Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                              Acceptable outcomes
PO1                                                               AO1.1
Development:                                                      The disturbance of ASS is avoided by:
(a)     does not disturb ASS; or                                  (a)   undertaking an ASS investigation and soil analysis
(b)     is managed to avoid or minimise the release of acid and         according to the National Acid Sulfate Soils Guidance;
        metal contaminants, where disturbance of ASS is           (b)   not excavating or otherwise removing soil or sediment
        unavoidable.                                                    containing ASS;
                                                                  (c)   not permanently or temporarily extracting groundwater that
                                                                        results in the aeration of previously saturated ASS; and
                                                                  (d)   not undertaking filling on land at or below 5 metres AHD
                                                                        that results in:­
                                                                        (i)    actual ASS being moved below the water table; or
                                                                        (ii)   previously saturated ASS being aerated.


                                                                  Editor's note—National Sampling and Identification Methods
                                                                  Guidelines is a reference to:
                                                                  (a) National Acid Sulfate Soils Guidance: National acid
                                                                  sulfate soils sampling and identification methods manual,
                                                                  Department of Agriculture and Water Resources, Canberra
                                                                  (Sullivan et al, 2018); and
                                                                  (b) National Acid Sulfate Soils Guidance: National Acid
                                                                  Sulfate Soils Identification and Laboratory Methods Manual,
                                                                  Department of Agriculture and Water Resources, Canberra;
                                                                  and
                                                                  (c) the Australian Standard 4969.

                                                                  OR

                                                                  AO1.2
                                                                  The disturbance of ASS avoids the release of acid and metal
                                                                  contaminants by:­
                                                                  (a)   undertaking an ASS investigation conforming to
                                                                        the National Acid Sulfate Soils Guidance;
                                                                  (b)   neutralising existing acidity and preventing the generation
                                                                        of acid and metal contaminants using strategies
                                                                        documented in the Soil Management Guidelines; and
                                                                  (c)   preventing the release of surface or groundwater flows
                                                                        containing acid and metal contaminants into the
                                                                        environment.

                                                                  AND

                                                                  Editor's note—Soil Management Guidelines is a reference to the
                                                                  'Soil Management Guidelines. Queensland Acid Sulfate Soils
                                                                  Technical Manual'. Dear SE, Moore NG, Dobos SK, Watling KM
                                                                  and Ahern CR. Department of Natural Resources and
                                                                  Mines (2002).

                                                                  AO1.3
                                                                  Where potential or actual ASS is identified, they are managed in
                                                                  accordance with an ASS management plan.


8.2.2              Biodiversity, Waterways and Wetlands Overlay Code


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 3 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.