Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable Outcomes
Energy efficiency
PO6 AO6.1
Landscaping assists in passive solar access, the provision of Landscape elements are positioned to shade walls, windows and
shade, microclimate management and energy conservation. outdoor areas from afternoon (western) sun.
AO6.2
Landscapes facilitate winter sun access to living areas, north
facing windows and public spaces.
AO6.3
Landscapes, fences and walls allow exposure of living and public
areas to prevailing summer breezes and protection against winter
winds.
AO6.4
Landscape elements do not shade solar collector devices during
the middle 6 hours of the day.
Stormwater Drainage
PO7 No acceptable outcome provided
Landscaping integrates stormwater drainage and water sensitive
urban design elements.
Natural Drainage
PO8 AO8.1
Landscaping maintains or enhances the quality of surface Landscaping works maintain and enhance natural drainage
water and groundwater. lines (including creeks, gullies, waterways and wetlands) to
convey stormwater
AO8.2
Riparian buffers are maintained and rehabilitated.
AO8.3
Within paved or sealed surfaces, tree grates provide for water
and natural air movement however are not to be used as drain.
Bank stability
PO9 AO9
Works or structures do not impact on erosion or bank Structures and recreational facilities (including playgrounds,
stability. pergolas, barbeques etc.) are setback a minimum of 30
metres from the top of the bank of any watercourse and 10
metres from the top of the bank of any drainage line.
**FINAL DRAFT Post Consultation 2019**
Page 6 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.