Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 309, section 1. The text section number identifies this passage in the reader.

  Natural Hazards Overlay Code

Specific Outcomes                                                            Probable Solutions                                 Compliance   Comments
                                                                                                                                   / /NA
Table 13.8 – Landslide Hazard Areas – NOT APPLICABLE
Table 13.9 – Bushfire Hazard Areas
13.33 Effects of use and works
New Uses
O4                                                                           S4.1                                                  AS        ALTERNATIVE SOLUTION
The proposed use does not compromise the safety of people or property from   The use is sited on land that is not in a Medium                The Site is shown on the Noosa Shire Planning Scheme Overlay
bushfire.                                                                    or High Bushfire Hazard Area;                                   Map (OM3.4 Natural Hazard Overlay Map (Bushfire and Acid
                                                                                                                                             Sulfate Soils)) as being located in a “Medium Bushfire Hazard
                                                                             OR                                                              Area”. Portions of the proposed disturbance areas on-site are
                                                                                                                                             located within mapped Medium Bushfire Hazard areas.

                                                                                                                                             All extraction activities included as part of the proposed
                                                                                                                                             development will be undertaken in a manner consistent with the
                                                                                                                                             existing mining lease approvals over the land.

                                                                                                                                             The proposed development for extractive industry is no different
                                                                                                                                             to the historical mining activities over the land. The only difference
                                                                                                                                             to the historical mining activities over the land in comparison to
                                                                                                                                             this application for extractive industry is that the extraction of the
                                                                                                                                             clay material will be used for its physical properties as fill (e.g. for
                                                                                                                                             rehabilitation purposes for the Neales Quarry and White Pit
                                                                                                                                             Quarry to the south of the Site) as opposed to using the clay
                                                                                                                                             material for its ceramic properties (which is defined as a ‘mineral’
                                                                                                                                             under the Mineral Resources Act 1989).

                                                                                                                                             The approval sought is for a limited purpose (to enable
                                                                                                                                             rehabilitation of mining leases to the south of the Site at Neales
                                                                                                                                             Quarry and White Pit Quarry). It is anticipated that the volume of
                                                                                                                                             material required can be obtained and hauled within a period of 2
                                                                                                                                             years from commencement of the operations.

                                                                                                                                             The impacts on the environment will be limited as all activities will
                                                                                                                                             be within existing disturbed areas with no extension outside of the
                                                                                                                                             existing mining lease operational area.

                                                                                                                                             The development does not involve institutional uses whereby the
                                                                                                                                             evacuation of people from the Site will be difficult. It is anticipated
                                                                                                                                             that the development will not generate a significant increase in
                                                                                                                                             the number of people to live or work in the area.



  December 2012 file ref.1271_DA1_310_002                                                                               43                                                                   Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.