(ii) Kerb ramps are to be provided at all intersections and be aligned and graded in accordance with the relevant
IPWEA standard drawing.
(iii) All handrails shall conform to the relevant Australian Standard.
(p) Specifications General
(i) Department of Transport and Main Roads (DTMR) specifications apply to all civil works. Where specifications
are not covered by the DTMR specifications, NATSPEC specifications are to be used.
SC6.7.6 Standard Drawings
(1) In general, the standard drawings prepared by the Institute of Public Works and Engineering Australasia are the drawings to be
used for most construction works in Noosa unless noted otherwise on the Noosa Standard Drawing Register.
(2) Addendums outline certain changes to some of the drawings having regard to variations in the way Noosa applies these standard
drawings.
(3) In addition to the IPWEAQ standard drawings, there are specific Noosa standard drawings. These drawings aim to maintain the
uniqueness of Noosa in a look and feel sense.
SC6.7.7 Engineering Plans and Certification
(1) Plans for development are to be prepared by a Licensed Surveyor and a Registered Professional Engineer Queensland as
required by the nature of the proposed identification and design works.
(2) The level and type of information to be submitted to Council shall be sufficient in extent to enable a full understanding of the
proposed works. The design details and plan presentation shall meet appropriate engineering standards.
(3) Construction works are to be certified by a Registered Professional Engineer Queensland and other professionals as true to
design and structurally adequate. The Council’s Inspectors shall inspect and approve the works at hold points in accordance with
Council’s Land Development Construction Compliance Record and the developer’s Consultant Engineer shall liaise with the
Council Inspector on these matters. Inspection requirements will be supplied at the time of receiving approval of engineering
documents. Extra inspections may be carried out at any time throughout the construction period.
SC6.7.8 On Maintenance / Off Maintenance
(1) After development works have been completed to the satisfaction of Council and prior to any works being placed ‘on
maintenance’, as constructed information is to be provided to Council for asset records.
(2) As constructed details shall be in accordance with “Guidelines for Preparation of As Constructed Drawings”.
**FINAL DRAFT Post Consultation 2019**
Page 9 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.