Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (23.3 MB): may take a few minutes to open.
Figure AP3 10A Gateway Treatments
Figure AP3 10B Special Places
**FINAL DRAFT Post Consultation 2019**
Page 15 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.