recording of heritage places.


Building works or operational works within character areas                      Table 8.2.7.3 ­ Criteria for assessable


 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                      Page 34 of 51

Section 35

development
Performance outcomes                                                   Acceptable outcomes

Building works or operational works within character areas
PO9
Development in character areas is compatible with the setting          No acceptable outcome provided
and valued streetscape character by—
﴾a﴿    respecting the form, bulk, scale and height of heritage
       sites or character buildings within the streetscape;
﴾b﴿    complementing original roof forms and pitch within the
       streetscape;
﴾c﴿    locating building works to the rear of the existing
       building or to where they are not visible or overly
       obtrusive from the street or public places;
﴾d﴿    conforming with the original fencing, veranda and façade
       design and detailing within the streetscape;
﴾e﴿    using materials and elements that reflect the valued
       character; and
﴾f﴿    retaining existing mature vegetation around the site.

PO10
The construction timing, transport, access, storage and use of No acceptable outcome provided
materials on and adjacent to the character area and character
buildings are managed to avoid adversely impacting on
features and values.


Advertising and signage                Table 8.2.7.3 ­ Criteria for assessable development
Performance outcomes                                                   Acceptable outcomes
Advertising devices and interpretive signage
PO11
Interpretive signs do not adversely impact on the valued character     No acceptable outcome provided
of a local heritage place or character area.
Advertising devices
PO12                                                                   No acceptable outcome provided
Advertising devices located on a local heritage place or within a
character area are designed and sited so as to—
(a)    be compatible with the cultural heritage significance and
       valued character of the place or area;
(b)    not obscure the appearance or prominence of the heritage
       or character values when viewed from the major road
       network or any adjoining public open space.

Table 8.2.7.4 ­ Local Heritage Places
         Citation                 Map Reference                    Street No                 Address         RPD

Boreen Point
NIL                                                                                                     71

         Citation                 Map Reference                    Street No                 Address         RPD

Como


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                              Page 35 of 51

Section 36

          Citation                Map Reference                  Street No           Address                    RPD

Harry's Hut                                                                    Cooloola Section, Great           National Park
                                                                                 Sandy National Park,
                                                                                                Como

          Citation                Map Reference                  Street No           Address                    RPD

Kin Kin
Kin Kin Masonic Lodge         OM­HC­6 ­ Kin Kin Village             11             Bowman St, Kin Kin                 105K6576
Country Life Hotel               OM­HC­6 ­ Kin Kin                  69       Cnr Main St & Wahpunga                1RP40395
                                     Village                                           Road, Kin Kin
St Luke’s Anglican            OM­HC­6 ­ Kin Kin Village             3             Grady Street, Kin Kin               206K6575
Church
Kin Kin Junction Uniting         OM­HC­6 ­ Kin Kin                 980          Pomona Kin Kin Road,             300MCH1048
Church                               Village                                                  Kin Kin
Kin Kin State School          OM­HC­6 ­ Kin Kin Village           26­32            Main Street, Kin Kin           75CP908661
Former ES&A Bank and             OM­HC­6 ­ Kin Kin                61­63            Main Street, Kin Kin      Part of 1RP196642
Residence                            Village
Editor's note­ the
heritage listing applies to
only part of the lot; being
a curtilage measured no
less than 5 metres from
the rear of the residence
and no less than 3 metres
from the western side
elevation of the
residence.
Memorial School of Arts       OM­HC­6 ­ Kin Kin Village             50             Main Street, Kin Kin          214MCH4199
Former Post Office            OM­HC­6 ­ Kin Kin Village             54             Main Street, Kin Kin            1RP102399

          Citation                Map Reference                  Street No           Address                    RPD

Cooroibah
Tronson’s canal                                           1065                 2km downstream from             3&9RP846206 &
                                                                              Noosa River exit of Lake             113M37271
                                                                             Cootharaba (off McKinnon
                                                                                     Drive, Ringtail Ck

          Citation                Map Reference                  Street No           Address                    RPD

Cooroy
Cooroy Show Society              OM­HC­10 ­ Cooroy                                 Bounded by Garnet             157MCH4833
Grounds including                                                               Street, Cooroy Ck and
Pavillion                                                                     Mary River Road, Cooroy
Cooroy State School              OM­HC­10 ­ Cooroy                                  Elm Street, Cooroy          98MCH810557
Memorial Hall                    OM­HC­10 ­ Cooroy                23­29           Maple Street, Cooroy                1C56038
Former Ferguson’s                OM­HC­10 ­ Cooroy                  21            Maple Street, Cooroy                5C56022
Auctioneer’s Office
Former Cooroy Butter            OM­HC­10 ­ Cooroy                   11            Maple Street, Cooroy    1C56021, 2RP56236 &
Factory                                                                                                             1RP48512
Post Office                      OM­HC­10 ­ Cooroy                  33            Maple Street, Cooroy             2RP147678
Methodist (Uniting)             OM­HC­10 ­ Cooroy                   51            Maple Street, Cooroy           12&13 C5605
Church & Church Hall


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                  Page 36 of 51

Section 37

          Citation               Map Reference         Street No           Address                     RPD

Peachy’s House                 OM­HC­10 ­ Cooroy          68           Maple Street, Cooroy                  2RP50050
Former Post Office             OM­HC­10 ­ Cooroy          54             Main Street, Kin Kin               1RP102399
Former Presbyterian            OM­HC­10 ­ Cooroy          22             Miva Street, Cooroy                  216C5602
Church
Cooroy War Memorial            OM­HC­10 ­ Cooroy          54              Triangle between                    283C5602
                                                                   Tewantin Road and Kauri
                                                                       & Diamond Streets,
                                                                                    Cooroy

          Citation               Map Reference         Street No           Address                     RPD

Coastal Communities
NIL

          Citation               Map Reference         Street No           Address                     RPD

Black Mountain
Black Mountain School                                    482       Black Mountain Road, via                176MCH1025
Buildings                                                                          Cooroy

          Citation               Map Reference         Street No           Address                     RPD

Federal
Federal State School                                     482       Black Mountain Road, via                176MCH1025
                                                                                   Cooroy
Federal Memorial Hall                                    1612        Bruce Highway, Federal                320MCH1469

          Citation               Map Reference         Street No           Address                     RPD

Ridgewood
Ridgewood Hall                                            3        Donnely's Road,              1RP96477
                                                                   Ridgewood

          Citation               Map Reference         Street No           Address                     RPD

Cooran
Former Maternity Hospital OM­HC­8 ­ Cooran Village      16­18         George Street, Cooran                 1SP143421
and Residence
Cooran State School         OM­HC­8 ­ Cooran Village      31          James Street, Cooran                  3SP104263
Memorial School of Arts     OM­HC­8 ­ Cooran Village      14            King Street, Cooran                 38RP42022
Former Alfredson's              OM­HC­8 ­ Cooran        28­30           King Street, Cooran                43SP108794
Joinery Complex (The Mill           Village
Studio)
Former Cooran Uniting           OM­HC­8 ­ Cooran          13          Queen Street, Cooran                  68RP36937
Church                              Village

          Citation               Map Reference         Street No           Address                     RPD

Pomona
St Patrick’s Church            OM­HC­9 ­ Pomona           1          Church Street, Pomona                     13P5013
                                   Village
Former St Patrick’s            OM­HC­9 ­ Pomona           3          Church Street, Pomona                     12P5013
Catholic School (Private           Village
Residence)




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                            Page 37 of 51

Section 38

         Citation                 Map Reference     Street No           Address             RPD

Noosa Agricultural,             OM­HC­9 ­ Pomona       12       Exhibition Street, Pomona      2RP47620
Horticultural & Industrial          Village
Showgrounds and
Pavilion
Former Page Motors              OM­HC­9 ­ Pomona     17­19        Factory Street, Pomona    11­12RP35078
(Pomona Driveway)                   Village
Part of Former Railway          OM­HC­9 ­ Pomona       9          Factory Street, Pomona      5RP801753
Hotel (Hollyhock Cottage)           Village
Part of Former Railway          OM­HC­9 ­ Pomona       9a         Factory Street, Pomona      6RP801753
Hotel (Memory Lane                  Village
Antiques)
Part of the Former              OM­HC­9 ­ Pomona       9a         Factory Street, Pomona      6RP801573
Railway Hotel (Pomona               Village
Produce Store)
Uniting Church                  OM­HC­9 ­ Pomona       27         Factory Street, Pomona      15RP35078
                                    Village
Former Noosa Shire              OM­HC­9 ­ Pomona       29         Factory Street, Pomona      35RP35081
Council Chambers                    Village
(Noosa Museum)
Former Pomona Butter            OM­HC­9 ­ Pomona       20         Factory Street, Pomona     183MCH2848
Factory                             Village
Page Furnishers P/L             OM­HC­9 ­ Pomona       31         Factory Street, Pomona      36RP35082
Factory                             Village
Pomona Post Office              OM­HC­9 ­ Pomona       11              Memorial Avenue,        1RP44334
                                    Village                                    Pomona
Former Kybong School            OM­HC­9 ­ Pomona       2        Mountain Street, Pomona      352MCH5234
(Pomona Scout Group                 Village
Hall)
Ambulance Building              OM­HC­9 ­ Pomona       17        Reserve Street, Pomona      2­3RP47369
                                    Village
Former Pomona State             OM­HC­9 ­ Pomona       21             Stan Topper Park,     358MCH5157
School (Pomona &                    Village                     Reserve Street, Pomona
District Kindergarten and
Childcare Centre)
The Rotunda                     OM­HC­9 ­ Pomona       2             Bazzo Park, Reserve          4P5018
                                    Village                              Street, Pomona
Pomona Hotel                    OM­HC­9 ­ Pomona       1          Station Street, Pomona       1RP68598
                                    Village
Cemetery                        OM­HC­9 ­ Pomona       36         Pomona­Kin Kin Road,         142C8249
                                    Village                                   Pomona

         Citation                 Map Reference     Street No           Address             RPD

Noosa Heads
Alkira Apartments            OM­HC­13 Noosa Heads      31            Noosa Drive, Noosa      2BUP106009
                                                                                  Heads

         Citation                 Map Reference     Street No           Address             RPD

Noosaville




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                             Page 38 of 51

Section 39

         Citation                 Map Reference       Street No           Address                 RPD

Cooloola Cruises Slipway      OM­HC­12 ­ Noosaville     172                Gympie Terrace,        164CP907410
                                                                               Noosaville
Maisies Restaurant            OM­HC­12 ­ Noosaville   247­249              Gympie Terrace,         11SP146048
                                                                               Noosaville
Massoud’s Jetty               OM­HC­12 ­ Noosaville     244                Gympie Terrace,        157CP904560
                                                                               Noosaville
Massoud’s Slipway             OM­HC­12 ­ Noosaville     156                Gympie Terrace,        156CP904560
                                                                               Noosaville
Wallace House                 OM­HC­12 ­ Noosaville               Wallace Park, Noosaville          2RP839623

         Citation                 Map Reference       Street No           Address                 RPD

Tewantin
Doonella Cottage               OM­HC­11 ­ Tewantin       49       Doonella Street, Tewantin             2T16337
Martin House                   OM­HC­11 ­ Tewantin       67       Doonella Street, Tewantin          1RP50839
Former Shop (Pelican           OM­HC­11 ­ Tewantin       3         Pelican Street, Tewantin          1RP74197
Place)
Royal Mail Hotel               OM­HC­11 ­ Tewantin      118              Poinciana Avenue,          1RP845244
                                                                                  Tewantin
Donaldson Residence            OM­HC­11 ­ Tewantin       76              Poinciana Avenue,        604RP884055
                                                                                  Tewantin
German mines in RSL            OM­HC­11 ­ Tewantin                    RSL Park, Poinciana           13MCH5443
Park                                                                    Avenue, Tewantin
Tewantin War Memorial          OM­HC­11 ­ Tewantin                  Town Square, Tewantin           15MCH5443
Former Coach Waiting           OM­HC­11 ­ Tewantin       1           Ward Street, Tewantin          1RP162818
Room (Private
Residence)
Former Ringtail Hall           OM­HC­11 ­ Tewantin       1                   Sunrise Road,          5RP116185
(Tinbeerwah Hall)                                                              Tinbeerwah

Table 8.2.7.5 ­ Places on the Queensland Heritage Register
         Citation                 Map Reference       Street No           Address                 RPD

Places on the Queensland Heritage Register
Mill Point Settlement Site                                         Cooloola Section, Great       Lot 21 NPW659
                                                                     Sandy National Park,
                                                                      (Elanda Point) Lake
                                                                             Cootharaba
Kin Kin Sawmill                                          1         Sister Tree Creek Road,     Lot 195 SP148790
                                                                                    Kin Kin
Cooroy Railway Station                                   14             Myall Street, Cooroy   Lot 303 RP911165
Cooroy Lower Mill Site                                             Lower Mill Road, Cooroy       Lot 5 SP173771
Kiln
Pomona Police Station                                    22            Red Street, Pomona          Lot 4 P50113
Residence & Former
Lock up and Pomona
Court House
Former Cooroora                                          9          Station Street, Pomona        Lot 1 RP35095
Masonic Temple



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                    Page 39 of 51

Section 40

            Citation              Map Reference                   Street No                   Address                        RPD

Majestic Theatre                                                      3                 Factory Street, Pomona              Lot 21 SP14118
Alfredson’s Joinery, Pre­                                            29                     King Street, Cooran            Lot 42 SP108794
Cut House workshop and                                                                                                      Lot A SP108794
Sawmill (former)                                                                                                                (easement)
Halse Lodge                                                           2                     Halse Lane, Noosa               Lot 2 RP865533
                                                                                                        Heads
Noosa River Caravan                                                   4               Russel Street, Noosaville          Lot 131 SP143417
Park


8.2.8                  Landslide Hazard Overlay Code

8.2.8.1                Application
(1)   This code applies to assessable development:
      (a)     subject to the Landslide Hazard Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
      (b)     identified as requiring assessment against the Landslide Hazard overlay code by the tables of assessment in Part 5
              (Tables of assessment).

(2)   All provisions in this code are assessment benchmarks for applicable assessable development.

Editor's Note­;Planning scheme policy 9 for assessment of natural hazards includes guidance for preparing a site specific geo­technical
analysis.

8.2.8.2                Purpose and overall outcomes
(1)   The purpose of the Landslide Hazard overlay code is to ensure:
      (a)     development avoids or mitigates the potential adverse impacts of landslide hazard on people, property, community,
              economic activity and the environment; and
      (b)     development on steep land is avoided or limited in scale and intensity and is sensitively located and designed to minimise
              adverse impacts on landscape character, scenic amenity, environment and public safety.

(2)   The overall outcomes sought for the Landslide Hazard overlay code are:
      (a)     Development in areas at risk from landslide hazard is compatible with the nature of the hazard.
      (b)     Development is resilient to landslide hazards by ensuring siting, design and access responds to and minimises potential
              risks to people, property and the environment.
      (c)     Natural processes and the protective function of landforms and vegetation are maintained in landslide hazard areas.
      (d)     Development avoids the release of hazard materials as a result of landslide hazard events.
      (e)     Development supports and does not unduly burden disaster management response or recovery capacity and capabilities.
      (f)     Development directly, indirectly or cumulatively avoids an unacceptable increase in the extent or severity of landslide
              hazards on the site or to other properties.
      (g)     Development on steep land occurs only where scenic amenity, landscape character and environmental quality and integrity
              is maintained and safe and efficient access can be provided.

Table 8.2.8.3 ­ Criteria for assessable development
Performance outcomes                                                   Acceptable outcomes
Landslide hazard




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 40 of 51

Section 41

Performance outcomes                                             Acceptable outcomes

PO1                                                              AO1.1
Development maintains the safety of people, property and         Development, including associated access, is not located on
hazardous materials stored in bulk from the risk of landslide.   land identified as a landslide hazard area on a Landslide
                                                                 Hazard Overlay Map;

                                                                 OR

                                                                 AO1.2
                                                                 Development, including associated access, is located outside
                                                                 moderate, high and very high landslide hazard areas and areas
                                                                 with 15% slope or greater, as determined by a site­specific
                                                                 slope­analysis;

                                                                 Editor's Note—A site­ specific geotechnical assessment may
                                                                 be used to demonstrate that although the proposed
                                                                 development is shown on the Landslide Hazard Overlay as
                                                                 being in the moderate, high or very high landslide hazard area,
                                                                 the landslide risk is low or very low.

                                                                 OR

                                                                 AO1.3
                                                                 A site­specific geotechnical assessment is prepared by a
                                                                 registered professional engineer to certify that:

                                                                 ﴾a﴿   the stability of the site, including associated buildings
                                                                       and infrastructure, will be maintained and operational for
                                                                       the life of the development;
                                                                 ﴾b﴿   the site is not subject to the risk of landslide activity
                                                                       originating from other land, including land above the site;
                                                                       and
                                                                 ﴾c﴿   development of the site will not increase the risk of
                                                                       landslide activity on other land;




                                                                 Editor's Note— PSP8 Natural Hazards provides further
                                                                 guidance on assessing landslide hazard.

                                                                 AND

                                                                 AO1.4
                                                                 Any specific measures identified in a site specific
                                                                 geotechnical assessment for stabilising the site or
                                                                 development are to be fully implemented.


Essential community infrastructure                Table 8.2.8.3 ­ Criteria for assessable development (part)
Performance outcomes                                             Acceptable outcomes

Essential community infrastructure


 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                       Page 41 of 51

Section 42

Performance outcomes                                         Acceptable outcomes

PO2                                                          AO2.1
Essential community infrastructure is is able to function    Development involving essential community infrastructure is
effectively during and immediately after landslide events.   not located within a landslide hazard area as identified on
                                                             a Landslide Hazard Overlay Map;

                                                             OR

                                                             AO2.2
                                                             Development involving essential community infrastructure is
                                                             located in a low or very low landslide hazard area and on land
                                                             less than 15% slope, as determined by a site­specific slope­
                                                             analysis;

                                                             Editor's Note—A site­specific geotechnical assessment may
                                                             be used to demonstrate that although the proposed
                                                             development is shown on the Landslide Hazard Overlay as
                                                             being in the moderate, high or very high landslide hazard area,
                                                             the landslide risk is low or very low.

                                                             AO2.3
                                                             A site­specific geotechnical assessment is prepared by a
                                                             registered professional engineer to certify that:
                                                             ﴾a﴿   the long term stability of the site, including associated
                                                                   buildings and infrastructure, will be maintained and
                                                                   operational for the life of the development;
                                                             ﴾b﴿   access to the site will not be impeded by a landslide
                                                                   event;
                                                             ﴾c﴿   the community infrastructure will not be adversely
                                                                   affected by landslide activity originating from other land,
                                                                   including land above the site; and
                                                             ﴾d﴿   development of the site will not increase the risk of
                                                                   landslide activity on other land.


Sloping sites, landscape character and scenic amenity                  Table 8.2.8.3 ­ Criteria for assessable
development (part)
Performance outcomes                                         Acceptable outcomes

Sloping sites, landscape character and scenic amenity




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                   Page 42 of 51

Section 43

Performance outcomes                                             Acceptable outcomes

PO3                                                              AO3.1
Development, including associated access, is designed and        Buildings present no more than two storeys at any one point
constructed to:                                                  when viewed from the road or other public space.
﴾a﴿   be responsive to the natural topography and constraints
      imposed by the slope;                                      AO3.2
                                                                 Buildings and associated accesses are not constructed on
﴾b﴿   retain the natural landforms, landscape character,
                                                                 land with a slope greater than 25%.
      vegetation, including the visual amenity of hill slopes
      and ridgelines;
                                                                 AO3.3
﴾c﴿   visually integrate into the streetscape and the natural    No additional lots intended to provide house sites are created
      surrounds; and                                             on land with a slope of 25% or greater.
﴾d﴿   ensure buildings and structures are not visually
      obtrusive, particularly from ridgelines, public open       AO3.4
      spaces, scenic routes and other critical vantage points,   Buildings are designed to follow the natural landform rather
      outside the site.                                          than modify it.

                                                                 Editor's note­ Designs that step down the slope using split
                                                                 level construction or elevated construction on suspended
                                                                 floors are a preferred alternative to standard slab on ground
                                                                 construction reliant on cut and fill of sites.

                                                                 AO3.5
                                                                 The extent of filling or excavation is revegetated immediately
                                                                 following completion of the works.

                                                                 AO3.6
                                                                 Any building, including any associated car parking structure:­
                                                                 ﴾a﴿   has a maximum undercroft height at the perimeter of the
                                                                       building of 3 metres above ground level; or
                                                                 ﴾b﴿   incorporates landscape screening for the full height of any
                                                                       undercroft higher than 3 metres above ground level at the
                                                                       perimeter of the building.


                                                                 Editor's note­ Vertical battens are also useful to enclose the
                                                                 undercroft area.

                                                                 AO3.7
                                                                 On sloping sites roof lines are generally parallel with contours
                                                                 of the land and roof pitch does not exceed 15 degrees.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 43 of 51

Section 44

Performance outcomes                                                   Acceptable outcomes

PO4                                                                    AO4.1
Development on sloping sites provides safe and efficient               Driveways are not steeper than 20% for more than 20 metres
access for vehicles and pedestrians                                    or one quarter of their length, whichever is the lesser, and
                                                                       not steeper than 25% in any location.

                                                                       AO4.2
                                                                       Vehicle turning areas are provided at the end of driveways so
                                                                       that it is not necessary to reverse up or down driveways.

                                                                       AO4.3
                                                                       Where a driveway is steeper than 20% in any part, it is
                                                                       provided with a slip­resistant surface.


8.2.9               Regional Infrastructure Overlay Code

8.2.9.1             Application
(1)   This code applies to assessable development:
      (a)   subject to the Regional Infrastructure overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
      (b)   identified as requiring assessment against the Regional Infrastructure overlay code by the tables of assessment in Part 5
            (Tables of assessment).

(2)   All provisions in this code are assessment benchmarks for applicable assessable development.


8.2.9.2             Purpose and overall outcomes
(1)   The purpose of the Regional Infrastructure overlay code is to:
      (a)   For water resources:
            (i)     protect Lake Macdonald Catchment located wholly within the Noosa Shire; and
            (ii)    protect the Mary River Catchment partially contained within Noosa Shire.

      (b)   For major electricity infrastructure:
      (c)   (i)     ensure development is compatible with and does not adversely affect the operation of the gas pipeline; and
            (ii)    ensure development is compatible with and does not adversely affect the operation of major electricity infrastructure,

(2)   The overall outcomes sought for the Regional Infrastructure overlay code are:
      (a)   For water resources:
            (i)     Development is located, designed and managed to maintain or improve water quality, flow regimes, environmental
                    values and natural systems in a water supply catchment.
            (ii)    Development ensures there is no cumulative impact on water quality.
            (iii)   Development adopts sustainable land use practices within the water catchment to avoid adverse impact on the
                    environment.
            (iv)    Development avoids any adverse effects on the water supply infrastructure.
            (v)     The Mary River drinking water intake is not adversely affected by development or the effects of development.

      (b)   For major energy infrastructure:
      (c)   (i)     Development provides for adequate separation from the Major Electricity Transmission Line Corridor.
            (ii)    Development avoids compromising the operation of major electricity infrastructure, including the Major Electricity
                    Transmission Line.
            (iii)   The number of people exposed to the potential adverse impacts of major electricity infrastructure is minimised.
            (iv)    Development provides for adequate separation from the gas pipeline corridor.


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 44 of 51

Section 45

            (v)      Development provides for adequate separation from the gas pipeline and corridor.
            (vi)     Development avoids compromising the future operation of the gas pipeline within the gas pipeline corridor.
            (vii)    Development avoids the storage of hazardous materials in proximity to the gas pipeline corridor.
            (viii)   The number of people exposed to the potential adverse impacts of the future gas pipeline in the gas pipeline
                     corridor is minimised.


Table 8.2.9.3         Criteria for assessable development­ Water Resources
Performance outcomes                                                  Acceptable outcomes

Water catchment
PO1
Development does not cause adverse effects on:                       No acceptable outcomes provided
(a)   the quality and quantity of water entering Lake Macdonald,
      Cedar Pocket Dam or its tributaries, or the Mary River         Editor’s Notes—
      drinking water intake;                                         Requirements relating to water quality, stormwater
(b)   flow regimes, flooding levels or flood volumes outside the     management and effluent disposal are contained in the Water
      boundaries of the site; and                                    Quality and Drainage Code in Part 9.
(c)   the environmental values, land resources and natural
      systems in these catchments.                                   Requirements relating to excavation and filling are contained in
                                                                     the Earthworks Code in Part 9.

                                                                     Requirements relating to flooding and environment protection
                                                                     and waterways management are contained in the Flood Hazard
                                                                     Overlay Code and the Biodiversity, Waterways and Wetlands
                                                                     Overlay Code in Part 8.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 45 of 51

Section 46

PO2                                                                    AO2.1
Development within a water supply buffer does not include the          For rural activities the stockpiling of waste litter, manure and other
incineration or burial of waste and all other waste is collected and   organics is only undertaken as follows:
stored in weather proof, sealed waste receptacles, located in          (a)   on surfaces constructed with permanent impervious
roofed and bunded areas, for disposal by a licensed contractor.              underlay to minimise leaching;
                                                                       (b)   located outside of an effluent irrigation area;
                                                                       (c)   located away from groundwater and recharge areas;
                                                                       (d)   sized to accommodate the proposed disposal timeframes;
                                                                       (e)   designed with run­off diversion drainage upstream to
                                                                             prevent uncontaminated stormwater movement into the
                                                                             area;
                                                                       (f)   bunded to capture contaminated run­off for appropriate
                                                                             treatment and disposal; and
                                                                       (g)   covered, desirably within a shed but otherwise with
                                                                             weatherproof material.


                                                                       Editor's note—Groundwater and recharge areas are shown on
                                                                       the Queensland Government Wetland Info mapping.

                                                                       AO2.2
                                                                       The reuse of waste litter, manure and other organics as soil
                                                                       conditioners or fertilizers is not undertaken on­site.

                                                                       AO2.3
                                                                       Composting activities are not undertaken on­site.

                                                                       AO2.4
                                                                       Carcasses are not buried on­site except as required in
                                                                       accordance with any emergency animal disease directive by a
                                                                       biosecurity agency.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 46 of 51

Section 47

PO3                                                                  AO3.1
Development does not discharge wastewater unless                     Development does not generate wastewater.
demonstrated to not compromise the drinking water supply
environmental values.                                                OR

                                                                     AO3.2
                                                                     Wastewater generated from the development is collected and
                                                                     contained on site, and is:
                                                                     (a)   lawfully disposed to sewer;
                                                                     (b)   transferred off­site for treatment/disposal to an
                                                                           appropriately licensed facility;
                                                                     (c)   treated to meet the drinking water supply environmental
                                                                           values prior to release; or
                                                                     (d)   reused on­site in a closed­cycle irrigation scheme,
                                                                           industrial processes, washing/cleaning or other purpose.


                                                                     AO3.3
                                                                     Where treated wastewater is irrigated to land, it will:
                                                                     (a)   be confined to a dedicated area of land on­site;
                                                                     (b)   be suitably located and sized; and
                                                                     (c)   use irrigation practices that will not harm groundwater and
                                                                           on­site surface water quality.


                                                                     Editor's note­ Developments involving the irrigation of wastewater
                                                                     will need to provide a MEDLI Modelling Report demonstrating the
                                                                     nominated land area for wastewater irrigation is suitably located
                                                                     and sized to accommodate design wastewater loads, storages are
                                                                     suitably sized to accommodate design wastewater loads, and
                                                                     proposed irrigation practices will not damage water quality. It is
                                                                     recommended the modelling exercise incorporate scenarios
                                                                     based on both a 10­year and 20­year planning horizon and
                                                                     incorporate a minimum of three irrigation concepts.
PO4
Management, handling and storage of hazardous chemicals              No acceptable outcome provided
(including fuelling of vehicles) within a Water supply buffer, is
undertaken in secured, climate controlled, weather proof, level
and bunded enclosures.
PO5                                                                  AO5
Development maintains an adequate separation distance and            Development complies with the separation distances by stream
avoids areas of potential flood inundation to protect waterways or   order as specified in Table 8.2.9.3A
water supply sources.
Bulk Water Infrastructure
PO6                                                                  AO6
Development is set back from bulk water supply infrastructure to:    Development is setback in accordance with Table 8.2.9.3B
(a)   avoid safety risks to people and property;                     ‘Recommended separation distances from bulk water supply
                                                                     infrastructure’.
(b)   minimise noise and visual impacts to people and property;
      and
(c)   ensure the physical integrity and operation, maintenance
      and expansion of the infrastructure is not compromised.

PO7                                                                  AO7
Vegetation planted near pipelines does not pose any risk to the      Planting near pipelines complies with the current Seqwater
physical integrity and operation of the bulkwater pipelines.         Network Consent Guidelines.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 47 of 51

Section 48

PO8                                                                  AO8
Development is located and designed to maintain required             Development does not restrict access to Bulk water supply
access to Bulk water supply infrastructure.                          infrastructure of any type or size, having regard to:
                                                                     (a)   buildings or structures;
                                                                     (b)   gates and fences;
                                                                     (c)   storage of equipment or materials;
                                                                     (d)   landscaping or earthworks or stormwater or other
                                                                           infrastructure.

Table 8.2.9.3A ­ Separation distances to waterways and water supply sources
Development type and activities                Stream Order 1 to 3                          Stream Order 4 or greater

Intensive animal industry                      50 metres                                    100 metres
Aquaculture                                    Case­by­case basis                           Case­by­case basis
All other agricultural or forestry land uses   50 metres                                    100 metres
Extractive industry                            50 metres                                    100 metres
All other industrial uses                      100 metres                                   100 metres
Outdoor sport and recreation
                                               50 metres                                    100 metres
Major sport, recreation and entertainment
Service station                                50 metres                                    100 metres
All other developments                         50 metres                                    100 metres


Table 8.2.9.3B ­ Recommended separation distances from bulk water supply infrastructure
Bulk water supply infrastructure ­ asset       Type of development                          Recommended separation distance
type                                                                                        minimum

Pipelines and channels (1)                     Buildings/Structures/Earthworks              20 metres from edge of pipe
                                               Blasting(2,3)                                200 metres from edge of pipe
Water treatment plants and water quality       Sensitive Land Use                           250 metres from building footprint
facilities
                                               Buildings/Structures/Earthworks              20 metres from building footprint
                                               Blasting (2,3)                               200 metres from building footprint
Reservoir facilities                           Buildings/Structures/Earthworks              20 metres from building footprint
                                               Blasting (2,3)                               200 metres from building footprint
Pump stations                                  Sensitive Land Use                           100 metres from building footprint
                                               Buildings/Structures/Earthworks              20 metres from building footprint
                                               Blasting (2,3)                               200 metres from building footprint
Dam structures and weirs (4)                   Earthworks Dam/Weir Height(5) 0­5 meters     50 metres from the toe of the dam/weir
                                               Earthworks Dam/Weir Height(5) 5­10 metres 100 metres from the toe of the dam/weir
                                               Earthworks Dam/Weir Height(5) 10­15          150 metres from the toe of the dam/weir
                                               metres
                                               Earthworks Dam/Weir Height(5) 15­20          200 metres from the toe of the dam/weir
                                               metres
                                               Earthworks Dam/Weir Height(5) > 20 metres 500 metres from the toe of the dam/weir
                                               Blasting (2,3)                               500 metres from dam wall/earth
                                                                                            embankment/weir footprint




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 48 of 51

Section 49

1  Channels are included in the pipelines and channels layer SPP IMS but are not differentiated from pipelines. Where an applicant
identifies the bulk water supply infrastructure is a channel rather than a pipe, applicants should contact the utility provider to discuss
appropriate separation distances.
2 Refers to any type of development involving blasting <500 kg charge mass per delay, use of explosives, piling, and other
vibratory/compaction machinery (over 20t centrifugal force) during construction and/or operation. For blasting over 500 kg, applicants are
to contact the asset owner as a greater separation zone may apply.
3 It is recommended that blasting provisions be included in an extractive industry code (or similar).
4 For dam structures and weirs, applicants should contact the utility provider to determine the toe of the dam/weir.
5 Dam/weir height is to be taken at the maximum section of the dam/weir (from dam/weir crest to dam/weir toe).



Table 8.2.9.4          Criteria for assessable development ­ Gas pipeline and Major Electricity Infrastructure

Performance outcomes                                                    Acceptable outcomes

Gas pipeline corridor and buffer area
PO1                                                                     AO1.1
Development, including uses and works are constructed and               Buildings and structures are setback a minimum of 40 metres
operated to avoid:                                                      from a gas pipeline corridor.
(a)     compromising the viability of the gas pipeline corridor; or
                                                                        AO1.2
(b)     damaging or adversely affecting the existing or future
                                                                        The use does not involve the storage of flammable, explosive or
        operation of a gas pipeline within the gas pipeline corridor.
                                                                        other hazardous materials within 200 metres of the gas pipeline
                                                                        corridor.
                                                                        OR

                                                                        AO1.3
                                                                        Written conformation of the pipeline license holder of Petroleum
                                                                        Pipeline License 32 that the setback distance and design of the
                                                                        development does not impact the future use of the gas pipeline.

                                                                        Editor's note­ should a lesser setback distance be proposed, it is
                                                                        recommended that the applicant consult with the relevant gas
                                                                        pipeline manager prior to the lodgement of a development
                                                                        application to determine how compliance with the performance
                                                                        outcome can be achieved.




Performance outcomes                                                    Acceptable outcomes

Major Electricity Infrastructure
PO2
Development does not increase risk to community health or               No acceptable outcome provided
safety, or the operation and reliability of major electricity
infrastructure
PO3                                                                     AO3.1
Development involving a sensitive land use is sufficiently              With the exception of class 10 buildings, buildings associated
separated from major electricity infrastructure and substations to      with a sensitive land use maintain a setback of at least:
minimise the likelihood of nuisance or complaint.                       (a)   50 metres from a transmission substation;
                                                                        (b)   10 metres from any other substation; and
                                                                        (c)   30 metres from a transmission line easement.

                                                                        AO3.2
                                                                        Buildings are not located within an easement for a distribution
                                                                        line.




    **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 49 of 51

Section 50

PO4                                                                     AO4
Development adjoining substations are located and designed to           For development adjoining substations, noise emissions do not
avoid noise nuisance from infrastructure.                               exceed 5db(A) above background noise level at the sensitive
                                                                        receptor of a building associated with a sensitive land use,
                                                                        measured in accordance with AS1055.
PO5                                                                     AO5
Wherever practicable new lots and buildings are orientated to           Buildings are orientated so that the majority of outdoor living areas
avoid direct overlooking of electricity infrastructure.                 and windows of habitable rooms face away from towers or other
                                                                        major electricity infrastructure.
PO6                                                                     AO6
For sensitive land uses, there is sufficient space within the site to   A minimum 3 metres wide densely planted landscaped buffer is
establish landscaping which substantively screens and softens           provided along the boundary adjoining the electricity infrastructure,
poles, towers, or other structures and equipment associated with        including provision for advanced trees and shrubs that will grow to
major electricity infrastructure and substations.                       a minimum height of 10 metres.

                                                                        Editor's note­ Applicants may find guidance in Powerlink
                                                                        Queensland's brochure "Using Vegetation to screen transmission
                                                                        lines". Applicants should also note that vegetation will need to
                                                                        maintain statutory clearances.
PO7                                                                     AO7.1
Vegetation does not pose a risk to the safety or reliability of         Vegetation planted within the easement of an overhead powerline
electricity infrastructure.                                             or, where there is no easement, the area of influence of a
                                                                        powerline, has a mature height of no more than 3.5 metres.

                                                                        AO7.2
                                                                        Vegetation planted within an underground powerline easement
                                                                        does not have a mature root system in excess of 150 millimetres
                                                                        in depth and is not located directly over the powerline.

                                                                        AO7.3
                                                                        Regardless of the width of the easement, vegetation adjoining
                                                                        easements must be separated from the power pole or other
                                                                        infrastructure by a distance at least equal to the maximum mature
                                                                        height of the vegetation.
PO8                                                                     AO8.1
Any earthworks are undertaken in a way which:                           For overhead distribution infrastructure, no earthworks are
(a)   ensures stability of the land on or adjoining the electricity     undertaken within 10 metres of a tower, pole or stay.
      infrastructure;
                                                                     AO8.2
(b)   does not otherwise impact on the safety and reliability of the
                                                                     For overhead transmission infrastructure, no earthworks are
      electricity infrastructure; and
                                                                     undertaken within 20 metres of a tower, pole or stay.
(c)   does not restrict the placement or use of the electricity
      infrastructure provider's equipment.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 50 of 51

Section 51

PO9                                                               AO9.1
Services and infrastructure works (such as stormwater,            Underground services are not located within 20 metres of a tower,
sewerage, water and the like) do not impact on the safety and     pole, stay or substation boundary.
reliability of substations or major electricity infrastructure.
                                                                  AO9.2
                                                                  No valve pits occur within:
                                                                  (a)   for transmission infrastructure, 60 metres of a tower, pole
                                                                        or stay; or
                                                                  (b)   for distribution infrastructure, 20 metres of a tower, pole or
                                                                        stay.

                                                                  AO9.3
                                                                  Underground services traversing an easement cross at right
                                                                  angles to the overhead or underground lines.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 51 of 51

Section 52

 Noosa Shire Planning Scheme
 Part 9 Development codes
 9.1 Preliminary
     (1)   Development codes are codes for assessment where identified as an applicable code in Part 5 (Tables of assessment).
     (2)   Use codes, works codes and other development codes are specific to each planning scheme area.

     Editor's Note— the Planning Regulation may establish requirements for development it prescribes to be accepted (for example,
     community residences and forestry) and assessment benchmarks that it prescribes to be assessable (for example, reconfiguration
     of one lot into two).
     (3)   The following are the use codes for the planning scheme:
           (a)    Low Density Housing Code
           (b)    Caretaker's Accommodation, Dwelling Unit and Rural Workers' Accommodation
           (c)    Dual Occupancy and Multiple Dwelling
           (d)    Special Residential Code
           (e)    Visitor Accommodation Code
           (f)    Home­Based Business Code
           (g)    Business Activities Code
           (h)    Community Activities Code
           (i)    Entertainment Activities Code
           (j)    Industry Activities Code
           (k)    Recreation Activities Code
           (l)    Rural Activities Code


     (4)   The following are the works codes for the planning scheme:
           (a)    Driveways and Parking Code
           (b)    Earthworks Code
           (c)    Existing Services Code
           (d)    Fire Services for Common Private Title Code
           (e)    Landscaping Code
           (f)    Sustainable Building Design Code
           (g)    Transport Code
           (h)    Water Quality and Drainage Code
           (i)    Waterways Works Code
           (j)    Waste Management Code

     (5)   The following are the other development codes for the planning scheme:
           (a)    Reconfiguring a Lot Code




**FINAL DRAFT ­ Post Consultation 2019**                                                                                     Page 1 of 1

Section 53

 Noosa Shire Planning Scheme
 Part 9 Development codes
 9.2 Development that cannot be made assessable in accordance with schedule 6 of
 the Planning Regulation 2017
     Editor's Notes—The following schedules of the Regulation are relevant to the Noosa planning scheme
           Schedule 6, Part 2, section 6 of the Regulation, Material change of use for community residence
           Schedule 12 of the Regulation, Particular reconfiguring a lot requiring code assessment
           Schedule 13 of the Regulation, Requirements for cropping involving forestry for wood production




**FINAL DRAFT ­ Post Consultation 2019**                                                                     Page 1 of 1

Section 54

9.3.1              Low Density Housing Code

9.3.1.1            Application
This code applies to acceptable development which is subject to requirements and to assessable development identified as requiring
assessment against the Low Density Housing code by the tables of assessment in Part 5 (Tables of assessment).

9.3.1.2            Purpose and overall outcomes
(1)   The purpose of the Low density housing code is to ensure dwelling houses, community residences, rooming
      accommodation and short term accommodation (where no more than one detached dwelling on the site) :
        (a)   are appropriately located;
        (b)   achieve a high level of comfort and amenity for occupants;
        (c)   maintain amenity and privacy of neighbouring residential premises; and
        (d)   are compatible with the character and streetscape of the local area.
(2)   The overall outcomes sought for the Low density residential code are:
      (a)     Development incorporates a high standard of design and makes a positive contribution to the streetscape character of the
              area in which it is located.
      (b)     Development is sited and designed to protect the amenity and privacy of neighbouring premises.
      (c)     Development provides a high level of safety, security and amenity for residents.
      (d)     Development is provided with an acceptable level of infrastructure and services.
      (e)     Where not in a sewerage service area, effluent disposal systems are designed and sited to avoid adverse effects on the
              environment.
      (f)     Driveways and crossovers provide safe and reasonable vehicle access from the carriageway to the property boundary,
              minimise adverse effects on Council’s infrastructure and ensure safety for all users of the footpath.
      (g)     Community residences in the Low density residential zone are of a domestic scale with traffic levels which do not
              unreasonably affect the residential amenity of neighbours.
      (h)     Secondary dwellings are small scale, subordinate to the dwelling and provide housing choice and amenity for the
              occupants.
      (i)     Rooming accommodation in the Low density residential zone is of domestic scale and provides housing choice to meet the
              varying needs of the community.
      (j)     Buildings relocated from other sites do not pose a health or safety risk or adversely affect the amenity of their
              neighbourhood or existing infrastructure.
      (k)     Development maintains the natural landscape character and visual quality of hillslopes and ridgelines and avoids adverse
              impacts on the environmental values of the land.
FOR ACCEPTED DEVELOPMENT
The requirements for Acceptable Development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with the acceptable solutions is considered to satisfy the requirements. If development complies with
some, but not all, acceptable outcomes, an application for Code Assessment will be necessary and the application will be
assessed against the relevant Performance Outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.


Table 9.3.1.3 ­ Criteria for assessment

Location           9.3.1.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                  Page 1 of 8

Section 55

Location
PO1                                                                AO1.1
Dwelling houses, rooming accommodation, community                  Dwelling houses (including secondary dwellings) and community
residences and short­term accommodation (for holiday homes)        residences are anticipated in the Low density residential zone,
are located in low density environments where they:                Rural residential zone and Rural zone.
(a)   provide a high level of comfort and amenity for occupants;
                                                                   AO1.2
(b)   maintain amenity and privacy of neighbouring premises;
                                                                   Rooming accommodation provides housing choice within urban
(c)   are compatible with the character and streetscape of the     boundaries.
      local area; and
(d)   do not alienate land intended for higher density living.     AO1.3
                                                                   Buildings constructed as dwelling houses may be available for
                                                                   short­term accommodation where:
                                                                   (a)   occupied by short term guests on no more than 4
                                                                         occurrences in any calendar year; and
                                                                   (b)   occupied by short term guests for a total of no more than 60
                                                                         nights in any calendar year.

                                                                   Editor’s Note— Short­term accommodation must not constitute or
                                                                   be used as a party house as separately defined in Schedule 1 and
                                                                   addressed in Part 1.8.


Effects of Use         9.3.1.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Effects of Use
Removal homes
PO2                                                                AO2.1
A removal home—                                                    Any part of a removal home that is affected by termite attack,
(a)   does not have an adverse impact on the amenity of the        borers, dry rot or severe weathering or is damaged as a
      premises or surrounding premises; and                        consequence of relocation, is repaired or replaced using new or
                                                                   sound second­hand materials.
(b)   maintains the safety of people and property.
                                                                   AO2.2
                                                                   Where located within the urban boundary, external surfaces of the
                                                                   building are cleaned and painted.

                                                                   Editor’s Note— the urban boundary is indicated on the zone
                                                                   maps contained within Schedule 2.

                                                                   Editor’s Note— applicants will be required to pay a performance
                                                                   bond to Council before final building approval is granted. The
                                                                   bond is held by Council until all external building works are
                                                                   completed to a satisfactory level, usually within a 12 to 24 month
                                                                   time frame.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 2 of 8

Section 56

Performance outcomes                                                   Acceptable Outcomes
Housing choice
PO3                                                                    AO3
A secondary dwelling:                                                  A secondary dwelling:
(a)   forms part of a dwelling house and is not subdivided from        (a)   has a maximum gross floor area of 65m²;
      the balance of the dwelling house;                               (b)   has no more than 2 bedrooms;
(b)   contributes to housing choice for members of the one             (c)   does not occur on any property covered by a Building Unit
      household;                                                             Plan; and
(c)   protects the low density residential, rural residential or rural (d)   does not occur on a property that already contains a dual
      character of the zone;                                                 occupancy or secondary dwelling.
(d)   does not occur on a property covered by a Building Unit
      Plan or any property already containing more than one
      dwelling;
(e)   is accompanied by sufficient car parking.

PO4                                                                    AO4
Rooming accommodation is located on a site with convenient             Development is located within:
access to employment or education as well as goods and                 (a)   1,500 metres walking distance, via a sealed pathway, of
services including public transport.                                         land within the Major centre zone, District centre zone or
                                                                             800 metres of land within the Neighbourhood centre zone;
                                                                             or
                                                                       (b)   800 metres walking distance, via a sealed pathway of a
                                                                             pedestrian access point of a hospital or tertiary education
                                                                             establishment; or
                                                                       (c)   400 metres walking distance, via a sealed pathway, of a
                                                                             Translink bus stop.


Building design and services                 9.3.1.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes
Building design and services




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 3 of 8

Section 57

Performance outcomes                                                  Acceptable Outcomes
Service and utilities
PO5                                                                   AO5.1
Development is provided with:                                         If located within the urban boundary, the dwelling is connected to
(a)   a level of infrastructure and services that is appropriate to   reticulated water supply, sewerage, stormwater drainage and
      its setting and sufficient for the intended use;                telecommunications infrastructure networks (where available to
                                                                      the lot).
(b)   an effluent treatment and disposal system that does not
      have an adverse effect on ecologically important areas or
                                                                      Editor’s Note—the urban boundary is indicated on the zone
      water quality; and
                                                                      maps contained within Schedule 2.
(c)   adequate onsite water storage to support the efficient use
      of water and is adequate for everyday use of the occupants. AO5.2
                                                                  Where there is no reticulated water supply, the premises is
                                                                  serviced with a rainwater tank with the following minimum water
                                                                  supply capacity:
                                                                      (a)   for dwellings with no more than 3 bedrooms – 45,000 litres;
                                                                            or
                                                                      (b)   for dwellings of more than 3 bedrooms or where including
                                                                            a secondary dwelling on the same premises – 60,000
                                                                            litres.

                                                                      AO5.3
                                                                      If located on a lot where reticulated sewerage is not available to
                                                                      the lot, the dwelling is connected to an on­site effluent treatment
                                                                      and disposal system.

                                                                      Editor’s Note—the Plumbing and Drainage Act 2003 sets out
                                                                      requirements for on­site effluent treatment and disposal systems.
Landscaping
PO6                                                                   AO6
Buildings and structures allow for sufficient space for outdoor       Soft landscaping is provided and retained to a minimum of 20% of
activities, garden areas and screening to surrounding land uses.      the site area.


Car parking
PO7                                                                   AO7
Sufficient car parking is provided to accommodate the number of       Car parking is provided in accordance with Table 9.4.1.4 of the
vehicles likely to use the site.                                      Driveways and parking code.
Driveway and crossover

Editor’s Note—In addition to the following benchmarks for accepted development subject to requirements for driveway and
crossovers, approval is required from Council to construct or modify all crossovers.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 4 of 8

Section 58

Performance outcomes                                                   Acceptable Outcomes
Access Design
PO8                                                                    AO8.1
The design, management and maintenance of the access                   Driveways and crossovers are designed to comply with Council's
facilitates:                                                           standard drawings RS­049, RS­050, RS­056 and addendum as
(a)   safe and convenient use for vehicles, pedestrians and            applicable.
      cyclists;
                                                                       AO8.2
(b)   vehicles negotiating without contacting the driveway or
                                                                       Where a footpath exists, the driveway meets the road reserve at
      crossover surface; and
                                                                       the level of the existing footpath.
(c)   stormwater disposal without any negative impacts on the
      surrounding area.                                                AO8.3
                                                                       Driveways within the property:
                                                                       (a)   have a maximum gradient of 20% and vertical curves to
                                                                             ensure no scraping for a standard vehicle; or
                                                                       (b)   have a maximum gradient of 25% provided–
                                                                              (i)    the length of the driveway steeper than 20% does
                                                                                     not exceed 6 metres; and
                                                                              (ii)   there is a change in gradient not less than 2 metres
                                                                                     in length and not greater than 12:5% at the ends of
                                                                                     the 25% section of the driveway.

PO9                                                              AO9
The driveway and crossover design avoids using structures within The driveway and crossover i s designed without significant
the road reserve.                                                alteration to the existing road reserve whereby the finished surface
                                                                 level of the driveway is consistent in height with the existing height
                                                                 of the road reserve.

                                                                       Editor’s Note—Should the design not comply with the standard
                                                                       drawings, including any cut or fill within the road reserve, an
                                                                       operational works application to Council for a non­standard
                                                                       driveway is required.
Materials
PO10                                                                   AO10
Driveways and crossovers are to be able to withstand loadings          No pavers or permeable pavement systems are used within the
from vehicles and the use of pavers is avoided.                        road reserve.

                                                                       Editor’s Note—Examples of the types of pavers to avoid include
                                                                       clay, concrete and permeable pavement products.
Surface water
PO11                                                                   AO11
Driveways are designed to:                                             Driveways have a minimum grade of 1% away from any adjoining
(a)   prevent water from ponding or entering buildings;                buildings and are formed to drain to landscaped areas.

(b)   provide an opportunity for filtering of stormwater prior to it
      leaving the site; and
(c)   not reduce the stormwater carrying capacity of roadways.

Protection of infrastructure
PO12                                                                 AO12
Driveways do not damage or interfere with the location, function of, Driveways are located not less than 1.0 metre from stormwater
or access to Council infrastructure.                                 infrastructure.

                                                                       Editor’s Note—If the driveway covers or is within 1.0 metre of
                                                                       stormwater infrastructure, an operational works application to
                                                                       Council for a non­standard driveway is required.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 5 of 8

Section 59

Performance outcomes                                              Acceptable Outcomes

Streetscape and effect on traffic network
PO13                                                              AO13.1
The visual impact of driveways on the streetscape and             Areas adjoining driveways disturbed as a result of the driveway
surrounding area is minimised and significant adverse impacts     construction are grassed or planted to minimise visual impact
on the traffic network are avoided.                               and stabilise the soil.

                                                                  AO13.2
                                                                  Vehicular access avoids disturbance to the tree protection zone of
                                                                  trees on public land.
Driveway Location
PO14                                                              AO14.1
Driveways and crossovers are located so they do not impede the    Only one driveway and crossover is provided.
safe and efficient use of the road network.
                                                                  AO14.2
                                                                  Where the premises has frontage to more than one formed and
                                                                  sealed road and the roads have differing orders in the Road
                                                                  Hierarchy, the driveway and cross­over is provided on the frontage
                                                                  with the lower order.

                                                                  AO14.3
                                                                  For corner lots, driveways and crossovers are located in
                                                                  accordance with Council's standard drawings.

                                                                  AO14.4
                                                                  If in the Rural zone or Rural Residential zone, the driveway and
                                                                  cross­over is located to provide minimum safe sight distances in
                                                                  accordance with Austroads.

                                                                  Editor's Note ­ An operational works application is required for a
                                                                  second driveway.
Bushfire Hazard Management
PO15                                                              AO15
Where located in a Bushfire Hazard Area as shown on the           Within a bushfire hazard area where there is no reticulated water
Bushfire Hazard Overlay Map in Schedule 2 and not in a water      supply, the premises has:
service area, an adequate, reliable, safely located and freely    (a)   an accessible dam, swimming pool or water tank available
accessible water supply is provided for fire fighting purposes,         for firefighting purposes with an onsite water volume of not
which is in addition to day to day water supply.                        less than 5,000 litres; and
                                                                  (b)   a water supply outlet pipe 50 millimetres in diameter and
                                                                        fitted with a standard fire brigade fitting connected to the
                                                                        water supply (other than where the water supply is in a
                                                                        swimming pool or dam).

                                                                  Editor’s Note — Water supply capacity for firefighting purposes is
                                                                  in addition to water supply capacity for household use.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 6 of 8

Section 60

Performance outcomes                                                  Acceptable Outcomes

Flood Hazard Area
PO16                                                                  AO16.1
Development is designed and sited to ensure risk to people and        Where the development is located in the Flood Hazard Area as
property from flooding is avoided or minimised.                       shown on Flood Hazard Overlay Map in Schedule 2,
                                                                      the finished floor level of habitable rooms is at least 300
                                                                      millimetres above the Defined flood event (DFE);

                                                                      OR

                                                                      AO16.2
                                                                      Where the DFE has not been modelled for the area, the finished
                                                                      floor level of habitable rooms is at least 500 millimetres
                                                                      above the highest recorded flood.

                                                                      Editor's Note—The QDC mandatory provisions MP3.5 also apply
                                                                      to the construction of buildings in flood hazard areas.
PO17
Underground car parking areas are designed to drain and               No acceptable outcome provided
function safely during a flood event and power failure.
                                                                      Editor's note—Basements should have flood immunity above the
                                                                      1%AEP defined flood event with alternative means to mechanical
                                                                      pumping used to achieve such immunity.


Major Electricity Infrastructure & Substations
PO18                                                                  AO18.1
Development is sufficiently separated from major electricity          Development including any sensitive land uses is at least:
infrastructure and substations to minimise the likelihood of                 50 metres from a transmission substation;
                                                                      (a)
nuisance or complaint.
                                                                      (b)    10 metres from any other substation; and
                                                                      (c)    30 metres from a transmission line easement.

                                                                      AO18.2
                                                                      Habitable buildings are not located within an easement for a
                                                                      distribution line.
PO19                                                           AO19
Development is located and designed to avoid or minimise noise Noise emissions do not exceed 5db(A) above background noise
nuisance from the use of infrastructure.                       level internal to a habitable building measured in accordance with
                                                               AS1055.
PO20                                                                   AO20
Wherever practicable habitable buildings are orientated to avoid       Where adjoining substations or major electricity infrastructure,
direct overlooking of major electricity infrastructure or substations. habitable buildings are orientated so that the majority of outdoor
                                                                       living areas and windows of habitable rooms face away from
                                                                       the infrastructure.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 7 of 8

Section 61

Performance outcomes                                               Acceptable Outcomes

Earthworks and Drainage
PO21                                                               No acceptable outcome provided
Earthworks and drainage operational works do not directly,
indirectly or cumulatively cause adverse                           Editor's Note—Development should ensure that filling does not
impacts external to the development site by:                       impact on the amenity and usability of neighbouring properties
(a)   causing ponding of water on the site or nearby land;         (including loss of privacy caused by relative level changes) or
                                                                   offsite drainage.
(b)   increasing flooding, which adversely affects the safety or
      use of any land upstream and downstream;
(c)   adversely affecting the flow of water in any
      overland flow path; and
(d)   adversely affecting the privacy or visual amenity
      of surrounding property.

Landslide Hazard Area
PO22                                                               AO22.1
Development maintains the safety of people, property and           Development, including associated access, is not located on land
hazardous materials stored in bulk from the risk of landslide.     identified as a landslide hazard area on a Landslide Hazard
                                                                   Overlay Map.

                                                                   AO22.2
                                                                   Development, including associated access, is located outside
                                                                   moderate, high and very high landslide hazard areas and areas
                                                                   with 15% slope or greater, as determined by a site­specific slope­
                                                                   analysis;

                                                                   Editor's Note—A site­ specific geotechnical assessment may be
                                                                   used to demonstrate that although the proposed development is
                                                                   shown on the Landslide Hazard Overlay as being in the moderate,
                                                                   high or very high landslide hazard area, the landslide risk is low or
                                                                   very low.

                                                                   OR

                                                                   AO22.3
                                                                   A site­specific geotechnical assessment is prepared by a
                                                                   registered professional engineer to certify that:
                                                                   (a)   the stability of the site, including associated buildings and
                                                                         infrastructure, will be maintained and operational for the life
                                                                         of the development;
                                                                   (b)   the site is not subject to the risk of landslide activity
                                                                         originating from other land, including land above the site;
                                                                         and
                                                                   (c)   development of the site will not increase the risk of
                                                                         landslide activity on other land;

                                                                   Editor's Note— PSP8 Natural Hazards provides further guidance
                                                                   on assessing landslide hazard.

                                                                   AO22.4
                                                                   Any specific measures identified in a site specific geotechnical
                                                                   assessment for stabilising the site or development are to be fully
                                                                   implemented.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 8 of 8

Section 62

9.3.2             Caretaker's Accommodation, Dwelling Unit and Rural Workers' Accommodation
                  Code

9.3.2.1           Application
This code applies to acceptable development subject to requirements and to assessable development identified as requiring
assessment against the Caretaker’s accommodation, Dwelling unit and Rural workers' accommodation code by the tables of
assessment in Part 5 (Tables of assessment).

9.3.2.2           Purpose and overall outcomes
(1)   The purpose of the Caretaker’s accommodation, dwelling unit and rural worker’s accommodation code is to ensure caretaker’s
      accommodation, dwelling units and rural worker’s accommodation achieve an acceptable level of comfort, safety and amenity for
      occupants and are compatible with non­residential uses on the same site or adjoining premises.
(2)   The overall outcomes sought for the Caretaker’s accommodation, dwelling unit and Rural workers' accommodation code are:
      (a)   Caretaker’s accommodation, dwelling units and rural workers' accommodation do not compromise the operation of the
            primary non­residential use of the site.
      (b)   Caretaker’s accommodation is used for genuine caretaking or property management purposes.
      (c)   Rural workers' accommodation is used for genuine employees of a rural activity.
      (d)   Caretaker’s accommodation, dwelling units and rural workers' accommodation remain ancillary to non­residential uses on
            the same site.
      (e)   An acceptable level of residential amenity and safety is provided for occupants of caretaker’s accommodation, dwelling
            units and rural workers' accommodation.
      (f)   Caretaker’s accommodation, dwelling units and rural workers' accommodation do not adversely impact on the amenity of
            the local area.
FOR ACCEPTED DEVELOPMENT
The requirements for Acceptable Development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with the acceptable solutions is considered to satisfy the requirements. If development complies with
some, but not all, acceptable outcomes, an application for Code Assessment will be necessary and the application will be
assessed against the relevant Performance Outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.


Table 9.3.2.3 ­ Criteria for assessment

Location          Table 9.3.2.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Location

PO1                                                           AO1.1
Development does not compromise the operation or viability of A dwelling unit does not occur within 100 metres of land within the
existing or planned non­residential uses.                     Low Impact Industry zone or the Medium Impact Industry zone.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 1 of 5

Section 63

Performance outcomes                                                      Acceptable Outcomes
PO2
Caretaker’s accommodation is used for bona fide caretaking or             No acceptable outcome provided.
property management purposes.
(a)   In the Rural zone, caretaker’s accommodation is:
      (i)     on a site with a minimum area of 20 hectares;
      (ii)    required because of the need to caretake a rural
              activity on site; and
      (iii)   located within 50 metres of the primary use of the
              site, for which the caretaker is responsible; and

(b)   In the Low Impact Industry zone or the Medium Impact
      Industry Zone, caretaker's accommodation:
      (i)     is directly associated with and subordinate to the
              industry activity on site;
      (ii)    demonstrates a demand for 24 hour care of
              buildings, operations, plant or equipment; and
      (iii)   is on a site with an area of at least 2,000m2 or is not
              located within 100 metres of any other caretaker's
              accommodation; and
      (iv)    is not separately let for other accommodation
              activities; and

(c)   In the Innovation Zone, caretaker's accommodation:
      (i)     is directly associated with and subordinate to the
              activity on site;
      (ii)    demonstrates a demand for 24 hour care of
              buildings, operations, plant or equipment; and
      (iii)   is not separately let for other accommodation
              activities.
Editor’s Note—Council would require sufficient justification that
the caretaker’s residence is required for the industry , rural or other
activity on the site.
PO3                                                                AO3
Rural workers' accommodation is located on rural properties of 20 Rural workers' accommodation is limited to land in the Rural zone
hectares or greater for bona fide employees of a rural use carried used for agricultural production.
out on site.


Effects of Use          Table 9.3.2.3 Criteria for assessment (part)
Performance outcomes                                                      Acceptable Outcomes
Effects of Use




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 2 of 5

Section 64

Performance outcomes                                              Acceptable Outcomes
PO4                                                               AO4.1
A caretaker’s accommodation, dwelling unit or rural workers'      Caretaker’s accommodation is occupied by a person or persons
accommodation is ancillary to non­residential activities on the   having responsibility for the security, maintenance or
same site.                                                        management of non­residential activities conducted on the same
                                                                  site.

                                                                  AO4.2
                                                                  No more than one caretaker’s accommodation is established on
                                                                  site provided that where the site is subject to a Building Unit Plan
                                                                  or Group Title Plan no more than one caretaker's accommodation
                                                                  is located on the original parent parcel.

                                                                  AO4.3
                                                                  Caretaker’s accommodation and rural workers' accommodation
                                                                   are not excised from the balance of the site (or would cease to be
                                                                  this use).

                                                                  AO4.4
                                                                  Caretaker’s accommodation does not occur on the same site as
                                                                  a dwelling unit.

                                                                  AO4.5
                                                                  In a zone other than the Rural Zone caretaker’s accommodation is
                                                                  adjoining and where practicable shares an interconnecting door
                                                                  with the non­residential use for which the caretaker is
                                                                  responsible.

                                                                  AO4.6
                                                                  Outside of an industrial zone neither a caretaker’s
                                                                  accommodation nor a dwelling unit has a gross floor area
                                                                  exceeding 90m².

                                                                  AO4.7
                                                                  No residential use in either the Low Impact Industry zone or the
                                                                  Medium Impact Industry zone has more than one bedroom or a
                                                                  gross floor area exceeding 65m².

                                                                  AO4.8
                                                                  Rural workers' accommodation has a combined total gross floor
                                                                  area not exceeding 250m² and accommodates no more than 10
                                                                  persons including employees and, if applicable, their immediate
                                                                  families.

                                                                  Editor’s Note— Rural worker’s accommodation would typically
                                                                  only be occupied on a seasonal basis. If the property owner
                                                                  sought to offer accommodation to people beyond bona fide farm
                                                                  workers approval for a separate use such as short term
                                                                  accommodation would be required.



Safety and Amenity            Table 9.3.2.3 Criteria for assessment (part)
Performance outcomes                                              Acceptable Outcomes
Safety and Amenity




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 3 of 5

Section 65

Performance outcomes                                                Acceptable Outcomes
PO5
Development does not place residents at risk of exposure to         No acceptable outcome provided
noise levels, air emissions or odour levels that would cause
unacceptable health risks


PO6                                                                 AO6.1
The design of the caretaker’s accommodation, dwelling unit or       The residence can be secured so that persons other than the
rural workers' accommodation achieves an acceptable level of        residents cannot gain direct access.
residential amenity for residents of the use, including security,
visual and acoustic privacy and access to private open space.       AO6.2
                                                                    Bedrooms and living rooms of the caretaker’s accommodation,
                                                                    dwelling unit or rural workers' accommodation do not adjoin, and
                                                                    face away from, noise generating activities conducted on the site
                                                                    or adjoining sites.

                                                                    AO6.3
                                                                    The caretaker’s accommodation or dwelling unit is provided with a
                                                                    patio, balcony, verandah, deck or garden with an area of not less
                                                                    than 15m² with a minimum horizontal dimension of at least 2.5
                                                                    metres.

                                                                    AO6.4
                                                                    Rural workers' accommodation is provided in a permanent
                                                                    habitable structure with, as a minimum:
                                                                    (a)   sleeping quarters;
                                                                    (b)   bathroom facilities;
                                                                    (c)   living rooms separate to sleeping quarters;
                                                                    (d)   running drinking water supply, plumbed effluent disposal
                                                                          and power supply.

                                                                    or

                                                                    AO6.5
                                                                    Where rural workers' accommodation takes the form of temporary
                                                                    or transportable accommodation:
                                                                    (a)   ablutions and waste disposal are provided on site; and
                                                                    (b)   employees stay no longer than six weeks.

                                                                    Editor’s Note — depending on the nature of accommodation and
                                                                    the number of people accommodated special requirements
                                                                    pursuant to the Building Act 1975 or the Workers' Accommodation
                                                                    Act 1952 may apply to rural workers' accommodation.

                                                                    AO6.6
                                                                    The residential use is setback at least 3 metres from any waste
                                                                    servicing area.

                                                                    AO6.7
                                                                    Caretaker’s accommodation and rural workers' accommodation
                                                                    is separated by at least 150 metres from:
                                                                    (a)   the Resource Area/ Processing Area and operational area
                                                                          of any Key Resource Area;
                                                                    (b)   any intensive animal industry;
                                                                    (c)   any high impact industry.


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 4 of 5

Section 66

Performance outcomes                                                Acceptable Outcomes

                                                                    AO6.8
                                                                    Private open space or outdoor living space is sited and orientated
                                                                    so that it is not directly overlooked by other buildings on the site or
                                                                    adjoining premises;

                                                                    or

                                                                    AO6.9
                                                                    Where direct overlooking from another building is unavoidable,
                                                                    any private living space is screened by a minimum 1.8 metre high
                                                                    solid screen fence or other effective screening devices.


PO7                                                                 AO7
Sufficient space is available to accommodate the likely parking     Parking on the site is required in addition to those spaces
demand of residents, exclusive of the car parking requirement for   required for other uses on the site, and is marked for the exclusive
the other uses on the site.                                         use of the residential use.

                                                                    Editor’s Note— the rate of car parking required for the use is
                                                                    specified in the Driveways and Parking Code.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 5 of 5

Section 67

9.3.3             Dual Occupancy and Multiple Dwelling Code

9.3.3.1           Application
This code applies to acceptable development which is subject to requirements and to assessable development identified as requiring
assessment against the Dual Occupancy and Multiple Dwelling code by the tables of assessment in Part 5 (Tables of assessment).

9.3.3.2           Purpose and overall outcomes
(1)   The purpose of the Dual Occupancy and Multiple Dwelling Code is to ensure dual occupancy and multiple dwellings are of a high
      quality design which appropriately respond to local character, environment and amenity considerations.
(2)   The overall outcomes sought for dual occupancies and multiple dwellings are as follows:
      (a)   Dual occupancies and multiple dwellings occur only on land that is suited to the development and occupation of residential
            buildings.
      (b)   Dual occupancies and multiple dwellings have attractive built form which addresses the street and integrates with
            surrounding development.
      (c)   Dual occupancies and multiple dwellings are consistent with the developed character of the particular neighbourhood and
            Local Plan area.
      (d)   Dual occupancies and multiple dwellings provide a high standard of privacy and amenity for residents.
      (e)   Dual occupancies and multiple dwellings incorporate building design that responds to Noosa Shire’s subtropical climate,
            taking advantage of natural climatic conditions.
      (f)   Dual occupancies and multiple dwellings are designed to provide for safe, secure and comfortable homes for people with
            different needs through all stages of life.
      (g)   Dual occupancies and multiple dwellings incorporate high quality landscapes and well designed and useable communal
            and private open space areas that provide visual relief to the built form.
FOR ACCEPTED DEVELOPMENT
The requirements for acceptable development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
with some, but not all, acceptable outcomes, an application for Code Assessment will be necessary and the application will be
assessed against the relevant Performance Outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.

Table 9.3.3.3 ­ Criteria for assessment

Location          Table 9.3.3.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Location
PO1
Development is located within the urban boundaries on land with    No acceptable outcome provided
good access to a variety of essential services and facilities,
including retail, commercial, social and medical facilities and
public transport services.
PO2
A dual occupancy or multiple dwellings occur only on land that is No acceptable outcome provided
suited to the development and occupation of residential buildings
avoiding risk to people or property from natural disaster.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 1 of 4

Section 68

Performance outcomes                                                   Acceptable Outcomes
Short­term Accommodation
PO3                                                                    AO3
Short­term accommodation are located in environments where             Dual occupancy or multiple dwellings may be available for short­
they:                                                                  term accommodation provided they are not located adjoining or
(a)   provide a high level of comfort and amenity for occupants;       adjacent to a Major Centre Zone.

(b)   maintain amenity and privacy of neighbouring premises;
                                                                       Editor’s Note— Short­term accommodation must not constitute or
(c)   are compatible with the character and streetscape of the         be used as a party house as separately defined in Schedule 1 and
      local area; and                                                  addressed in part 1.8.
(d)   do not alienate land intended for higher density permanent
      living.


Effects of Use          Table 9.3.3.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes

Effects of Use
PO4
Development does not adversely impact on existing or future            No acceptable outcome provided
infrastructure including water or sewerage utilities, electricity or
transport infrastructure.


Safety and Amenity              Table 9.3.3.3 Criteria for assessment (part)
Performance outcomes                                         Acceptable Outcomes
Safety and Amenity
PO5                                                          AO5
Development addresses the street, contributes to the         Dual occupancy and multiple dwellings do not occur on battleaxe or rear
streetscape and does not adversely impact on the             allotments or lots with a frontage less than 10.5 metres in width.
amenity of any adjoining land on which residential
development is permitted.
PO6                                                          AO6
Development is designed to minimise noise carrying           Bedroom windows are at least 3 metres away from shared driveways, car
between dwelling units or accommodation units by             parking areas, mechanical plant, refuse and recycling areas, vents and
locating noise sensitive spaces such as bedrooms             exhausts.
away from noise generating areas of the development,
such as car parking areas or mechanical plant and
equipment or recreational facilities.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 2 of 4

Section 69

Performance outcomes                                      Acceptable Outcomes
PO7                                                   AO7.1
Where dwellings form part of a mixed use development, Clearly identifiable entry areas for the residents of, and visitors to, multiple
the development provides residents with reasonable    dwellings are provided separately from entrances for other site users and
privacy and security.                                 provide for safe entry from streets, car parking areas and servicing areas.

                                                          AO7.2
                                                          Clearly marked, safe and secure parking areas are provided for residents
                                                          and visitors which are separate from parking areas provided for other site
                                                          users.

                                                          AO7.3
                                                          Security measures are installed such that site users do not have access to
                                                          areas that are intended for the exclusive use of residents of, and visitors to,
                                                          dwellings.

                                                          AO7.4
                                                          Dwellings are designed to incorporate suitable noise attenuation and privacy
                                                          measures to reduce amenity impacts from business uses.

                                                          AO7.5
                                                          Windows, balconies and terraces of each dwelling are screened where
                                                          overlooking a habitable room or private open space
                                                          of another dwelling within 9 metres.

PO8                                                       AO8
Buildings and outdoor spaces are designed to allow        Development of the site enhances:
for natural surveillance without adversely impacting      (a)    opportunities for passive surveillance of communal spaces including
the privacy of on­site or adjoining residents.                   providing well­lit, active and overlooked places and routes;
                                                          (b)    legibility of the site and ease of navigation;
                                                          (c)    clear distinction between public and private spaces;
                                                          (d)    ease of maintenance

                                                          Editor’s Note—development should comply with the principles of Crime
                                                          Prevention through Environmental Design ­ Guidelines for Queensland
PO9                                                       AO9.1
Development, including entrance ways and outdoor          The main entrance is clearly identifiable and visible from the street, footpath,
spaces, are designed to protect the personal security     visitor car parking areas and driveway.
and safety of residents as well as legitimate site
visitors.                                                 AO9.2
                                                          The internal path network has clear sightlines to the main entry and street
                                                          access points.

                                                          AO9.3
                                                          Visitors have direct access to the main entrance without passing through
                                                          private outdoor living areas.

PO10                                               AO10
Multiple dwellings can be accommodated and visited One in three multiple dwelling units:
by a wide cross section of the community including (a)   is accessible by a safe, continuous and step free path of travel from
people with limited mobility.                            the street entrance of the property or from a car parking space;
                                                          (b)    has a step­free entrance door with opening width of at least 820
                                                                 millimetres; and
                                                          (c)    contains a bathroom on the entry level.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 3 of 4

Section 70

Performance outcomes                                     Acceptable Outcomes

Landscaping & private open space
PO11                                                    AO11.1
Development:                                            Landscaping is provided to a minimum of 40% of the site area and 60% of
(a)   enhances liveability and promotes outdoor living; this is soft landscaping; or
(b)   contributes to the visual amenity and natural
                                                         AO11.2
      landscape character of the area;
                                                         If for small dwellings or for development which provides a ratio of at least
(c)   retains existing large trees where practicable;    three small dwellings to one other dwelling, landscaping is provided to a
(d)   provides privacy between uses;                     minimum of 35% of the site area and 60% of this is soft landscaping.

(e)   reduces the bulk and scale of development; and
(f)   conceals services, car parking and manoeuvring
      areas.

PO12                                                     AO12.1
Private open space:                                      Private open space is provided for each dwelling at the following rate:
(a)   is provided to all dwellings and is adequate in    (a)   at ground level—a minimum of 25m² directly accessed from living
      size, shape and dimensions to suit the needs of          spaces; or
      the occupants;                                     (b)   if above ground level—12m² with a minimum width of 2.5 metres
(b)   receives adequate sunlight; and                          accessed directly from the living spaces; or
(c)   is designed and orientated to ensure privacy is
      maintained between uses.                           AO12.2
                                                         Private open space is provided for each small dwelling at the following rate:
                                                         (a)   at ground level—a minimum of 20m² directly accessed from living
                                                               spaces and exclusive of clothes drying area; or
                                                         (b)   if above ground level—9m² with a minimum width of 2.5 metres
                                                               accessed directly from the living spaces.

                                                         AO12.3
                                                         Private open space contributing to the above calculations has a maximum
                                                         gradient of 10% (1 in 10) and is clear of any utilities such as gas, water tanks
                                                         and air conditioning units.
PO13                                                     AO13.1
Safe vehicular access is provided to and from the site   Development does not gain direct access from any road with a legal speed
without adversely impacting on the safety of the road    limit of 80 kilometres per hour or above.
network.
                                                         AO13.2
                                                         Where located on any road of a higher order than local road or where
                                                         accommodating three or more households, vehicle manoeuvring areas are
                                                         provided on site such that vehicles enter and leave the site in a forward gear.
PO14                                                     AO14
Sufficient on­site car parking is provided to            Car parking is provided in accordance with Table 9.4.1.4 in the Driveways
accommodate the number and type of vehicles likely to    and Parking Code
be generated by the residential use without impacting
on the safety or amenity of the adjoining streets.
PO15
Underground car parking areas are designed to drain      No acceptable outcome provided
and function safely during a flood event and power
failure.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 4 of 4

Section 71

9.3.4             Special Residential Code

9.3.4.1           Application
This code applies to acceptable development which is subject to requirements and to assessable development identified as
requiring assessment against the Special Residential code by the tables of assessment in Part 5 (Tables of assessment).

9.3.4.2           Purpose and overall outcomes
(1)   The purpose of the Special Residential code is to ensure relocatable home parks, residential care facilities, retirement
      facilities and rooming accommodation:
      (a)   are appropriately located and integrated with the surrounding community;
      (b)   are designed in a manner which meets the needs of and provides a comfortable, adaptable and safe environment for
            residents; and
      (c)   protect the amenity of surrounding premises.
(2)   The overall outcomes sought for relocatable home parks, residential care facilities, retirement facilities and rooming
      accommodation are as follows:
      (a)   Development for alternative housing types provide housing diversity and enables people to find suitable
            accommodation throughout their life cycle.
      (b)   The residential use provides a home­like environment that promotes individuality, sense of belonging and
            independence.
      (c)   The residential use is located within the urban boundaries.
      (d)   The residential use is designed to be integrated with the surrounding community and provides the opportunity for
            residents to participate in the wider community.
      (e)   The residential use is sited such that there is ease of movement, safety and legibility for residents and visitors.
      (f)   The residential use provides for residents to have easy and direct access to public transport and community services
            and facilities.
      (g)   A safe, secure and comfortable living environment is provided for residents.
      (h)   The comfort, safety, security, privacy and wellbeing of adjoining residents is protected.
      (i)   The residential use provides site and adjoining residents with protection from environmental nuisances.
      (j)   The residential use is provided with appropriate connection to reticulated sewerage, water supply, stormwater
            drainage, electricity, and telecommunications services.
FOR ACCEPTED DEVELOPMENT
The requirements for accepted development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
with some, but not all, acceptable outcomes, an application for Code assessment will be necessary and the application will be
assessed against the relevant Performance outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.

Table 9.3.4.3 ­ Criteria for assessment

Location          Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes                                                Acceptable Outcomes

All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 1 of 8

Section 72

Performance outcomes                                                Acceptable Outcomes
Location
PO1                                                                 AO1.1
Development has reasonable access to a variety of essential         Development is located within the urban boundary.
services and facilities, including retail, commercial, social and
medical facilities and public transport services.                   AO1.2
                                                                    Development is located in one of the following:
                                                                    (a)   Community facilities zone;
                                                                    (b)   Medium density residential zone; or
                                                                    (c)   High density residential zone.

                                                                    AO1.3
                                                                    For Relocatable home parks, retirement facilities and rooming
                                                                    accommodation:
                                                                    (a)   the use is located within 400 metres (measured along a
                                                                          sealed footpath with grade of no more than 5%) of a public
                                                                          transport stop; or
                                                                    (b)   where no public transport is available, an alternative means
                                                                          of transport, such as a minibus, is made available to the
                                                                          residents.

                                                                    AO1.4
                                                                    Where a health care service is not located within 400 metres,
                                                                    medical or therapy services for residents may form part of the use
                                                                    and be provided on site providing the total proportion of gross floor
                                                                    area used for health care services does not exceed 10%.
PO2                                                                 AO2
Rooming accommodation is located on a site with convenient          Rooming accommodation is located within:
access to employment or education.                                  (a)   1,500 metres walking distance, via a sealed pathway, of
                                                                          land within the Major centre zone or District centre zone or
                                                                          800 metres of land within the Neighbourhood centre zone;
                                                                          or
                                                                    (b)   800 metres walking distance, via a sealed pathway of a
                                                                          dedicated public pedestrian access point of a hospital or
                                                                          tertiary education establishment; or
                                                                    (c)   400 metres walking distance, via a sealed pathway, of a
                                                                          Translink bus stop.

PO3
Residential uses occur only on land that is suited to the           No acceptable outcome provided
development and occupation of residential buildings without risk
to people and property from natural disaster.
PO4                                                                 AO4
Development is located so as to avoid conflicts with surrounding    Development does not occur within:
land uses.                                                          (a)   150 metres of land within the Low impact industry zone;
                                                                    (b)   200 metres of land within the Medium impact industry zone;
                                                                    (c)   the designated separation area of a Key resource activity; or
                                                                    (d)   250 metres of an existing intensive animal industry,
                                                                          intensive horticulture use or a rural industry.

                                                                    Editor’s Note—Key resource areas and separation areas are
                                                                    shown on the Regional Infrastructure Overlay Maps contained in
                                                                    schedule 2.


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 2 of 8

Section 73

Performance outcomes                                                   Acceptable Outcomes

PO5
Development is located on a site with sufficient area to               No acceptable outcome provided
accommodate:
(a)   buildings and structures including accommodation and
      support facilities;
(b)   setbacks;
(c)   vehicle access, parking, manoeuvring and circulation;
(d)   pedestrian access; and
(e)   landscaped open space.


Effects of Use          Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes

All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation
Effects of Use
PO6
Development has a residential density that is compatible with the      No acceptable outcome provided
intent of the zone and the preferred character for the local area in
which it is located.
PO7
The residential use integrates with the broader neighbourhood          No acceptable outcome provided
and allows residents to interact with the wider community in the
vicinity.
PO8
Development does not adversely impact on existing or future            No acceptable outcome provided
infrastructure including water or sewerage utilities, electricity or
transport infrastructure.


Design and siting            Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes                                                   Acceptable Outcomes
All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation
Design and siting
PO9
The residential use is appropriately sited and designed in a           No acceptable outcome provided
manner which:
(a)   integrates with the natural landform and landscape of the
      site;
(b)   is compatible with the developed character of its particular
      neighbourhood;
(c)   maximises the retention of existing vegetation and allows
      for spaces and landscapes between buildings;
(d)   allows sufficient area at ground level for private and
      communal open space, site facilities, resident and visitor
      parking and landscaping;
(e)   facilitates ease of resident access around the development
      such that all communal buildings and recreational facilities
      are conveniently located.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                           Page 3 of 8

Section 74

Safety and Amenity             Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes                                                    Acceptable Outcomes

All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation
Safety and Amenity
PO10                                                                    AO10
The use does not have a significant adverse impact on the               Development ensures that where chemical, laundry or cooking
amenity enjoyed by users of adjoining or nearby premises.               odour is released, exhaust vents are discharged vertically and
                                                                        directed away from adjoining sensitive land uses.
PO11
Safety, security and comfort of residents, staff, visitors and          No acceptable outcome provided
neighbours i s considered and incorporated into the design of the
facility.
PO12                                                                    AO12
Development is designed to minimise noise carrying between              Bedroom windows are at least 3 metres away from shared
dwelling units or accommodation units by locating noise sensitive       driveways, car parking areas, mechanical plant, refuse and
spaces such as bedrooms away from noise generating areas of             recycling areas, vents and exhausts.
the development, such as car parking areas or mechanical plant
and equipment or recreational facilities.
PO13                                                                    AO13
Development provides for the accommodation needs of users of            With the exception of a relocatable home park, residential uses
all ages and abilities at various stages of their lives, allowing for   that cater for independent living are accessible or able to be made
an optimum degree of independence for people with disabilities,         accessible for people with physical disabilities through:
seniors, or people requiring assisted living.                           (a)   providing an accessible path of travel from the footpath or
                                                                              car parking area to the front entry of the residential building;
                                                                        (b)   incorporating the kitchen, living/dining area, at least one
                                                                              bedroom, a bathroom, and the laundry on the ground floor if
                                                                              the residential building spans two or more storeys in
                                                                              height;
                                                                        (c)   providing 1.2 metre wide passageway and doorways of at
                                                                              least 920 millimetres wide and level entry thresholds to all
                                                                              accessible rooms on the ground floor;
                                                                        (d)   ensuring ground floor kitchen and bathroom facilities are
                                                                              accessible or have sufficient physical dimensions to allow
                                                                              for wheelchair access.

                                                                        Editor’s Note—Compliance with this acceptable outcome can be
                                                                        achieved by meeting the planning and design standards and key
                                                                        design elements of PDA guideline no. 02 Accessible housing
                                                                        published by the Queensland Department of Infrastructure, Local
                                                                        Government and Planning May 2015
PO14                                                                    AO14
Buildings and outdoor spaces are designed to allow for natural          Development of the site enhances:
surveillance without adversely impacting the privacy of on­site or      (a)   opportunities for passive surveillance of common spaces
adjoining residents.                                                          including providing well­lit, active and overlooked places
                                                                              and routes;
                                                                        (b)   legibility of the site and ease of navigation;
                                                                        (c)   clear distinction between public and private spaces;
                                                                        (d)   ease of maintenance.

                                                                        Editor’s Note—development should comply with the principles of
                                                                        Crime Prevention through Environmental Design ­ Guidelines for
                                                                        Queensland


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                    Page 4 of 8

Section 75

Performance outcomes                                                Acceptable Outcomes
PO15                                                                AO15.1
Development, including entrance ways and outdoor spaces are         The main entrance is clearly identifiable and visible from the
designed to protect the personal security and safety of residents   street, footpath, visitor car parking areas and driveway.
as well as legitimate site visitors.
                                                                    AO15.2
                                                                    The internal path network has clear sightlines to the main entry
                                                                    and street access points.

                                                                    AO15.3
                                                                    Visitors have direct access to the main entrance without passing
                                                                    through private outdoor living areas.
PO16                                                                AO16.1
Building and access works are located, designed and sited to        The residential use has access to a reliable alternative power
protect persons (including residents with limited mobility) and     supply in the event of prolonged power outage or disconnection
property in the event of a natural disaster, emergency or power     from grid supplied electricity.
failure.
                                                                    AO16.2
                                                                    The residential use is designed, constructed and operated so as
                                                                    to allow residents and staff including mobility impaired persons to
                                                                    take shelter on site from severe weather events or floods.

                                                                    AO16.3
                                                                    At a minimum,Residential Care facilities, Retirement facilities and
                                                                    Rooming accommodation provide:
                                                                    (a)   an early warning system;
                                                                    (b)   emergency lighting;
                                                                    (c)   safe and secure paths of travel to exits;
                                                                    (d)   emergency escape exits;
                                                                    (e)   protected exit paths;
                                                                    (f)   exit signage;
                                                                    (g)   portable fire extinguishers;
                                                                    (h)   fire hose reels;
                                                                    (i)   fire­fighting water supply;
                                                                    (j)   smoke hazard management;
                                                                    (k)   sprinkler systems.

PO17                                                            AO17
Development provides acceptable standards of health, safety and Residential care facilities, Retirement facilities and Rooming
amenity for residents.                                          accommodation provide:
                                                                    (a)   hygienic and adequately sized and configured kitchen,
                                                                          dining, sanitary and laundry facilities;
                                                                    (b)   adequately sized common areas and bedrooms;
                                                                    (c)   storage facilities; and
                                                                    (d)   adequate ventilation to habitable rooms.

                                                                    Editor’s Note—Compliance with this acceptable outcome can be
                                                                    achieved by satisfying the requirements of MP 5.7 ­ Residential
                                                                    Services Building Standard of the Queensland Development
                                                                    Code.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 5 of 8

Section 76

Performance outcomes                                                Acceptable Outcomes

Landscaping & private open space
PO18                                                              AO18.1
Development:                                                      Landscaping is provided to a minimum of 40% of the site area
(a)   enhances liveability and promotes outdoor living and social and 60% of this is soft landscaping; or
      interaction;
                                                                  AO18.2
(b)   contributes to the visual amenity and natural landscape
                                                                  If for small dwellings or for development which provides a ratio of
      character of the area;
                                                                  at least three small dwellings to one other dwelling, landscaping
(c)   retains existing large trees where practicable;             is provided to a minimum of 35% of the site area and 60% of this
(d)   provides privacy between uses;                              is soft landscaping.

(e)   reduces the bulk and scale of development; and
(f)   conceals services, car parking and manoeuvring areas.

PO19                                                                AO19.1
Private open space:                                                 Private open space is provided for each dwelling at the following
(a)   is provided to all dwellings and is adequate in size, shape   rate:
      and dimensions to suit the passive and active recreation      (a)   at ground level—a minimum of 25m² directly accessed
      needs of the occupants;                                             from living spaces; or
(b)   receives adequate sunlight; and                               (b)   if above ground level—12m² accessed directly from the
(c)   is designed and orientated to ensure privacy is maintained          living spaces; or
      between uses.
                                                                    AO19.2
                                                                    Private open space is provided for each small dwelling at the
                                                                    following rate:
                                                                    (a)   at ground level—a minimum of 20m² directly accessed
                                                                          from living spaces; or
                                                                    (b)   if above ground level—10m² with a minimum width of 2
                                                                          metres accessed directly from the living spaces; or

                                                                    AO19.3
                                                                    A minimum of 30m2 of private open space is provided per
                                                                    relocatable home.

                                                                    AO19.4
                                                                    Private open space contributing to the above calculations has a
                                                                    maximum gradient of 10% (1 in 10) and is clear of any utilities
                                                                    such as gas, water tanks, clothes drying areas and air
                                                                    conditioning units.
PO20                                                                AO20.1
Safe vehicular access is provided to and from the site without      The residential use does not gain direct access from any part of
adversely impacting on the safety of the road network.              the major road network which has a legal speed limit of 90
                                                                    kilometres per hour or above.

                                                                    AO20.2
                                                                    Vehicle manoeuvring areas are provided on site such that
                                                                    vehicles enter and leave the site in a forward gear.
PO21                                                                AO21
Site design and layout ensures emergency services personnel         Efficient and safe access and egress for emergency vehicles i s
and vehicles have access to the premises at all time.               provided.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 6 of 8

Section 77

Performance outcomes                                                    Acceptable Outcomes

PO22
Sufficient on­site car parking is provided to accommodate the           No acceptable outcome provided
number and type of vehicles likely to be generated by the
residential use having regard to the number of dwellings,               Editor’s Note— detailed parking requirements including the rate
residents, visitors or staff (including changeover of shift workers).   of vehicle parking are addressed in the Driveway and Parking
                                                                        Code.


Relocatable home park                Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes                                                    Acceptable Outcomes

All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation
Relocatable home park
PO23                                                           AO23.1
Relocatable home parks provide housing for permanent residents The relocatable home park accommodates only manufactured
in relocatable homes.                                          homes designed with the capacity to be moved from one position
                                                               to another.

                                                                        Editor’s Note— it would be expected that relocated or
                                                                        manufactured homes are fixed or secured to the site (i.e.not on
                                                                        wheels) but not in a manner that prevents future relocation. They
                                                                        would require a development approval for building works.

                                                                        AO23.2
                                                                        The relocatable home park is occupied by permanent residents
                                                                        for whom the premise is their principal place of residence.
PO24                                                                    AO24.1
Each relocatable home has the character of a small detached             The relocatable home park does not include caravans,
dwelling house.                                                         recreational vehicles or tents.

                                                                        AO24.2
                                                                        No single relocatable home exceeds a gross floor area of 120m2.

                                                                        AO24.3
                                                                        Each relocatable home is separated by a distance of at least 2
                                                                        metres from any other relocatable home (measured from external
                                                                        walls or balconies).


Residential Care Facilities and Retirement Facilities                         Table 9.3.4.3 Criteria for assessment (part)
Performance outcomes                                                    Acceptable Outcomes

All Relocatable home parks, Residential care facilities, Retirement facilities and Rooming accommodation
Residential Care Facilities and Retirement Facilities
PO25
Residential care facilities provide appropriate management,             No acceptable outcome provided
supervised care and social and recreational facilities to support
and meet the needs of residents of the facility.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 7 of 8

Section 78

Performance outcomes                                                  Acceptable Outcomes
PO26                                                               AO26
The facility meets the needs of anticipated users, and is designed A range of easily accessible accommodation designs are
to allow ‘aging in place’ to occur.                                provided in the development to cater for different individual and
                                                                   household needs.

                                                                      Editor’s Note— Compliance with Platinum performance level of
                                                                      the Liveable Housing Design Guidelines 4th Edition (published by
                                                                      Liveable Housing Australia in 2017) would meet this Acceptable
                                                                      Outcome.
PO27                                                                  AO27
For independent living, dwellings are of a small size to              The gross floor area of any dwelling does not exceed
accommodate the needs of the residents only.                          100m² provided that the average gross floor area for all
                                                                      independent living units does not exceed 90m².
PO28                                                                  AO28.1
Residents have good access to on­site communal and social             Development includes social facilities, including recreational
facilities which are located to maximise opportunities for            space and communal buildings.
interaction with and observation of the local community.
                                                                      AO28.2
                                                                      Development provides communal buildings and facilities that are
                                                                      easily accessible.

                                                                      AO28.3
                                                                      Residents are able to easily navigate the site on foot, bicycle,
                                                                      wheelchair, mobility scooter or with the assistance of mobility
                                                                      aids.

                                                                      Editor’s Note— compliance with this outcome will be achieved if
                                                                      internal pathways meet AS1428.1 Design for Access and Mobility

                                                                      AO28.4
                                                                      Communal facilities and open space components of the
                                                                      development are sited to enable interfacing with surrounding
                                                                      public realm areas (such as streets and parks).
PO29                                                           AO29.1
Development provides pedestrian movement areas within the site Development provides an internal sealed pathway network which
with:                                                          links to existing external pathways.
(a)   comfortable vantage points to rest, socialise and observe
      surrounding activities; and                                     AO29.2
                                                                      Development provides a variety of places to rest at intervals along
(b)   opportunities for interesting exercise routines and a variety
                                                                      internal walkways, including shaded seats and handrails.
      of circulation options.

PO30                                                                  AO30.1
The entrance to the office, reception area and guest lounge is        Access to the site by persons other than residents and employees
designed to be obvious and easily identifiable.                       is limited to a single public entry which may be controlled using
                                                                      gates or other security devices.

                                                                      AO30.2
                                                                      The entrance to office/reception and visitor areas are lit and
                                                                      signed.

                                                                      AO30.3
                                                                      Entrances/exits are located to provide a direct link to driveways
                                                                      and car parking areas.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 8 of 8

The text continues on section 79.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.