Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 158, section 1. The text section number identifies this passage in the reader.
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
5.4 Future (2014) Project Traffic Demands
The future project case scenario is obtained by the addition of development traffic generation
shown in Figure 5.1 to the base traffic volumes shown in Figure 5.2. These expected traffic
movements are shown in Figure 5.3.
132 / 76
Westridge
0/0
Quarry
0/0
Access 5/8
8/5
44 / 121
167 / 101
White Pit 5/5
Quarry
Access 5/5
0/3
Macdonald
Legend
123 / 456 = AM / PM
3/0
66 / 151
Drive
Lake
Figure 5.3: Estimated 2014 Peak Hour Traffic, With Development
Page | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.