Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 191, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                            Page 7
West Ridge Quarry
Site Based Management Plan



Table 4 - Definitions of Consequence

Rating                          Descriptor                                                           Score

Negligible                      Impacts not requiring any treatment or management action             1
                                Nuisance or insignificant environmental harm requiring minor
Minor                                                                                                2
                                management action
Moderate                        Serious environmental impacts, readily manageable at low cost        3
                                Substantial environmental impacts, manageable but at considerable
Major                                                                                                4
                                cost and some disruption
                                Severe environmental impacts with major consequent disruption and
Catastrophic                                                                                         5
                                heavy cost

The consequence and likelihood scores are then plotted on the Risk Assessment Matrix, see Table 5 - Risk Assessment
Matrix. The final risk level assigned is a product of the likelihood and consequence scores. The higher the risk score, the
higher the priority is for management.

Table 5 - Risk Assessment Matrix
                                               Consequence
Likelihood                                     Negligible     Minor            Moderate         Major         Catastrophic
                                               1              2                3                4             5
Almost                                         5              10               15               20            25
                         5
Certain                                        Medium         High             High             Extreme       Extreme
                                               4              8                12               16            20
Likely                   4
                                               Low            Medium           High             High          Extreme
                                               3              6                9                12            15
Possible                 3
                                               Low            Medium           Medium           High          High
                                               2              4                6                8             10
Unlikely                 2
                                               Low            Low              Medium           Medium        High
                                               1              2                3                4             5
Rare                     1
                                               Low            Low              Low              Low           Medium

Table 6 - Indicative Management Option for Each Risk Assessment Rating describes the possible actions required for
each risk assessment rating.

Table 6 - Indicative Management Option for Each Risk Assessment Rating

Risk Rating                              Risk Rating Scores      Indicative Management Option
                                                                 Manage by implementing Site management and emergency
Extreme                                  16 – 25
                                                                 procedures, plant design controls and regular monitoring
                                                                 Manage by implementing Site management and emergency
High                                     10 – 15                 procedures, specific monitoring and may require some
                                                                 operation/plant design controls
                                                                 Manage by implementing specific monitoring or response
Medium                                   5–9
                                                                 procedures
                                                                 Manage by routine procedures, unlikely to need specific
Low                                      1-4
                                                                 application of resources




December 2012 / file ref. 1271_610_001                                                                       GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.