Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 295, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
environments and ecological processes, including avoiding the release of impacts. The SBMP has been prepared to assist in the
pollutants that would adversely affect the quality of the land, air or water. management and protection of surrounding environment values
(including the release of pollutants that may affect the quality of
the land, air, or water) and describes how the operator proposes
to manage potential environmental impacts which may be caused
by carrying out extractive and processing activities.
O66 The Site does not immediately adjoin an existing community use.
Where adjoining an existing residential use or a community use or land included No solution provided.
in a residential zone any emissions of odour, dust, air pollutants, noise, light or A residential use is identified on Lot 1 on RP127728, which
vibration does not spread beyond the site boundaries. shares the Lake Macdonald Drive access to the Site. The Traffic
Impact Assessment Report (ATTACHMENT 7) prepared for the
Site anticipates that the residential driveway will not be adversely
impacted upon by the proposed development. The proposed
disturbance areas on the Site (on Lot 3 on SP108094) are located
a considerable distance (i.e. 850 m) from this residence, and is
anticipated that the residence will not be significantly impacted
upon.
The Site Based Management Plan (ATTACHMENT 8) provides
the framework for environmental management on the Site and is
a practical guide at the operational level to contain environmental
impacts. The SBMP has been prepared to assist in the
management and protection of surrounding environment values
and describes how the operator proposes to manage potential
environmental impacts which may be caused by carrying out
extractive and processing activities. The Site Based Management
Plan will include measures to contain any emissions of odour,
dust, air pollutants, noise, light or vibration within the boundaries
of the Site.
Site suitability
O67 S67.1 The proposed development will utilise the existing local services
Industrial business uses are established on land that has access to an The site is connected to reticulated water supply, (i.e. electricity, telecommunications, water, sewerage) provided
appropriate range of infrastructure services and utilities; sewerage, stormwater and electricity. on the Site. It is anticipated that the development will not require
any further public utilities and services for the operations of the
AND development. Existing infrastructure on-site will be used where
necessary.
O68 S68.1 All extraction activities included as part of the proposed
Industrial activity is established on sites having sufficient area and dimensions to The site is a minimum of 1,000m². development will be undertaken in a manner consistent with the
accommodate the building or buildings, associated parking areas, service vehicle existing mining lease approvals over the land.
December 2012 file ref.1271_DA1_310_002 29 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.