Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable Outcomes
PO4                                                                  AO4.1
Visitor accommodation is located such that it preserves the safety   Accommodation adjacent to or within 50 metres of an existing
of guests and does not impact on the function of infrastructure      electricity substation incorporates noise attenuation measures to
including:                                                           mitigate noise impacts.
(a)   the major road network;
                                                                     AO4.2
(b)   the North Coast railway line;
                                                                     Buildings and structures (including swimming pools, sheds,
(c)   existing and future electricity supply infrastructure; and     tennis courts and outbuildings) are not constructed under
(d)   water supply and waste water treatment.                        overhead electricity transmission lines, or within electricity
                                                                     easements.

                                                                     AO4.3
                                                                     Accommodation:
                                                                     (a)   within a designated transport noise corridor; or
                                                                     (b)    within 100 metres of an existing electricity substation—
                                                                     incorporates noise attenuation measures to mitigate noise
                                                                     impacts and guests are not accommodated in lightweight
                                                                     shelters (such as tents, yurts, recreational vehicles, or relocatable
                                                                     dwellings).

                                                                     Editor’s Note— The State Planning Policy Interactive Mapping
                                                                     System can be used to find out if a property is located in a
                                                                     designated transport noise corridor or close to electricity
                                                                     infrastructure.

                                                                     AO4.4
                                                                     Accommodation within a water catchment area relies on minimal
                                                                     clearing of natural vegetation, earthworks, and movement of
                                                                     sediments or nutrients from the site and any on­site disposal of
                                                                     effluent is to a secondary treatment standard.

                                                                     Editor’s Note— The water supply buffer area is shown on the
                                                                     Regional Infrastructure Overlay Maps.

                                                                     AO4.5
                                                                     Accommodation does not occur within 400 metres of a sewerage
                                                                     treatment plant.




Safety and amenity             Table 9.3.5.3 Criteria for assessment (part)
Performance outcomes                                                 Acceptable Outcomes
All Visitor Accommodation
Safety and amenity
PO5
Walkways, carparks and publicly accessible facilities, including    No acceptable outcome provided
toilets, and bicycle racks are located and designed to allow casual
surveillance by other persons.
PO6
Pathways allow clear sightlines in all directions.                   No acceptable outcome provided




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 3 of 12
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.