Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPerformance Outcomes Acceptable Outcomes
PO22
In the Rural Zone, one lot may be divided into two lots less than No acceptable outcome provided
100 hectares in area where there is a compliance with the South
East Queensland Regional Plan and each resultant lot is relatively
free of physical constraints such that it can accommodate a
dwelling house, effluent disposal, vehicular access and other
improvements and land uses that are consistent with the purpose
of the Rural Zone.
Volumetric Subdivisions Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Volumetric Subdivisions
PO23
Development provides that the subdivision of space above or No acceptable outcome provided
below the surface of land facilitates efficient development in a
manner that is consistent with the overall outcomes for the zone
and Local plan area in which the site is located.
Stormwater Management Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Stormwater Management
PO24
Development provides for the effective drainage of lots and roads No acceptable outcome provided
in a manner that:
(a) maintains the natural flow regime; Editor’s Note— Requirements for the design and construction of
stormwater management infrastructure are addressed in Part
(b) effectively manages stormwater quality and quantity; and
9.4.9 Water Quality and Drainage code
(c) ensures no adverse impacts on receiving waters and
surrounding land.
Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Conflicting land uses
PO25
New lots for residential development do not adjoin land located in No acceptable outcome provided
the Medium impact industry zone or the Low impact industry zone.
Rearrangement of Lot Boundaries Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Rearrangement of Lot Boundaries
**FINAL DRAFT Post Consultation 2019**
Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.