Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 46, section 1. The text section number identifies this passage in the reader.
Site details Substrate = Clay Location = Cooroy and Pomona COSTINGS ITEM Mobilisation cost (including transport of machinery between each site Price $7000.00 all up float hire Local native pasture grass seed mix per kg $21.00/kg Fertiliser per kg $1.35/kg Activity Price perha | Price per hour Stockpile removal (push into mine void on short $5200.00 $310.00 Haulage less than 100mm travel distance Re-spread topsoil (100mm depth minimum $10800.00 $610.00 Available on- site) Re-profiling sediment trap batters 30% slope (1 in $4100.00 $205.00 3) to connect with existing ground level Re-profiling void batters 30% slope (1 in 3) to $4100.00 $205.00 Connect with existing ground level Minor leveling works on any disturbed mine areas $3900.00 $290.00 (le. Hardstand and office, etc) Ripping and $4700.00 $260.00 contouring Spreading of native seed mix and fertiliser $1225.00 $138.00 Tony Cox KAT ALA constRucTIONs PTY LTD PO BOX 297 ALBION BC 4010 PH: 07 3862 3300 FAX: 07 3862 4099 EMAIL: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.