Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn**FINAL DRAFT Post Consultation 2019**
Page 10 of 10
OT NOOSA The New Noosa Plan
TT @ | COUNCIL
4 i ‘ eae
ae Z rare s./, iy oe a me wi 5 1 1 1 4 11 1658 594 26 24 8 oo
5 1 1 1 4 12 1723 618 6 13 37 p
4 1 1 1 5 0 154 623 1594 80 -1
5 1 1 1 5 1 154 648 15 20 0 £
5 1 1 1 5 2 271 657 40 13 53 Ne
5 1 1 1 5 3 414 649 85 20 14 Bp,
5 1 1 1 5 4 857 646 45 22 43 ag
5 1 1 1 5 5 921 623 20 31 14 LS
5 1 1 1 5 6 1034 642 3 2 4 :
5 1 1 1 5 7 1111 648 7 12 28 ‘
5 1 1 1 5 8 1313 625 23 46 38 Zi
5 1 1 1 5 9 1556 660 9 10 60 *
5 1 1 1 5 10 1614 633 47 70 48 i
5 1 1 1 5 11 1697 634 51 32 30 ey
4 1 1 1 6 0 268 657 1492 36 -1
5 1 1 1 6 1 268 668 2 4 0 r
5 1 1 1 6 2 460 657 7 28 0 bY
5 1 1 1 6 3 509 673 3 4 26 7
5 1 1 1 6 4 877 670 15 16 38 a
5 1 1 1 6 5 1160 685 8 5 11 f
5 1 1 1 6 6 1323 669 21 19 0 s
5 1 1 1 6 7 1638 670 22 23 12 v4
5 1 1 1 6 8 1742 671 18 18 19 ae
4 1 1 1 7 0 168 677 1677 68 -1
5 1 1 1 7 1 168 695 34 25 54 “3
5 1 1 1 7 2 213 700 16 41 0 :
5 1 1 1 7 3 455 696 16 48 0 $
5 1 1 1 7 4 510 724 3 1 9 5
5 1 1 1 7 5 873 700 43 45 50 Ke.
5 1 1 1 7 6 1162 695 17 21 65 a
5 1 1 1 7 7 1310 683 27 62 72 4
5 1 1 1 7 8 1364 694 2 2 0 _
5 1 1 1 7 9 1396 728 49 15 0 s
5 1 1 1 7 10 1568 732 14 12 50 a
5 1 1 1 7 11 1593 677 40 58 0 B/
5 1 1 1 7 12 1767 699 3 2 73 4
5 1 1 1 7 13 1783 698 9 28 0 ¢
5 1 1 1 7 14 1799 714 13 26 0 i
5 1 1 1 7 15 1822 718 23 25 12
eee. Saas ‘ Wr Ke
“3% exe = Sey = i EY Aree
ey 1) Wy
ae A /| a ie f Cee silaé b : Sl
' LOW SIGNAGE INTEGRATED | FOOT- ! ROADWAY ' PLANTED | ROADWAY ' FOOT- 'LOWSIGNAGE INTEGRATED,
apnea ss 3. eee
WITHLANDSCAPING | PATH , ' MEDIAN | | PATH , WITHLANDSCAPING ,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.