Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 161, section 1. The text section number identifies this passage in the reader.

Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald

© 2012 - TTM Consulting (SC) Pty Ltd                                        Reference No: 12SCT0037


The estimated turn and through movements at each access location noted in Figure 6.1 do not
warrant a detailed capacity analysis i.e. Sidra Intersection Analysis Software, as they result in
uninterrupted flow conditions. As such the existing access layouts are considered to have suitable
capacity.
On the basis of the existing and predicted development peak hour intersection traffic flows, as
shown in Chapter 5, the level of peak hour traffic is below the criteria for a two-lane road type as
shown in Figure 6.1 (RPDM Table 13.4). It is therefore considered that the intersection will
operate at uninterrupted flow conditions in 2013.




Figure 6.1: RPDM Table 13.4 Intersection Capacity


6.5        Public Transport and Bicycle Facilities
The proposed haulage activities are not anticipated to adversely impact existing public transport,
mainly school buses. The Drivers Code of Conduct should identify that appropriate caution should
be taken in the vicinity of bus stops and buses.
The Drivers Code of Conduct should also include information regarding the treatment and
awareness of on road cyclists when entering, exiting or travelling along the haulage route.
As further noted, it is recommended that the speed limit is temporarily reduced to 60km/h for the
duration of the works activity.




                                                                                           Page | 13
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.