Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                                    Column 2
Activity group                              Uses

Outermost projection                        outermost projection, of a building or structure, means the outermost part of the building or
                                            structure, other than a part that is—
                                            (a)    retractable blind; or
                                            (b)    a fixed screen; or
                                            (c)    a rainwater fitting; or
                                            (d)    an ornamental attachment.

Plan of development                         plan of development means a plan that forms part of a development approval that regulates
                                            the type or forms of development on a site and is included in Table SC1.2.3 Plans of
                                            development.

Planning assumptions                        planning assumptions means an assumption about the type, scale, location and timing of
                                            future growth in the local government area.

Plot ratio                                  plot ratio means the ratio of the gross floor area of a building on a site to the area of the site.

Predominant slope                           predominant slope is the slope of a house site area, building footprint or use area
                                            measured perpendicular to the contours of the area and calculated as follows:
                                            Predominant slope (%) = (x / y) x 100
                                            where:
                                            ‘x’ is the vertical distance in metres between the highest point and the lowest point of the
                                            area; and
                                            ‘y’ is the horizontal distance in metres measured in a straight line between the highest point
                                            and the lowest point of the area.
                                            Where the area has more than one predominant slope, eg. a knoll or a gully, the average of
                                            the predominant slopes shall apply.

Prescribed tidal work                       prescribed tidal work ­ tidal work (operational work undertaken in tidal waters) which is
                                            completely or partly within a local government tidal area

Private open space                          private open space means outdoor areas of the premises set aside for the exclusive use of
                                            occupants of a dwelling or accommodation unit that are accessed directly from living areas.
                                            The term includes courtyards, decks, terraces, balconies, and verandas and hard and soft
                                            landscaping.

Probable maximum flood (PMF)                probable maximum flood (PMF) means the largest flood that could reasonably occur at a
                                            particular location, resulting from the probable maximum precipitation. The probable
                                            maximum flood defines the extent of flood­prone land. Generally, it is not physically or
                                            financially possible to provide general protection against this event.

PMF                                         PMF ­ probable maximum flood means the largest flood that could reasonably occur at a
                                            particular location, resulting from the probable maximum precipitation. The probable
                                            maximum flood defines the extent of flood­prone land. Generally, it is not physically or
                                            financially possible to provide general protection against this event.

Probable maximum storm tide (PMST)          probable maximum storm tide (PMST) means the maximum storm tide level that may be
                                            expected from the combination of meteorological and hydrological conditions that are
                                            reasonably possible in a particular locality, including the predicted impacts of climate
                                            change.

PMST                                        PMST ­ probable maximum storm tide means the maximum storm tide level that may be
                                            expected from the combination of meteorological and hydrological conditions that are
                                            reasonably possible in a particular locality, including the predicted impacts of climate
                                            change.

Projection area                             projection area means a part of the local government area for which the local
                                            government has carried out demand growth projection.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                   Page 35 of 42
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.