Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
GROUNDWORK it plus Resources, Environment, Land Use Planning COPY 28 August 2012 Ref: 1334_613_004 Permit and Licence Management Implementation and Support Unit Department of Environment and Heritage Protection GPO Box 2454 BRISBANE QLD 4001 Attention: Joe Winzenberg Dear Joe, RE: PLAN OF OPERATIONS 2012 - 2017 FOR CSR BUILDING PRODUCTS LIMITED, COOROY PROJECT Please find enclosed the new Plan of Operations 2012 - 2017 for the CSR Building Products Limited, Cooroy Project which replaces the Plan of Operations 2007 — 2012. This Plan of Operation is in relation to the Environmental Authority No. MIC 200390705 for the following mining tenements: ® —ML3709, ML3751, ML3671, ML3742, ML3718, ML500078, ML3672, ML3673, ML3705, ML3729 and ML3696 The Discount Category for the Project has been assessed as Category 4 on the basis of available information. As per the requirements of the Code of Environmental Compliance for Mining Lease Projects, an additional 45% discount has been added to the Performance Category as a result of the implementation of an EMS for the sites. The EMS is titled “Environmental Management Overview Strategy for Cooroy Project, RB Kitch and Assoc. Pty Ltd, November 2005" and has been previously lodged with the Department of Environment and Heritage Protection (EHP). As per the schedule of rehabilitation and disturbance for this project, the financial assurance has been calculated as follows: Financial Assurance Maximum cost to complete rehabilitation (total for ail mining tenements) $765,400.00 Performance Category 4 Discount Rate 25% (10% for Performance Category 4, plus additional 15% for EMS) Performance Category Discount (25%) $191,300.00 Financial Assurance $574,000.00 Notes: Security (financial institution undertakings) currently held by the State for site operation is $345,800 Financial Assurance estimate above reported to the nearest $100.00. Level 2, 15 Lang Parade, Milton Qld 4064 PO Box 1779, Milton BC, Qld 4064 www. groundwork.com.au | p: 464738710411 F: +617 38710021 &:[email protected] ABN: 80 829 445 906
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.