Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 295, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                      Probable Solutions                                   Compliance   Comments
                                                                                                                                               / /NA
environments and ecological processes, including avoiding the release of                                                                                 impacts. The SBMP has been prepared to assist in the
pollutants that would adversely affect the quality of the land, air or water.                                                                            management and protection of surrounding environment values
                                                                                                                                                         (including the release of pollutants that may affect the quality of
                                                                                                                                                         the land, air, or water) and describes how the operator proposes
                                                                                                                                                         to manage potential environmental impacts which may be caused
                                                                                                                                                         by carrying out extractive and processing activities.

O66                                                                                                                                                      The Site does not immediately adjoin an existing community use.
Where adjoining an existing residential use or a community use or land included        No solution provided.
in a residential zone any emissions of odour, dust, air pollutants, noise, light or                                                                      A residential use is identified on Lot 1 on RP127728, which
vibration does not spread beyond the site boundaries.                                                                                                    shares the Lake Macdonald Drive access to the Site. The Traffic
                                                                                                                                                         Impact Assessment Report (ATTACHMENT 7) prepared for the
                                                                                                                                                         Site anticipates that the residential driveway will not be adversely
                                                                                                                                                         impacted upon by the proposed development. The proposed
                                                                                                                                                         disturbance areas on the Site (on Lot 3 on SP108094) are located
                                                                                                                                                         a considerable distance (i.e. 850 m) from this residence, and is
                                                                                                                                                         anticipated that the residence will not be significantly impacted
                                                                                                                                                         upon.

                                                                                                                                                         The Site Based Management Plan (ATTACHMENT 8) provides
                                                                                                                                                         the framework for environmental management on the Site and is
                                                                                                                                                         a practical guide at the operational level to contain environmental
                                                                                                                                                         impacts. The SBMP has been prepared to assist in the
                                                                                                                                                         management and protection of surrounding environment values
                                                                                                                                                         and describes how the operator proposes to manage potential
                                                                                                                                                         environmental impacts which may be caused by carrying out
                                                                                                                                                         extractive and processing activities. The Site Based Management
                                                                                                                                                         Plan will include measures to contain any emissions of odour,
                                                                                                                                                         dust, air pollutants, noise, light or vibration within the boundaries
                                                                                                                                                         of the Site.

Site suitability
O67                                                                                    S67.1                                                             The proposed development will utilise the existing local services
Industrial business uses are established on land that has access to an                 The site is connected to reticulated water supply,                (i.e. electricity, telecommunications, water, sewerage) provided
appropriate range of infrastructure services and utilities;                            sewerage, stormwater and electricity.                             on the Site. It is anticipated that the development will not require
                                                                                                                                                         any further public utilities and services for the operations of the
AND                                                                                                                                                      development. Existing infrastructure on-site will be used where
                                                                                                                                                         necessary.

O68                                                                                    S68.1                                                             All extraction activities included as part of the proposed
Industrial activity is established on sites having sufficient area and dimensions to   The site is a minimum of 1,000m².                                 development will be undertaken in a manner consistent with the
accommodate the building or buildings, associated parking areas, service vehicle                                                                         existing mining lease approvals over the land.



  December 2012 file ref.1271_DA1_310_002                                                                                         29                                                                    Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.