Skip to the record
Accept no substitutions.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

    
 

 
 

Department of Environment
ETB eo cace ital

7. Action program

Form
Plan of operations for level 2 mining projects

Tick the relevant box below to indicate whether the mining activity is fully compliant with the Code of
Environmental Compliance for Mining Projects (the Code) or any additional conditions of the EA.

It is important that you provide accurate information in this part of the plan. Penalties can apply for false or

misleading information.

o Yes — The mining operation complies with the standard environmental conditions in the Code
or the Code with additional conditions.

IX No > The mining operation does not comply with the standard environmental conditions in the
Code or the Code with additional conditions.

In the table below provide details of conditions that are not or cannot currently be complied with and what is
being done to achieve compliance. If you can not achieve compliance with the Code you may need to amend
your plan of operations or apply to amend your environmental authority.

 

Standard environmental conditions in
the code or conditions of the EA that the
mining operation does not comply with

Actions to achieve compliance

 

State here the condition of the Code or EA with which
you do not comply

EA Condition 14.

The holder of the EA must not carry out
activities:

2) in, or within 1km of, a Category B
Environmentally Sensitive Area.

Glenwood, West Ridge and Red Pit
Quarries are situated in areas which are
less than 1km of a Category B area. The
Cooroy Mining Lease Project final version
of the Environmental Authority was issued
in 2005 and therefore this is a historical
grant of these mining leases in these
locations.

 

 

State here the specific actions you are taking and the time frame within which
they are to be completed in order to achieve compliance

There is no proposed future mining disturbance which will
encroach upon the Category B areas. Rehabilitation will be
implemented during the term of the Plan which will ensure
maximum practicable buffer widths from these areas are
established.

 

 

 

Page 5 of 12 » 120319 * EM927 « Version 1A

Department of Environment and Resource Management
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.