Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 221, section 1. The text section number identifies this passage in the reader.
CSR Building Products Limited Page 37
West Ridge Quarry
Site Based Management Plan
3.7 Bushfire
3.7.1 Purpose
While the actual operations are situated within a pre-cleared area of low bushfire risk, the Site is bounded on all sides by
remnant vegetation mapped as Medium Bushfire Hazard in accordance with the State Planning Policy 01/03, see Figure 7
– Bushfire Hazard Map.
3.7.2 Operational Policy
Responsible Site operations so as to prevent and assist in the control of bush fires in the surrounding locality,
wherever possible.
3.7.3 Performance Targets
To ensure that potential sources of fire from the quarry activities are properly managed, mitigated or controlled and
that a network of tracks and water sources are accessible throughout the Site to help control fire that might occur
external to, or which may enter the Site.
To comply with legal obligations for the prevention and control of fires, as required in the Fire and Rescue Service Act
1990 and Regulation.
3.7.4 Implementation Strategy/Mitigation Measures
Management procedures for protection against fire will include:
- consulting with landowners and fire services for implementing fire control management on-site with district/area
fire control plans;
- maintaining cleared surrounds and/or managed fuel loads to a minimum 20 meter buffer area to the west and
south of the quarry operations;
- ensuring all staff on-site and other personnel are aware of evacuation procedures and the location and the use of
fire fighting equipment;
- keeping relevant agencies contact numbers in the event of a fire, namely Queensland Fire Rescue Services;
- ensuring that extinguishers, fire hoses, fire blankets, sand buckets and other such equipment is regularly
inspected and maintained in accordance with Australian Standard AS 1851, Maintenance of Fire Protection
Equipment;
- providing ready access to water storages on-site for use in the fighting of fire;
- providing fire breaks around quarry operations and in particular fuel storages and workshop areas on-site; and
- ensuring welding and other hot works is undertaken in controlled areas where potential for starting a fire is
minimised.
3.7.5 Monitoring
All employees will be responsible for the identification and giving alarm of fires on-site or adjacent bush fires off-site.
Site Manager to undertake a visual assessment annually to assess adequacy of the bushfire control measures
implemented.
3.7.6 Audit and Review
The scope and effectiveness of the fire management strategies will be reviewed within 30 days of responding to a fire
emergency or at least once every three years.
3.7.7 Reporting and Responsibility
All employees will be responsible for notifying the Site Manager of any fire on, or approaching the Site, or any
foreseeable hazard or risk that could contribute to a fire.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.