Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Column 1                             Column 2                           Column 3                          Column 4
Map reference                        Trunk infrastructure               Estimated timing                  Establishment cost6
R49                                  Cooran, Straker Park – upgrade     2021-2026                         $85,277
                                     works
R50                                  Pomona, Stan Topper Park –         2021-2026                         $174,176
                                     toilet upgrade
R53                                  Pomona, Joe Bazzo Park – BBQ 2019/2020                               $32,250
                                     and pathways
R55                                  Pomona, Cooroora Creek Park – 2021-2026                              $124,546
                                     upgrade fitness equipment
RF1                                  Peregian Beach, Future Rufous      2021-2023                         $1,380,000
                                     Street Park –landscaping,
                                     embellishments and toilets
 TOTAL                                                                                                     $34,287,871

6Note-Table SC3.2.3 Column 4 the establishment cost is expressed in current cost terms as at the base date.


SC3.3          Local government infrastructure plan maps
SC3.3.1 Priority Infrastructure Area and Service Catchments
Map Code                                     Map Title

Index Reference

LGIP-PIA-SC1                                 LGIP- Noosa Shire Priority Infrastructure Area and Service Catchment
LGIP-PIA-SC2                                 LGIP- Priority Infrastructure Area and Service Catchment -Kin Kin PIA & Service Catchment
LGIP-PIA-SC3                                 LGIP- Priority Infrastructure Area and Service Catchment –Boreen Point PIA & Service
                                             Catchment
LGIP-PIA-SC4                                 LGIP- Priority Infrastructure Area and Service Catchment –Cooran PIA & Service Catchment
LGIP-PIA-SC5                                 LGIP- Priority Infrastructure Area and Service Catchment –Pomona PIA & Service Catchment
LGIP-PIA-SC6                                 LGIP- Priority Infrastructure Area and Service Catchment –Cooroy PIA & Service Catchment
LGIP-PIA-SC7                                 LGIP- Priority Infrastructure Area and Service Catchment –Coastal Area (Tewantin) PIA &
                                             Service Catchment
LGIP-PIA-SC8                                 LGIP- Priority Infrastructure Area and Service Catchment –Coastal Area (Noosaville) PIA &
                                             Service Catchment
LGIP-PIA-SC9                                 LGIP- Priority Infrastructure Area and Service Catchment –Coastal Area (Noosa Heads) PIA &
                                             Service Catchment
LGIP-PIA-SC10                                LGIP- Priority Infrastructure Area and Service Catchment –Coastal Area (Coastal
                                             Communities) PIA & Service Catchment
LGIP-PIA-SC11                                LGIP- Priority Infrastructure Area and Service Catchment –Cooroibah PIA & Service Catchment

SC3.3.2 Stormwater
Map Code                                     Map Title

LGIP-SW-1                                    LGIP PFTI Stormwater –Kin Kin PIA & Service Catchment
LGIP-SW-2                                    LGIP PFTI Stormwater –Boreen Point PIA & Service Catchment
LGIP-SW-3                                    LGIP PFTI Stormwater –Cooran PIA & Service Catchment
LGIP-SW-4                                    LGIP PFTI Stormwater –Pomona PIA & Service Catchment
LGIP-SW-5                                    LGIP PFTI Stormwater –Cooroy PIA & Service Catchment



  **FINAL DRAFT - Post Consultation 2019**
                                                                                                                               Page 29 of 97
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.