Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (23.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
          (v)    In particularly critical circumstances, Council may also require bonds from the specific contractors or builders, as
                 well as those from the developer, as a means of ensuring compliance with conditions of approval.

    (c)   Combination bonds:
          (i)    Under most circumstances, components of both remedial/works and performance bonding will be required.
                 Calculation of such combination bonds will be based upon consideration of both Section (b) and (c) above, with the
                 bond being returned following fulfillment of all conditions.




**FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 2 of 2
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.