                                       Form 6 - Decision Notice
                                       INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2008/274                                Date of Decision:       27 February 2008

1.     APPLICANT DETAILS

 Name:               Jetter Pty Ltd

 Postal address:     CARE Noosa Jetty Builders
                     PO Box 299
                     NOOSAVILLE QLD 4566


 Phone no:           0408 137 526                Fax no:         5474 3480

2.     PROPERTY DESCRIPTION

 Street address:     27 Masthead Quay Noosaville

 Real property       Lot 603 RP 883862
 description:

3.     OWNER DETAILS

 Name:               Jetter Pty Ltd

 Postal address:     CARE PKF Chartered Accountants
                     GPO Box 1078 BRISBANE QLD 4001

4.     REFERRAL AGENCIES

 Referral Agency             Address                                                      Basis
 Nil

5.     APPLICATION TYPE

 Development                          Development Details                        Preliminary      Development
                                                                                  Approval           Permit
 Operational Works                    Transport Type 5 - Jetty                       No               Yes

6.     DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

Not Applicable.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.
Full text of the other 6 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                               2 of 7

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Nil

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                              Date:       28/02/08




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     3 of 7




                                       Noosa Council Conditions
                                       INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     Development undertaken in accordance with this approval must generally comply with the approved plans
       of development. The approved plans are numbered 08/23-1 and 08/23-2 prepared by John Norden and
       Associates and dated February 2008 and as may be amended by these conditions.

2.     The “boat storage by others” shown adjacent to the jetty on drawing number 08/23-1 prepared by John
       Norden and Associates and dated February 2008 is not included in this approval.

3.     All parts, including any structures below water level, of the existing jetty are to be removed as part of the
       construction of the new jetty.

4.     Structures should be designed and constructed such that they are free standing within the waterway and
       are not connected to or behind the revetment wall.

5.     Jetties should have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the revetment
       wall.

6.     A rigid handrail shall be fitted on one side of the walkway.

7.     No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they
       provide support for the handrail.

8.     No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a
       vessel above the water without Council approval.

9.     There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond the
       revetment wall.

10.    Lighting associated with the use shall be designed, installed, operated, and maintained in accordance
       with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.

11.    The jetty is to be used for private purposes only with no commercial operations to be undertaken.

12.    Rock scour protection, wrapped in geotextile, extends 3000 mm from the face of the revetment wall in this
       locality. Prior to driving piles, the rocks are to be removed to expose the geotextile and the geotextile cut
       neatly to allow it to be turned back. During pile driving, care is to be taken to ensure the geotextile is not
       damaged. At the completion of pile driving, the fabric is to be turned down around the pile and the rocks
       replaced around the piles.

13.    Boat repair activities will not be permitted on site.

14.    Wastewater and sullage shall only be disposed of at approved pumpout facilities.

15.    The mooring facility shall not be utilised for live-aboard purposes.

16.    Any construction and post construction activity is not to impact on the condition of the waterway, and is to
       be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental
       Protection (Water) Policy 1997.

17.    The approval or conditions do not constitute a ruling on structural safety and the applicant must make
       their own arrangement to ensure adequacy of design and work. Also any approval granted does not
       warrant that such plans and specifications have been checked in detail, nor does not warrant that such
       plans and specifications have been checked in detail, nor does it absolve the owner of the land from
       complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or
       relevant statues and/or statutory regulations in the execution and/or performance of said works. The
       Council does not accept any responsibility for the accuracy of such plans and specifications as approved.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  4 of 7


18.    Certification by a Registered Professional Engineer of Queensland that states that the jetty is constructed
       in accordance with best practice methods and is structurally sound shall be submitted to Council prior to
       the return of any bond monies held by Council. A final inspection and approval of the structure by
       Council’s Inspector is also required prior to the return of any bond monies held by Council. Please
       contact Council’s Land Development Section to arrange the inspection.

19.    The jetty shall be licensed with the Council upon completion of the structural work and shall be licensed
       annually thereafter

20.    The Development Permit for a operational works of use of premises lapses if the use has not happened
       by 27 February 2010, unless an application to extend the currency is approved by Council.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     5 of 7



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.    Should any changes or modifications to the approved plans be required as a result of construction
      constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be made.
      Amended plans clearly indicating the changes must be lodged with this application along with the
      appropriate fees.

2.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No.
      12, prevents a builder or building contractor carrying out building work on a building site in a way that makes
      or causes audible noise to be made from the building work:-

      2.1. On a Sunday or public holiday, at any time; or

      2.2. On a Saturday or a business day, before 7.00am or after 6.30pm.

      A maximum penalty of $1,500 applies to an offence under this legislation.

3.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
      operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
      accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
      Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
      requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
      works must be submitted to Council prior to the commencement of any works over the site.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           6 of 7



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to
                                                                          against the part of the approval that represents the
   development applications
                                                                          concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-
   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;
                                                                             (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
       (2) The appeal must be started within 20 business                  approval resulted from a development application
                                                                          (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day
                                                                          if it were an application under a superseded planning
   the decision notice or negotiated decision notice is
                                                                          scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the
                                                                          mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the
                                                                          against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact
                                                                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for
                                                                          the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                             7 of 7

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]

Used in these records

About this file

File size
28 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000274.001 [As Published].pdf · 28 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.