Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance outcomes Acceptable outcomes
PO1
Development minimises energy consumption and the production No acceptable outcome provided
of greenhouse gas emissions.
Water efficiency and stormwater management Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Water efficiency and stormwater management
PO2 AO2.1
Development maximises water efficiency on site by incorporating If for accommodation activities, a minimum 3,000 litres of rain
rainwater collection and reuse measures for nonpotable water storage is provided per dwelling and reused for nonpotable
purposes such as irrigation. purposes and incorporated into a stormwater management plan
for the development.
AO2.2
With the exception of accommodation activities, rain water storage
sufficient for the intended use is captured and used onsite for
nonpotable purposes and incorporated into a stormwater
management plan for the development.
Editor’s note—The Queensland Development Code includes
provisions for the installation of rain water tanks and the reuse of
stormwater.
PO3 AO3.1
Development reduces stormwater runoff by minimising Development incorporates water sensitive urban design
impervious areas and maximising site vegetation to absorb water measures to manage stormwater.
on site.
AO3.2
Development incorporates porous pavements on low trafficked
areas such as footpaths and car parks.
Note: Porous pavements are not considered landscaping and do
not form part of the minimum landscape requirements.
PO4
Development limits changes and disturbances to the site No acceptable outcome provided
topography to preserve existing drainage channels as much as
possible.
Landscaping Table 9.4.6.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Landscaping
PO5
Development minimises hard surface areas that reflect or store No acceptable outcome provided
heat and maximises vegetation and soft landscaping.
PO6
Vegetation is incorporated into the building design to create No acceptable outcome provided
shade and cooling around buildings.
Design Table 9.4.6.3 Criteria for assessment (part)
**FINAL DRAFT Post Consultation 2019**
Page 2 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.