Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 98, section 1. The text section number identifies this passage in the reader.
CSR West Ridge Quarry
Ecological Assessment Report
Column 1 Column 2 Assessment of Impacts and Recommendations
Specific outcomes Probable solutions (if code
assessable)
Plate 5. Drainage line in eastern disturbance Plate 6. Drainage line at western disturbance
area (southern end) area (southern end)
Plate 7. Small waterhole in eastern disturbance area.
*Wetland means natural or artificial areas of permanent or periodic inundation with water that is static or flowing,
fresh, brackish or salt. The term includes areas of marine water not exceeding 6m depth at low tide.
Riparian Buffer Area S5.1 No new development occurs
O5 The biodiversity and on, or partly on, premises Probable Solutions S5.2 – S5.6 do not apply to the MCU required for the proposed works.
ecosystem values of indicated as Riparian Buffer Area
watercourses, drainage on Biodiversity Overlay Maps
With reference to S5.1, and as discussed, the works are proposed to occur within two small areas on the
CSR Building Products Ltd Version 3 4 December 2012
Ecological Assessment Report V3.docx Commercial in Confidence Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.