CSR Building Products Limited Page 43
West Ridge Quarry
Site Based Management Plan
3.8.5 Monitoring
The Site Manager or delegate shall carry out a daily inspection during clearing.
Once Site rehabilitation commences, the Site Manager shall prepare a Site Rehabilitation Plan and Monitoring
Program.
Rehabilitation measures including landform stability, long-term sediment and erosion controls and revegetation of
profiled final land surfaces will be visually monitored by the Site Manager and, where relevant, assessed by technical
experts to determine the effectiveness of measures implemented.
The Site Manager may engage a suitably qualified consultant to monitor the establishment of vegetation and land
stability. The method shall be at the discretion of the professional consultant but may include gradient or transect
method to monitor:
- an assessment of surface (and slope) stability;
- plant community structural attributes (such as cover); and
- plant community composition (such as presence of desired species and weeds).
The key parameters to be measured as part of the monitoring program will include:
- erosion;
- groundcover;
- vegetation species (richness of desired species); and
- weed presence.
Photographs shall be taken of the rehabilitated area at nominated photograph sites on at least a yearly basis to
monitor plant growth and to record the progress, success or otherwise of the rehabilitation works completed, until the
nominated rehabilitation success indicators have been achieved.
The Site Manager shall conduct regular inspections to plan timely maintenance works. Maintenance works shall be
required for fertilising, watering, repairs to barriers, guards and stakes and plant replacement (refer to Table 17 –
Maintenance Schedule – Vegetation Works).
Table 17 – Maintenance Schedule – Vegetation Works
Item Activity Frequency
Weed Control
Site Preparation Slashing Annually (Late August to Early September)
Primary Weeding Application of herbicide Annually (Late September)
Secondary Weeding Application of herbicide Annually (January to February)
General Weed Management Application of herbicide Biannually (Early December and June)
Re-vegetation Management
Vegetation establishment Monitor performance and 1 month after Seeding
conduct any necessary 3 months after Seeding
maintenance 6 months after Seeding
12 months after Seeding
Pasture Management
Grass Height Slashing Biannually (Late August to Early September and
February to March) until established
Grass Vigour Fertilise Annually (optional)
3.8.6 Auditing and Review
The Site Manager shall review rehabilitation management strategies as required and at least once every three years.
3.8.7 Reporting and Responsibility
The Site Manager will record the results of any Site inspections and any control or corrective measures undertaken.
Records of rehabilitation measures implemented on-site shall be kept for the duration of the Site operations.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.