Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
(17)   Planting Procedures
       (a)   Correct planting procedures ensure greater success in establishment of landscapes. The following points should be
             complied with:
             (i)      Do not plant in extreme hot, cold or atmospheric disturbances;
             (ii)     Dig separate holes for each plant, 100 millimetres wider and deeper than container. Loosen soil at base of holes a
                      further 150 millimetres in depth. Fill holes with water and allow water to drain away. Refer to Figure SC6.4.3 and
                      Figure SC6.4.4;
             (iii)    Position plant in centre of hole, set and backfill, retaining original soil level of container. Only tease out roots if root
                      ball is compacted or pot­bound;
             (iv)     Incorporate suitable fertiliser and/or water crystals, if required, at time of backfilling ­ refer to section (20);
             (v)      Gently and firmly tap down around root ball, leaving a shallow watering depression. Water immediately and
                      thoroughly using a minimum of 5 litres per plant;
             (vi)     Mulch after planting (and installation of irrigation if applicable) ­ refer to section (18) Mulch types;
             (vii)    Where mulch is already in place, it should be raked well back from around the area and the hole dug. Excess soil
                      should be removed or spread prior to replacing mulch to prevent mixing of the two mediums; and
             (viii)   Plants that are severely root bound are not to be used.

Figures SC6.3.3 Planting in Level Areas




Figure SC6.3.4 Planting on slopes




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                        Page 21 of 24
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.