Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                            Column 2                            Column 3                 Column 4
Map reference                       Trunk infrastructure                Estimated timing         Establishment cost5
BSF21                               Cooran, a pair of regular bus       2021-2026                $27,600
                                    stops on Queen Street near
                                    Elizabeth Street
BSF22                               Noosaville, a pair of regular bus   2021-2026                $96,000
                                    stops on Saltwater Avenue with
                                    indented bays.
BSF23                               Noosaville, a pair of               2026-2031                $115,200
                                    intermediate bus stops on
                                    Shorehaven Drive at Seagull
                                    Park
BSF24                               Noosaville, a pair of regular bus 2026-2031                  $33,600
                                    stops on Shorehaven Drive near
                                    Seacove Court
BSF25                               Noosaville, a pair of regular bus 2026-2031                  $33,600
                                    stops on Riverbreeze Drive near
                                    Mermaid Quay
BSF26                               Peregian Beach, upgrade             2026-2031                $76,800
                                    existing shelter Asset
                                    No.1001019 and construct new
                                    regular bus stop on Podargus
                                    Parade near Parakeet Crescent
BSF27                               Peregian Beach, upgrade             2026-2031                $76,800
                                    existing shelter Asset
                                    No.1001018 and construct new
                                    regular bus stop on Podargus
                                    Parade near Wagtail Drive
BSF28                               Peregian Beach, upgrade             2026-2031                 $115,200
                                    existing shelter Asset
                                    No.1001017 and construct new
                                    intermediate bus stop on
                                    Persimmon Drive near
                                    Persimmon Park
BSF29                               Marcus Beach, upgrade existing      2026-2031                $132,000
                                    shelter Asset No.1001016 and
                                    construct new intermediate bus
                                    stop on Mahogany near
                                    Hawthorn Grove. Works to
                                    include new kerb ramps and
                                    pathways on western side of
                                    Mahogany Drive
TOTAL                                                                                            $44,301,182



5Note- Table SC3.2.2 Column 4 the establishment cost is expressed in current cost terms as at the base date.



Table SC3.2.3          Public parks and land for community facilities schedule of works

Column 1                             Column 2                           Column 3                 Column 4
Map reference                        Trunk infrastructure               Estimated timing         Establishment cost6

Land for community facilities Maps LGIP-PC-1 to LGIP-PC-14



  **FINAL DRAFT - Post Consultation 2019**
                                                                                                                  Page 26 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.