Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
Any lowerlevel platform, or siding, along the jetty walkway has a
maximum width of 500 millimetres and does not exceed 2m² and
does not interfere with the prolongation of boundaries as
indicated by Acceptable outcomes AO15.1, AO15.2 & AO15.3.
PO20
Pontoons and boat ramps are not constructed within the Noosa No acceptable outcome provided
Waters Estate waterways.
Boat lifting devices Table 9.4.9.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Boat lifting devices within Noosa Waters Estate waterways
**FINAL DRAFT Post Consultation 2019**
Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.