Log in to see the plans as drawnPO9 AO9.1
Services and infrastructure works (such as stormwater, Underground services are not located within 20 metres of a tower,
sewerage, water and the like) do not impact on the safety and pole, stay or substation boundary.
reliability of substations or major electricity infrastructure.
AO9.2
No valve pits occur within:
(a) for transmission infrastructure, 60 metres of a tower, pole
or stay; or
(b) for distribution infrastructure, 20 metres of a tower, pole or
stay.
AO9.3
Underground services traversing an easement cross at right
angles to the overhead or underground lines.
**FINAL DRAFT Post Consultation 2019**
Page 51 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.