Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

 

 

 

 

 

 

GROUNDWORK
it plus

Resources, Environment, Land Use Planning

COPY

28 August 2012
Ref: 1334_613_004

Permit and Licence Management

Implementation and Support Unit

Department of Environment and Heritage Protection
GPO Box 2454

BRISBANE QLD 4001

Attention: Joe Winzenberg

Dear Joe,

RE: PLAN OF OPERATIONS 2012 - 2017 FOR CSR BUILDING PRODUCTS LIMITED, COOROY
PROJECT

Please find enclosed the new Plan of Operations 2012 - 2017 for the CSR Building Products Limited, Cooroy
Project which replaces the Plan of Operations 2007 — 2012. This Plan of Operation is in relation to the
Environmental Authority No. MIC 200390705 for the following mining tenements:

® —ML3709, ML3751, ML3671, ML3742, ML3718, ML500078, ML3672, ML3673, ML3705, ML3729 and
ML3696

The Discount Category for the Project has been assessed as Category 4 on the basis of available information.
As per the requirements of the Code of Environmental Compliance for Mining Lease Projects, an additional
45% discount has been added to the Performance Category as a result of the implementation of an EMS for
the sites. The EMS is titled “Environmental Management Overview Strategy for Cooroy Project, RB Kitch and
Assoc. Pty Ltd, November 2005" and has been previously lodged with the Department of Environment and

Heritage Protection (EHP).

As per the schedule of rehabilitation and disturbance for this project, the financial assurance has been
calculated as follows:

Financial Assurance

 

 

 

 

 

 

Maximum cost to complete rehabilitation (total for ail mining tenements) $765,400.00
Performance Category 4
Discount Rate 25% (10% for Performance
Category 4, plus additional 15%

for EMS)

Performance Category Discount (25%) $191,300.00
Financial Assurance $574,000.00

 

 

Notes:
Security (financial institution undertakings) currently held by the State for site operation is $345,800

Financial Assurance estimate above reported to the nearest $100.00.

Level 2, 15 Lang Parade, Milton Qld 4064 PO Box 1779, Milton BC, Qld 4064
www. groundwork.com.au | p: 464738710411 F: +617 38710021 &:[email protected]
ABN: 80 829 445 906

 

 
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.