CSR Building Products Limited Page 46
West Ridge Quarry
Site Based Management Plan
- ensuring all Site personnel are informed about the identification and significance of archaeological items (bone
materials, shaped stones etc.); and
- maintaining contact details of relevant agencies/groups in the event of a find or suspected discovery, namely:
Cultural Heritage Coordination Unit, the Department of Environment and Heritage Protection, local cultural
association or Land Corporation;
stopping work in the vicinity of areas where items of possible cultural/heritage significance are found until
such time that liaison with EHP and/or the local Aboriginal groups has been undertaken; and
restricting the removal or disturbance of items of possible cultural/heritage significance until an approval has
been issued.
3.9.5 Monitoring
Ongoing general surveillance of work areas (particularly during vegetation and topsoil stripping) shall be conducted to
ensure that Aboriginal Cultural heritage relics and objects are not damaged and/or disturbed.
3.9.6 Auditing and Review
The Site Manager shall review the Cultural Heritage management strategy as required and at least once every three
years.
3.9.7 Reporting and Responsibility
The Site Manager shall report any discovery of archaeological relics, artefacts or objects to the Cultural Heritage
Coordination Unit:
- Address: Cultural Heritage Coordination Unit
Aboriginal and Torres Strait Islander Land Services
Department of Environment and Heritage Protection
GPO Box 2454
Brisbane QLD 4001
- Phone: 07 3239 3647
3.9.8 Identification of Incident or Failure to Comply
Failure to meet the legal requirements in relation to ACH Act if any archaeological relics, artefacts or objects are
discovered.
3.9.9 Contingency Plan
The Site Manager to assess processes to identify any significant changes and if required, modify activities/process.
December 2012 / file ref. 1271_610_001 GROUNDWORK p l u s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.