Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
Table 11 - White Pit Quarry
A. The largest total area of B. Work required to achieve the rehabilitation C. Cost ($/ha) (third party cost to D. Cost to rehabilitate the
Type of Disturbance Tick disturbance that will occur objectives (e.g. pit backfilling, re-contouring, rehabilitate area of disturbance— maximum area of
during the period of the plan (ha) fertilising, seeding, other (specify)) as per attached quote) disturbance (i.e. A x C) ($)
Hand mining N/A
Drilling/wells N/A
Raw ore storage yard N/A
Cleared vegetation N/A
Alluvial mining N/A
Voids, pits, trenches < than 3m deep N/A
Reprofiling and recontouring, respreading available
Voids, pits, trenches > than 3m deep 3.93 ha $21,296.00 $83,693.28
topsoil, seeding (grass seed) and fertilising
Underground / shafts N/A
Tail dam N/A
Reject stockpiles N/A
Minor final perimeter trim earthworks including battering
Water storage dam 1.13 ha slopes (max 20 degree), ripping, seeding (grass seed) $10,496.00 $11,860.48
and fertilising
Waste rock dumps N/A
Topsoil stockpiles N/A
Processing plant N/A
Access tracks 0.27 ha To maintain as beneficial use by landowner agreement $0 0
Camp / offices / sheds
Workshops / fuel / chemical storage N/A
Costs based on transport to all sites. Therefore divided
Mobilisation Costs N/A $1,166.66 $1,166.66
by 6 to give price per site.
Total Area: 5.33 ha E. Total rehabilitation cost $96,720.42
F. Maintenance and monitoring costs (10% of rehabilitation cost) $9,672.04
G. CPI (3% of total rehabilitation cost x number of years covered by plan) $2,901.61
The period of the plan is for 5 years H. GST (10%): 0.1 x (E + F + G) $10,929.41
$120,223.48
($90,200 after Performance
Category 4 and EMS discount
Financial assurance required (incl. GST, CPI and maintenance/monitoring): (E + F + G + H) applied as per code of
compliance, value rounded to
nearest $100)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.