Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
9.4.10            Waste Management Code

9.4.10.1          Application
(1)   This code applies to assessable development identified as requiring assessment against the Waste management code by the
      tables of assessment in Part 5 (Tables of assessment).
(2)   All provisions in this code are assessment benchmarks for applicable assessable development.


9.4.10.2          Purpose and Overall Outcomes
(1)   The purpose of the Waste management code is to ensure development provides for the sustainable management of waste
      in a manner which is environmentally acceptable, safe and efficient.
(2)   The overall outcomes sought for the Waste management code are:
      (a)   Development provides opportunities to minimise waste generation and increase re­use and recycling.
      (b)   The storage, disposal and management of solid, liquid and vegetative waste is conducted in a safe and ecologically
            sustainable manner without environmental nuisance.
      (c)   The on­site storage of waste does not create environmental nuisance or adverse visual impact to adjoining properties
            during the construction or operational phase of development.
      (d)   Council and other licensed trade waste services are able to conveniently collect and dispose of waste generated by
            the development.
      (e)   The removal of waste generated by the demolition or removal of a building is undertaken safely and without impacts
            on infrastructure or the local environment and the site is left in a clean and usable condition.

Table 9.4.10.3 ­ Criteria for assessable development

Waste Separation             Table 9.4.10.3 ­ Criteria for assessable development (part)
Performance outcomes                                               Acceptable Outcomes
Assessable development
Waste Separation
PO1                                                                AO1.1
Development that generates several classes of waste is             Construction, operational and demolition works are planned and
designed so waste is collected, stored and disposed of in a safe   managed in accordance with Planning Scheme Policy PSP9
and ecologically sustainable manner.                               Waste management.

                                                                   Editor’s Note— PSP9 Waste Management requires Waste
                                                                   Management Plans to be prepared as part of certain types of
                                                                   development applications to ensure proper consideration is given
                                                                   to waste minimisation, segregation and reuse.

                                                                   AO1.2
                                                                   Adequate area is provided on­site for the collection and separate
                                                                   storage of recyclable, non­recyclable, vegetative and hazardous
                                                                   materials in their specific waste streams during construction or
                                                                   demolition works and the operational phase of development.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 1 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.