Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                Acceptable Outcomes
PO5
Waste storage areas provide a safe and secure environment for       No acceptable outcome provided
users through:
(a)   appropriate siting and access;
(b)   the provision of lighting; and
(c)   restricting access to the general public by making the area
      clearly identifiable as private space.

Editor’s note— The use of landscaping, a change of paving
material or fencing are examples of delineating a waste storage
area. The locking of the area is not preferred and should be
avoided.




Water management               Table 9.4.10.3 ­ Criteria for assessable development (part)
Performance outcomes                                                Acceptable Outcomes
Assessable development
Water management
PO6                                                                 AO6
Waste storage areas are designed to contain and appropriately       The waste storage area is constructed of impermeable and
dispose of leakage from bins and wastewater from bin washing.       durable surfaces and:
                                                                    (a)   is bunded and graded so that washwater and bin leakage
                                                                          are drained to the sewer or an on­site effluent disposal
                                                                          system via a gully within the storage area;
                                                                    (b)   has a bund wall with a maximum height of 100 millimetres;
                                                                    (c)   is serviced by a conveniently located hosecock and
                                                                          backflow prevention device, and connected to a water
                                                                          supply; and
                                                                    (d)   is roofed or otherwise covered if the storage area is—
                                                                          (i)     more than 1m²; or
                                                                          (ii)    storing wet waste; or
                                                                          (iii)   storing other waste with a high potential to cause
                                                                                  pollution if washed or leaked from the bins, including
                                                                                  waste oil or putrescibles.




Safety and protection of infrastructure when demolishing or removing buildings                                      Table 9.4.10.3 ­
Criteria for assessable development (part)
Performance outcomes                                                Acceptable Outcomes

Assessable development


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 3 of 4
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.