CSR West Ridge Quarry
Ecological Assessment Report
Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
b) new lots are created to allow for site in a more natural manner rather than pooling in the quarry pit. In this regard, the loss of 0.02ha of Riparian
O2 For the purpose of suitable house site areas or other Buffer Area at the quarry would be offset by the overall improvements to the three quarries involved.
Reconfiguring a Lot new future buildings and works to be
lots are only created where located within existing cleared 02
they minimise the areas or areas of low ecological
N/A – the development purpose is for a MCU.
fragmentation and value; and
maximise the retention of c) building envelopes are
existing vegetation. designated for each lot. 03
S3.1 No solution provided The areas nominated for the extraction works were limited by the need to reshape areas of higher ground
present around the existing quarry pit, and by the extent necessary for the rehabilitation requirements of White
O3 Interference with
Pit Quarry and Neales Quarry. Nonetheless, the two proposed disturbance areas are located within portions of
vegetation only occurs
the site which have been previously disturbed. A large portion of the eastern disturbance area currently supports
where—
open cleared paddocks and will not result in clearance of native vegetation. The proposed areas are contained
a) no other suitable cleared within the existing mining lease, and will expand upon the already disturbed mining pit to enable landform
or partially cleared area is reshaping.
available on the premises;
b) the development
The proposed extraction locations encompass areas of lower ecological value when compared to remnant
minimises the total footprint
(Endangered and Of Concern) and regrowth vegetation to the north and south, Referrable Wetlands to the north,
within which all activities,
and the Environmental Protection Area across a large portion of the site. The proposed areas also
buildings, structures,
predominantly avoid mapped areas recognised by The Noosa Plan including Environmental Enhancement
driveways and other works
Areas, Koala Habitat Areas, Open Space Corridors, Major Waterbodies or watercourses/drainage lines and
are contained; and
areas of flood and landslide hazard.
c) the development is
located in areas of low
ecological value over other The works footprint does not require any additional areas of disturbance as the proposed works will utilise
areas, to the greatest existing cleared areas for stockpiling and existing quarry infrastructure for storage and machinery access (i.e. the
extent practicable. access track to the pit, causeway crossing, processing and storage areas in Lot 2 etc).
Probable Solution S1.1 and 3.1 therefore applies and the proposed works would achieve the Specific Outcome.
Wetlands S4.1 A minimum separation The proposed disturbance areas do not support wetlands or waterbodies identified in The Noosa Plan
O4 Wetlands are protected distance of 100m is provided Biodiversity Overlay Maps (i.e. OM3.1 and OM3.5).
from removal or between a wetland and any
degradation and any adjacent development or use. Referable Wetlands, pursuant to the SP Reg, are located in the northern portion of the site and along Six Mile
adverse impacts on Creek to the south and east of the proposed disturbance areas (refer Figure 2). Both proposed disturbance
wetlands are prevented, areas intercept the 100m buffer to DERMs recognised Referable Wetland associated with Six Mile Creek. The
minimised or mitigated western disturbance area is approximately 50m within the buffer and the eastern disturbance area only intercepts
by— the buffer by a small amount at its northernmost end. As such, DERM will adopt an advisory referral role for the
a) maintaining adequate MCU application in relation to Referable Wetlands. It is relevant to note that the approved mining lease
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.