Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                           Column 2                           Column 3           Column 4
Map reference                      Trunk infrastructure               Estimated timing   Establishment cost5
301962                             Cooroy, Tewantin Road near         2016-2017          $54,412
                                   Olivine Street (Eastbound)
                                   Type R1 Shelter, Slab, Tactile
                                   Ground Surface Indicators,
                                   Pathway connection, retaining
                                   wall
301963                             Cooroy, Tewantin Road near       2016-2017            $54,412
                                   Miva Street (Westbound)
                                   Type R1 Shelter, Slab, Tactile
                                   Ground Surface Indicators, Kerb,
                                   Pathway connection
302109                             Noosa Heads, Cooyar Street       2016-2017            $94,174
                                   near Elanora Terrace
                                   Type C4 Shelter, Slab, Tactile
                                   Ground Surface Indicators, Kerb,
                                   Pathway connection, Adjustment
                                   of services, revegetation of
                                   existing site.
302110                             Noosa Heads, Leslie Drive /        2018-2019          $19,588
                                   Noosa Springs Drive
                                   Concrete Boarding point, Seat,
                                   Pathway, Kerb and Tactile
                                   Ground Surface Indicators
302111                             Noosa Heads, Leslie Drive /        2018-2019          $48,968
                                   Weyba Park Crescent
                                   Type C1-H shelter, Kerb, Tactile
                                   Ground Surface Indicators, slab
                                   and pathway connections
302112                             Noosa Heads, Leslie Drive /        2018-2019          $48,968
                                   Paul Street
                                   Type C1-H shelter, Kerb, Tactile
                                   Ground Surface Indicators, slab
                                   and pathway connections
302113                             Noosa Heads, Leslie Drive /        2018-2019          $19,588
                                   Noosa Springs Drive
                                   Concrete Boarding point, Seat,
                                   Pathway, Kerb and Tactile
                                   Ground Surface Indicators
302118                             Noosaville, Goodchap St / Juron    2018-2019          $53,865
                                   Street
                                   Type C1-H shelter, Tactile
                                   Ground Surface Indicators, slab
                                   and pathway connections
302119                             Noosaville, Goodchap St/           2021-2026          $58,762
                                   Heritage Drive
                                   Type C1-H shelter, pavement
                                   widening, Kerb, Tactile Ground
                                   Surface Indicators, slab and
                                   pathway connections




 **FINAL DRAFT - Post Consultation 2019**
                                                                                                          Page 21 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.