Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
PO9                                                               AO9.1
Services and infrastructure works (such as stormwater,            Underground services are not located within 20 metres of a tower,
sewerage, water and the like) do not impact on the safety and     pole, stay or substation boundary.
reliability of substations or major electricity infrastructure.
                                                                  AO9.2
                                                                  No valve pits occur within:
                                                                  (a)   for transmission infrastructure, 60 metres of a tower, pole
                                                                        or stay; or
                                                                  (b)   for distribution infrastructure, 20 metres of a tower, pole or
                                                                        stay.

                                                                  AO9.3
                                                                  Underground services traversing an easement cross at right
                                                                  angles to the overhead or underground lines.




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 51 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.