Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 311, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                 Probable Solutions                                   Compliance   Comments
                                                                                                                                          / /NA
                                                                                  S5.2                                                    NA
                                                                                  Building work will not involve more than an
                                                                                  additional 20m² of gross floor area to an existing
                                                                                  building;

                                                                                  OR

                                                                                  S5.3                                                    NA
                                                                                  Where located in a High or Medium Bushfire
                                                                                  Hazard Area identified on Overlay Maps OM1.4
                                                                                  to OM9.4, uses are designed to function
                                                                                  effectively during and immediately after bushfire
                                                                                  events.

Hazardous materials
O6                                                                                S6.1                                                              The proposed development does not involve the manufacture or
Public safety and the environment are not adversely affected by the detrimental   Hazardous materials are not manufactured and                      storage of hazardous materials in bulk.
impacts of bushfire on hazardous materials manufactured or stored in bulk.        stored on the site.
                                                                                                                                                    The Site Based Management Plan (ATTACHMENT 8) provides
                                                                                                                                                    the framework for environmental management on the Site and is
                                                                                                                                                    a practical guide at the operational level to contain environmental
                                                                                                                                                    impacts. The SBMP has been prepared to assist in the
                                                                                                                                                    management and protection of surrounding environment values
                                                                                                                                                    and describes how the operator proposes to manage potential
                                                                                                                                                    environmental impacts which may be caused by carrying out
                                                                                                                                                    extractive and processing activities.

13.34 Siting, design and construction
O7                                                                                S7.1                                                              Refer to Response to O4 above.
Uses and works including building works are sited, designed and constructed       Uses and works including building works are
to—                                                                               sited—
a) minimise the number of people and property subject to bushfire risk; and       a) on lots greater than 2500m²;
b) maximise the protection of people and property during the passage of a fire          i.   in locations of lowest hazard within
     front.                                                                                  the lot (Figure 13.5 provides
                                                                                             guidance); and
                                                                                        ii. to achieve setbacks from hazardous
                                                                                             vegetation of 1.5 times the
                                                                                             predominant mature canopy tree
                                                                                             height or 10m whichever is the
                                                                                             greater; and
                                                                                        iii. 10m from any retained vegetation
                                                                                             strips or small areas of vegetation;



  December 2012 file ref.1271_DA1_310_002                                                                                     45                                                                 Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.