Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                            Acceptable Outcomes

Installation of hydrant
PO1                                                             AO1.1
Fire hydrants are installed and located to enable QFES          Fire hydrant placement and technical requirements for
vehicles to access water safely, effectively and efficiently.   residential streets and common access ways within common
                                                                private title are in accordance with:
                                                                (a)   Australian Standard (AS) 2419.1 – 2005 Fire hydrant
                                                                      installations; and
                                                                (b)   QFES: Fire Hydrant and vehicle access guidelines for
                                                                      residential, commercial and industrial lots.


                                                                AO1.2
                                                                Fire hydrant placement and technical requirements for
                                                                commercial and industrial streets and access ways within
                                                                streets serving commercial properties, such as factories,
                                                                warehouses and offices, are in accordance with:
                                                                (a)   Australian Standard (AS) 2419.1 – 2005 Fire hydrant
                                                                      installations; and
                                                                (b)   QFES: Fire Hydrant and vehicle access guidelines for
                                                                      residential, commercial and industrial lots.


                                                                Editor’s Note— Design and technical requirements for
                                                                infrastructure from third party providers are to be in addition to,
                                                                and integrated where possible, into the overall design, built
                                                                form and landscaping requirements for the development.
Road technical standards
PO2                                                              No acceptable outcome provided.
Road widths and construction within the development are
adequate for QFES vehicles to gain access to a safe working area Editor’s Note—Roads should be designed and constructed in
close to buildings and near water supplies whether or not on­    accordance with Road Planning and Design manual­ 2nd edition.
street parking spaces are occupied.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 2 of 2
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.