Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Location
PO1                                                                AO1.1
Dwelling houses, rooming accommodation, community                  Dwelling houses (including secondary dwellings) and community
residences and short­term accommodation (for holiday homes)        residences are anticipated in the Low density residential zone,
are located in low density environments where they:                Rural residential zone and Rural zone.
(a)   provide a high level of comfort and amenity for occupants;
                                                                   AO1.2
(b)   maintain amenity and privacy of neighbouring premises;
                                                                   Rooming accommodation provides housing choice within urban
(c)   are compatible with the character and streetscape of the     boundaries.
      local area; and
(d)   do not alienate land intended for higher density living.     AO1.3
                                                                   Buildings constructed as dwelling houses may be available for
                                                                   short­term accommodation where:
                                                                   (a)   occupied by short term guests on no more than 4
                                                                         occurrences in any calendar year; and
                                                                   (b)   occupied by short term guests for a total of no more than 60
                                                                         nights in any calendar year.

                                                                   Editor’s Note— Short­term accommodation must not constitute or
                                                                   be used as a party house as separately defined in Schedule 1 and
                                                                   addressed in Part 1.8.


Effects of Use         9.3.1.3 Criteria for assessment (part)
Performance outcomes                                               Acceptable Outcomes
Effects of Use
Removal homes
PO2                                                                AO2.1
A removal home—                                                    Any part of a removal home that is affected by termite attack,
(a)   does not have an adverse impact on the amenity of the        borers, dry rot or severe weathering or is damaged as a
      premises or surrounding premises; and                        consequence of relocation, is repaired or replaced using new or
                                                                   sound second­hand materials.
(b)   maintains the safety of people and property.
                                                                   AO2.2
                                                                   Where located within the urban boundary, external surfaces of the
                                                                   building are cleaned and painted.

                                                                   Editor’s Note— the urban boundary is indicated on the zone
                                                                   maps contained within Schedule 2.

                                                                   Editor’s Note— applicants will be required to pay a performance
                                                                   bond to Council before final building approval is granted. The
                                                                   bond is held by Council until all external building works are
                                                                   completed to a satisfactory level, usually within a 12 to 24 month
                                                                   time frame.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                             Page 2 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.