Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                Acceptable Outcomes
PO2                                                                 AO2.1
Stormwater drainage infrastructure is planned, designed and         Stormwater drainage planning, design and construction is in
constructed to:                                                     accordance with PSP6 Engineering Design Standards ­ Roads,
(a)   incorporate allowance for increased flood risk and tidal      drainage and earthworks and the latest version of the
      inundation through pipework as a result of cilmate change     Queensland Urban Drainage Design Manual.
      and sea level rise;
(b)   ensure the development is adequately drained; and             AO2.2
                                                                    The stormwater drainage system connects to a lawful point of
(c)   ensure stormwater is managed and lawfully discharged          discharge in accordance with PSP6 Engineering Design
      without altering stormwater drainage characteristics
      external to the site.                                         Standards ­ Roads, drainage and earthworks.

                                                                    AO2.3
                                                                    Stormwater flows discharging from the development are
                                                                    demonstrated to be consistent with pre­development
                                                                    characteristics.

                                                                    AO2.4
                                                                    Development provides for the management of stormwater to
                                                                    incorporate appropriate allowance for climate change impacts
                                                                    (including rainfall intensity and sea level rise), in accordance with
                                                                    PSP6 Engineering Design Standards – Roads, Drainage and
                                                                    Earthworks.


PO3                                                                 AO3.1
Stormwater drainage infrastructure conveys run­off in a manner      Stormwater drainage infrastructure meets the desired standards
that allows roads to deliver desired standards of service           of service for roads functionality set out in PSP6 Engineering
appropriate to the local conditions and local stormwater drainage   Design Standards ­ Roads, Drainage and Earthworks.
characteristics.
PO4                                                                 AO4.1
Stormwater infrastructure is compatible with existing               The location, design and construction of stormwater drainage
infrastructure, allows for easy access for the ongoing              structures is in accordance with PSP6 Engineering Design
maintenance by Council, is cost effective across its design life.   Standards ­ Roads, drainage and earthworks.

                                                                    AO4.2
                                                                    Where infrastructure is located on private land an easement is
                                                                    dedicated over the infrastructure in accordance with PSP6
                                                                    Engineering Design Standards ­ Roads, drainage and
                                                                    earthworks.

                                                                    AO4.3
                                                                    Any alterations or repairs to infrastructure as a result of the
                                                                    development are made at no cost to Council.

                                                                    AO4.4
                                                                    Development avoids stormwater inflow and infiltration to the
                                                                    sewer infrastructure network.

                                                                    AO4.5
                                                                    Stormwater infrastructure is designed to minimise maintenance
                                                                    costs and the requirement for specialized equipment for
                                                                    maintenance techniques.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                Page 2 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.