Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
9.3.8             Community Activities Code

9.3.8.1           Application
This code applies to acceptable development which is subject to requirements and to assessable development identified as
requiring assessment against the Community Activities code by the tables of assessment in Part 5 (Tables of assessment).

9.3.8.2           Purpose and Overall Outcomes
(1)   The purpose of the Community Activities code is to ensure community­related uses, activities and facilities:
      (a)   are provided in a coordinated and efficient way to meet the needs of existing and future communities; and
      (b)   are appropriately located and designed to provide an accessible and safe environment for users and protect the
            amenity of surrounding premises.
(2)   The overall outcomes sought for the Community Activities code are:
      (a)   Community activities are located in a zone and on a site suitable for the use with adequate supporting infrastructure,
            services, transport and road network connectivity.
      (b)   Community activities are located in proximity to its population catchment and operated in a manner that maximises
            community benefit.
      (c)   Where practicable, community activities are integrated and co­located with other community, recreation or business
            activities.
      (d)   Community activities are designed and sited in a manner that responds to the zone and the locality, streetscape
            characteristics and surrounding land uses.
      (e)   Community activities respect Noosa’s natural environmental values.
      (f)   Community activities manage potential negative impacts such as noise, privacy, lighting and hours of operation on adjacent
            residential land uses.
      (g)   Community activities are located and designed to provide a safe and secure environment accessible to a wide range of
            users.
FOR ACCEPTED DEVELOPMENT
The requirements for Accepted development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
with some, but not all, acceptable outcomes, an application for Code assessment will be necessary and the application will be
assessed against the relevant Performance outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.

Table 9.3.8.3 Criteria for Assessment

Location          Table 9.3.8.3 Criteria for assessment (part)
Performance outcomes                                                Acceptable Outcomes

Location
PO1
Community activities are located in a zone and on a site suitable   No acceptable outcome provided
for its intended purpose, is accessible to its patrons and
supported by adequate infrastructure and services.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 1 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.