Council archive · source document
09/0463 - MCU - Detached House [As Published] · 132009.463
fay
IDAS Assessment Checklist, Version 2
1.1A isa any 1 part of the proposal intended tobe carried out o ona ; Queensland heritage place under the Queenstand Heritage Act 1992?
EX] No-cotor.18 = ([] Yes +"
IPA, schedule 4. part |, table 5, kem 2: IP Reguiazen, sc
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part:11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land? ft.
DX] No-Gofoar2 [_] Yes
IPA, schedide & part {. taile 5, ker 2A, iP Regulation, schedule t, part 2, table: 5, i
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
(K] No-Gotoa13 [_] Yes
mn TIP Regulation, schedule 2, table 2, item 11; 1P Regulation, schedule 1, table 5, len 2 (wild river ares): Water Act 2000,
5, section 434
IPA, schedule 8 part 1, table 5,
section 965C; Wild Rivers Ac
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity ora a petroleum activity?
[XJ No -Gotoat.4 0% Yes
14 Is any part o of the p premises within the limits of a port under the Transport Infrastructure Act 1994?
DX] No - Gotoars
C1 Yes
12 Regulation, schedule 2. table 2. terms 15 and 1€
1.6 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? .
KX] No - Goto.a1.6
O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is notthe
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
¥
iP Regt jon, schedule 2, table 2. itom 26 or
1.6 i any part of the premises designated for community infrastructure? ,
‘
EX] No - Goto. Q1.7 wet
CJ Yes “y
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
BX] No -Endof Section’ [_] Yes _ 1 ay
IP Regulation, schedule 2, tabie 2. dem 5
ie”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0463 - MCU - Detached House [As Published]Related documentApplication case desk ↗
001A57C0.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.