CSR Building Products Limited Page 24
West Ridge Quarry
Site Based Management Plan
3.2.5 Monitoring
Daily visual surveillance will be undertaken by all employees to ensure dust generation on-site is being controlled.
When requested by the administering authority, dust and particulate monitoring will be undertaken to investigate any
complaint relating to environmental nuisance or health caused by dust and/or particulate matter and the results
notified within 14 days to the administering authority following completion of monitoring. Monitoring shall be carried
out at a place(s) relevant to the potentially affected dust-sensitive place and must include:
- for a complaint alleging dust nuisance – dust deposition; and
- for a complaint alleging adverse health effects caused by dust – the concentration of particulate matter, per cubic
metre, with an aerodynamic diameter of less than 10 µm (PM10) suspended in the atmosphere over a 24 hour
averaging time.
3.2.6 Auditing and Review
Air quality management strategies implemented on-site shall be reviewed at least every three years or earlier if
required.
3.2.7 Reporting and Responsibility
All complaints relating to dust shall be recorded in the complaint register or work diary.
The Site Manager shall investigate complaints and take actions in accordance with the complaint handling procedure.
The Site Manager will be responsible for ensuring that dust suppression equipment is maintained and in good working
order.
The Site Manager shall maintain records of any dust monitoring undertaken on-site for a minimum of five years.
3.2.8 Identification of Incident or Failure to Comply
Receipt of a nuisance dust complaint.
Observations of uncontrolled visible dust being generated on-site and leaving the Site boundary.
3.2.9 Contingency Plan
If a complaint is received as a result of on-site activities an investigation will be conducted and actions taken to resolve
the cause of the problem as far as practicable.
The Site Manager will undertake appropriate action to rectify any identified deficiencies in dust control.
The Site Manager may request the services of a specialist consultant to investigate and to give advice on dust control
measures that should be implemented at the Site to prevent environmental nuisance.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.