Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 215, section 1. The text section number identifies this passage in the reader.
CSR Building Products Limited Page 31
West Ridge Quarry
Site Based Management Plan
- segregating wastes on-site into scrap metal, oily wastes, recyclable wastes (paper/cardboard and aluminium),
tyres, batteries and general wastes;
- removing wastes from Site for disposal or recycling by appropriate licensed operator(s); and
- no burning or burring wastes on-site unless approved by the Administering Authority.
3.5.5 Monitoring
The Site Manager will undertake a monthly visual inspection to ensure the waste management hierarchy is being
effectively implemented.
All Employees and contractors shall be responsible for ensuring wastes are segregated, stored and removed from the
Site on a regular basis.
3.5.6 Auditing and Review
The waste management strategies for the quarry operations will be reviewed at least every three years or when
necessary.
3.5.7 Reporting and Responsibility
The Site Manager shall maintain a manifest of any regulated (trackable) waste and methods of disposal in accordance
with the EP (Waste Management) Regulation and any other wastes required by the development approval.
3.5.8 Identification of Incident or Failure to Comply
Waste bins overflowing.
Litter observed within the on-site operational areas.
Wastes not correctly disposed of.
Unauthorized burning or burring of wastes on-site.
Re-usable or recyclable wastes not being segregated
Disposal records of control wastes not being maintained.
Unauthorised removal of wastes from the Site.
Disposal of waste management records prior to five years from date of generation.
Any breach in containers for transporting hazardous materials.
Spilled chemicals or liquid wastes enter the stormwater drainage system.
Transport, storage or disposal of wastes by an unlicensed contractor and/or to a facility unlicensed to accept a specific
waste.
Waste oils and greases not stored in segregated containers for collection by an approved waste contractor for
recycling.
3.5.9 Contingency Plan
Site Manager shall investigate the incident and review workplace practices.
Site Manager shall facilitate the disposal, recycling or reuse of waste materials in an approved manner.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.