Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                             Acceptable Outcomes
Energy efficiency
PO6                                                              AO6.1
Landscaping assists in passive solar access, the provision of    Landscape elements are positioned to shade walls, windows and
shade, microclimate management and energy conservation.          outdoor areas from afternoon (western) sun.

                                                                 AO6.2
                                                                 Landscapes facilitate winter sun access to living areas, north
                                                                 facing windows and public spaces.

                                                                 AO6.3
                                                                 Landscapes, fences and walls allow exposure of living and public
                                                                 areas to prevailing summer breezes and protection against winter
                                                                 winds.

                                                                 AO6.4
                                                                 Landscape elements do not shade solar collector devices during
                                                                 the middle 6 hours of the day.
Stormwater Drainage
PO7                                                              No acceptable outcome provided
Landscaping integrates stormwater drainage and water sensitive
urban design elements.

Natural Drainage
PO8                                                              AO8.1
Landscaping maintains or enhances the quality of surface         Landscaping works maintain and enhance natural drainage
water and groundwater.                                           lines (including creeks, gullies, waterways and wetlands) to
                                                                 convey stormwater

                                                                 AO8.2
                                                                 Riparian buffers are maintained and rehabilitated.

                                                                 AO8.3
                                                                 Within paved or sealed surfaces, tree grates provide for water
                                                                 and natural air movement however are not to be used as drain.
Bank stability
PO9                                                              AO9
Works or structures do not impact on erosion or bank             Structures and recreational facilities (including playgrounds,
stability.                                                       pergolas, barbeques etc.) are setback a minimum of 30
                                                                 metres from the top of the bank of any watercourse and 10
                                                                 metres from the top of the bank of any drainage line.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                         Page 6 of 10
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.