Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2016-09-06 P&E Committee - Attachment 1 to Item 1 - Proposal Plans for MCU15 0109

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                               BUILDING E




                                                                            LINE OF 8.0m HEIGHT LIMIT



                                                                                                                   LINE OF 8.0m HEIGHT
                                                                                                                   ABOVE PROPOSED
                                                                                                                   FINISHED GROUND LINE
            LINE OF NATURAL GROUND
 BUILDING
     G                                                                                                                      PITCHING PT

                                                            UNIT 28
                                                                                                                               RL 29.920




                                                                                                                                       2200
                                          BALCONY   BED 2    MRP             ENS                 BED 1   BALCONY
                                                                                                                                LEVEL 2
                                                                                                                               RL 27.720


                                                            UNIT 23




                                                                                                                                       2920
                                          BALCONY   BED 2    MRP             ENS                 BED 1   BALCONY
                                                                                                                                LEVEL 1
                                                                                                                               RL 24.800




                                                                                                                                       2800
                                                              BASEMENT CARPARK
                                                                                                                                LEVEL 0
                                                                                                                               RL 22.000




                                                                                                                                              BUILDING
                                                                                                                                                  D
                                     01                            BUILDING E : SECTION E




PROPOSED PRECINCT E2 DEVELOPMENT                                                                                     ALTUM CONSTRUCTIONS                 Development Approval north
                                                                                                                                                         scale:
                                                                                                                                                         issue:
                                                                                                                                                                  @ A1
                                                                                                                                                                  05     date: 14-07-16


NOOSA SPRINGS, NOOSA HEADS                                                                                           BUILDING E: SECTION                 7043/DA18
                                                                                                                                                                                          The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
Log in to download the original file

2016-09-06 P&E Committee - Attachment 1 to Item 1 - Proposal Plans for MCU15 0109(PDF, 17MB).pdf · 17.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.