RFI - Engineering Plans · MCU22/0197

of 21

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                            GENERAL NOTES                                                                      ANDSTOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED.                       3.   UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR                    THE   GEOTECHNICAL     INVESTIGATION  REPORT    BY   TECTONIC.
                                                                                                           19. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                     SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING                         TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND
                            1.    ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                   HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                             SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE                    TO BE FORMED AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR
                                                                                                                                                                                                MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.                    BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY
                            2.    ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE                      20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT                                                                                                         THE GEOTECHNICAL ENGINEER.
                                  CONTRACTOR. CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY                       AUTHORITY: ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN                 4.   COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES
                                  TO ACCURATELY SETOUT THE WORKS.                                               FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO                       SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY                     21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE
                                                                                                                ALLOW FOR ALL COSTS ASSOCIATED WITH IMPLEMENTATION OF THE                       COMPACTION EQUIPMENT. CARE MUST BE TAKEN TO ENSURE THERE                     ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE
                            3.    ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                        TMP.                                                                            ARE NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE                     ADVICE OF A SPECIALIST SHORING CONTRACTOR.
                                  SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                                                                                     COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND
                                  CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                          AS1289.                                                                  22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
                                  GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED                      AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN                                                                                                          SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                  STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                   ACCORDANCE WITH OPW APPROVALS BY COUNCIL.                                  5.   A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE                       CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
                                                                                                                                                                                                REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN                      STRUCTURAL ENGINEER.
                            4.    SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED                        22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                       AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN
                                  OUTSIDE OF THE TOLERANCES SPECIFIED WITHIN THE PROJECT                        BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN                         WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF               23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT
                                  SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS, THE                           OF THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY,                     ANY HEAVY MOBILE PLANT ON THE SITE.                                          ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES
                                  CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY                        ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                                                                                    ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM
                                  ADDITIONAL COSTS INCURRED BY RECOR.                                                                                                                      6.   IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND                         FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
                                                                                                            23. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION                       COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED                     SATISFACTION.
                            5.    EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND                    DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                    AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM
                                  AS SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO                                                                                                               LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED              24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS
                                  RESPONSIBILITY IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE                                                                                                     MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM                     INCLUSIVE OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING
                                                                                                            24. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
                                  ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE                                                                                                      PARTICLE SIZE OF 100MM AND CAPABLE OF BEING COMPACTED INTO                   DRAWINGS FOR BUILDING SLAB THICKNESSES AND HYDRAULIC
                                                                                                                ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN
                                  RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH                                                                                                      COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL                     DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF
                                                                                                                AND CONSTRUCTION CODE (2013).
                                  THE LOCATION AND LEVEL OF ALL EXISTING SERVICES PRIOR THE                                                                                                     SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL                 REQUIRED BULK EARTHWORKS SURFACE.
                                  COMMENCEMENT OF ANY WORKS. ANY DISCREPANCIES SHALL BE                                                                                                         INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                  REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO LOCATE AND                  STANDARD SIGNS AND LINE MARKING NOTES
                                                                                                                                                                                                                                                                         25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
                                  PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.                      1. GENERAL                                                                      7.   ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE                  GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                                                                                                             a. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH                      CONTENT FOR STANDARD COMPACTION.                                             FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO
                            6.    THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                    THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC                                                                                                           UNDERTAKE THE PRELOADING OPERATIONS.
                                  SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS                     CONTROL DEVICES (CURRENT EDITION).                                         8.   ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
                                  SHOWN ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING                                                                                                        PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                                           2. SIGNS                                                                                                                                                      26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                  SERVICES CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS.                                                                                                        RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS
                                                                                                             a. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS
                                  CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO                                                                                                         IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                  RECOR AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL                    NOTED OTHERWISE.
                                                                                                                                                                                                STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE
                                  WORKS.                                                                     b. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                      WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.                   INSPECTIONS:
                                                                                                                EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                                                                                                THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
                            7.    ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS                   POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM                   9.   REFER   ARCHITECT/LANDSCAPE     ARCHITECT    DRAWINGS     FOR            BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR
                                  SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS,                         FACE OF KERB.                                                                   CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.                        IS TO PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
                                  FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND                                                                                                                                                                             INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN
                                  ROAD PAVEMENTS.                                                            c. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING
                                                                                                                                                                                           10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2'             INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO
                                                                                                                TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                                                                                           ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF
                                                                                                                                                                                               SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF
                            8.    CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                   BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                                                                                                      RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL
                                                                                                                                                                                               AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL
                                  AUTHORITY/COUNCIL'S   INFRASTRUCTURE.  SUCH     REPAIR  OR                    HEADLIGHT.                                                                     PROVIDE    CERTIFICATION  THAT    ALL GENERAL    EARTHWORKS               REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
                                  REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE                       3. SIGN SUPPORTS                                                                    OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE
                                  SATISFACTION   OF    INFRASTRUCTURE    OWNER/MANAGER       /               a. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS                         DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS                     a. PRESTART
                                  AUTHORITY/COUNCIL.                                                                                                                                           SUITABLE FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER
                                                                                                                WHERE THEY ARE IN A PAVED SURFACE.
                                                                                                           4. LINEMARKING                                                                      THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL                   b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF
                            9.    CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                                                                                                     REPORT.                                                                       SEDIMENT AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                                                                             a. REDUNDANT LINEMARKING IS TO BE GROUND OFF.
                                  WORKPLACE HEALTH AND SAFETY REQUIREMENTS.
                                                                                                             b. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
                                                                                                                                                                                           11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED
                                                                                                                                                                                                                                                                          c. SIDE AND CUT OFF DRAINS
                            10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN                                                                                                        TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX
                                CLOSE PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR                           JOINTING NOTES                                                                     OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT
                                INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO                                                                                                       IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).                  d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
                                PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY OF                  1.    ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE
                                EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE                     REQUIREMENTS OF AS3727.1:2016.
                                                                                                                                                                                           12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO                   e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS                       2.   SAW CUT JOINTS MUST BE:
                                                                                                                                                                                               TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
                                REQUIRED.                                                                    a. BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS.                                   300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE
                                                                                                                                                                                                                                                                          f. STORMWATER STRUCTURE BASE SLABS
                                                                                                                         4      3                                                              ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
                            11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                     b. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                                 ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND                         c. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                                                                                              g. SEWER RETICULATION
                                RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.                                                                                                      13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
                                                                                                            3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT
                                                                                                                 TO ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                 ACCORDANCE WITH LANDSCAPE DRAWINGS.                                        h. WATER RETICULATION
                            12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                       4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
                                CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                            CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES                 14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                        i. PAVEMENT SUBGRADE
                                REQUIREMENTS.  UNLESS   OTHERWISE    ADVISED   BY RECOR                          IN THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.
                                CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.                              5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES                15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
                                                                                                                 ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB                                                                                            j. PAVEMENT REINFORCING
                                                                                                                                                                                               MANAGEMENT PLANS.
                            13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH                             SURFACE.
                                RELEVANT APPROVALS.                                                         6. DOWEL BARS ARE TO BE                                                                                                                                       k. PAVEMENT PRIOR TO SEALING (PRESEAL)
                                                                                                                                                                                           16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES
                                                                                                              a. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                    ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT
                            14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                        400MM CENTRES                                                                 FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL                  l. RETAINING WALL FOOTING REINFORCING
                                LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
                                                                                                             b. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                     PLAN
                                CONSTRUCTION.
                                                                                                                 300MM CENTRES                                                                                                                                            m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
                                                                                                              c. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL
                            15. CONTRACTOR TO ORGANISE ALL DEMOLITION          PERMITS   PRIOR
                                                                                                                                                                                               BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER
                                DEMOLITION WORKS COMMENCING ON SITE.                                             300MM CENTRES                                                                                                                                            n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
                                                                                                                                                                                               RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.

                            16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,                                                                                                                                                                                  o. PRACTICAL COMPLETION
                                                                                                                                                                                           18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON
                                ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM                    EARTHWORKS NOTES                                                                   UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
                                SITE U.N.O.
                                                                                                           1.    FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                     LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS                p. ON MAINTENANCE
                                                                                                                 INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS                          ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                            17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                        RECOMMENDED    THAT  THE    GEOTECHNICAL  CONSULTANT   BE                     PRACTICAL TO RESTRICT DUST MOVEMENT.
                                PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO                                 CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO                                                                                                        q. OFF MAINTENANCE
                                COMMENCEMENT OF ANY WORKS ON SITE.                                               EARTHWORKS COMMENCING.                                                    19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
                                                                                                                                                                                               THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE                r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
                            18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS                      2.   GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF                     WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.                                 DEVELOPMENT APPROVAL)
                                IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN.                           100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED
                                CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE                               OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF                       20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE                 s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
                                COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.                        LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN                      REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN
                                CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION                              STRUCTURAL FILL.                                                                                                                                            RELEVANT TO THEIR CERTIFICATION SCHEME




                                                                                           ENERGY SERVICE PROVIDERS                                                  TELECOMMUNICATIONS
                                                                                                                                                                      SERVICE PROVIDERS                                                                elstra                                          Manual of Uniform Traffic Control Devices
           BEFORE YOU DIG               SERVICE LOCATIONS                                      AGL
                                                                                                                       ERGON.                                                                                                                                AUSTRALIA
                                       IT IS THE RESPONSIBILITY OF THE PRINCIPAL
                                                                                                                       ENERGY
                                                                                                                                         energex                   ' yes'  Telstra visionstream
                                      CONTRACTOR TO CONTACT ALL RELEVANT                                  origin                                                      OPTUS                                                    WARNING: OPTIC FIBRE                                                     NOTE: ALL SIGNS & LINE MARKING TO BE IN
                                      SERVICE AUTHORITIES TO VERIFY THE                  NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                      NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM               EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                      LOCATION OF ALL EXISTING SERVICES PRIOR                  PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                         PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED            VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO                              ACCORDANCE WITH THE MANUAL OF
                                                                                               PRIOR TO START OF CONSTRUCTION. PHONE DBYD                             PRIOR TO START OF CONSTRUCTION. PHONE DBYD
                                      TO THE START OF CONSTRUCTION                             SERVICE LOCATIONS ON 1100 FOR DETAILS.                                 SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                                BE CONFIRMED PRIOR TO START OF CONSTRUCTION.                                  UNIFORM TRAFFIC CONTROL DEVICES.



                                                                                                            CLIENT DETAILS:                                                       PROJECT ADDRESS:                                                   APPROVED BY:                         PROJECT NAME:

                                                                                                                                                                                                                                                                                         PROPOSED RESIDENTIAL DUPLEX
                                                                                                                                                                                                                                                                                          TITLE:                                         STATUS:
                                                                                                                              IZAROX QLD PTY LTD                                        73 SOUTHERN CROSS PARADE
                                                                                                                                                                                                                                                                                         GENERAL NOTES                                  FOR APPROVAL - NOT FOR
 © ABN 89 647 469 707
                                                                                                                                                                                          SUNRISE BEACH QLD 4567                                           NATHAN WAGSTAFF                                                              CONSTRUCTION
                                  B      23/02/23   INFORMATION RESPONSE           QT      JB        JB
    37 MARY ST                                                                                                                                                                                                                                                RPEQ: 26443
                                  A      25/10/22   FOR APPROVAL                   QT      JB        JB     SCALE:
NOOSAVILLE, QLD 4566                                                                                                                                                                                                                                          CPEng NER                   DRAWING NUMBER:                                PROJECT NUMBER:   SHEET REV:
                                 REV     DATE               DESCRIPTION            DWN    CHK        APP
   +61 7 5211 1003
                                                                                                                                           NTS                                                                                                               DATE: 23/02/23                                                                                 SIZE:
RECORCONSULTING.COM                                                REVISIONS
                                                                                                                                DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                          002                                            20220237          A1 B

Used in these records

About this file

File size
7.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Engineering Plans.pdf · 7.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.