Council archive · source document
Decision Notice - 010.2008.00000274.001 [As Published] · 142008.274
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are numbered 08/23-1 and 08/23-2 prepared by John Norden and
Associates and dated February 2008 and as may be amended by these conditions.
2. The “boat storage by others” shown adjacent to the jetty on drawing number 08/23-1 prepared by John
Norden and Associates and dated February 2008 is not included in this approval.
3. All parts, including any structures below water level, of the existing jetty are to be removed as part of the
construction of the new jetty.
4. Structures should be designed and constructed such that they are free standing within the waterway and
are not connected to or behind the revetment wall.
5. Jetties should have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the revetment
wall.
6. A rigid handrail shall be fitted on one side of the walkway.
7. No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they
provide support for the handrail.
8. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a
vessel above the water without Council approval.
9. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond the
revetment wall.
10. Lighting associated with the use shall be designed, installed, operated, and maintained in accordance
with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
11. The jetty is to be used for private purposes only with no commercial operations to be undertaken.
12. Rock scour protection, wrapped in geotextile, extends 3000 mm from the face of the revetment wall in this
locality. Prior to driving piles, the rocks are to be removed to expose the geotextile and the geotextile cut
neatly to allow it to be turned back. During pile driving, care is to be taken to ensure the geotextile is not
damaged. At the completion of pile driving, the fabric is to be turned down around the pile and the rocks
replaced around the piles.
13. Boat repair activities will not be permitted on site.
14. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
15. The mooring facility shall not be utilised for live-aboard purposes.
16. Any construction and post construction activity is not to impact on the condition of the waterway, and is to
be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental
Protection (Water) Policy 1997.
17. The approval or conditions do not constitute a ruling on structural safety and the applicant must make
their own arrangement to ensure adequacy of design and work. Also any approval granted does not
warrant that such plans and specifications have been checked in detail, nor does not warrant that such
plans and specifications have been checked in detail, nor does it absolve the owner of the land from
complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or
relevant statues and/or statutory regulations in the execution and/or performance of said works. The
Council does not accept any responsibility for the accuracy of such plans and specifications as approved.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc024d4b\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000274.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28 KB (small file)
- File type
No other editions are linked here.