Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 148, section 1. The text section number identifies this passage in the reader.

Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald

© 2012 - TTM Consulting (SC) Pty Ltd                                                              Reference No: 12SCT0037




Table Index
Table 3.1: Local Road Hierarchy                                                                                             5
Table 4.1: Existing Daily Traffic Volumes                                                                                   7
Table 6.1: Two Lane Rural Road Capacity – Rolling Terrain Two-Way Flow                                                   11
Table 6.2: Maximum AADT’s for Various LOS on Two-Lane Two-Way Rural Roads                                                12
Table 7.1: Westridge Quarry Access Characteristics                                                                       14
Table 7.2: White Pit Quarry Access Characteristics                                                                       17
Table 8.1: Observed Road Key Issue Condition Summary                                                                     23



Figure Index
Figure 1.1: Site Location                                                                                                   2
Figure 2.1: Proposed Haul Route                                                                                             3
Figure 4.1: Existing (Surveyed) Peak Hour Traffic Volumes 2011                                                              6
Figure 5.1: Estimated Development Generated Turn Movements                                                                  9
Figure 5.2: Estimated 2014 Peak Hour Traffic, Without Development (6% p.a. growth)                                          9
Figure 5.3: Estimated 2014 Peak Hour Traffic, With Development                                                           10
Figure 6.1: RPDM Table 13.4 Intersection Capacity                                                                        13
Figure 7.1: Westridge Quarry Access: Aerial and Site Photographs                                                         15
Figure 7.2: White Pit Quarry Access: Aerial and Site Photographs                                                         18
Figure 7.3: White Pit Quarry Secondary Access: Aerial and Site Photographs                                               20
Figure 8.1: Typical Haulage Pavement Conditions: Lake MacDonald Drive Corridor                                           24




T:\Projects\12SCT\12SCT0037 CSR West Ridge Quarry Lake McDonald\Reports\TTM Traffic Report 03 December 2012 Final.docx   iv
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.