Original source · versioned page text
Body Corporate Approval Letter2.jpg
Attached to the e-mail Body corporate approval - MCU21_0156_03 - 13_89 Eumundi Noosa Road Noosaville.
STRATA SOLUTION ‘SPECIALISTS Quorum The Chairperson advised that a quorum was rej i presented, Under thi Community Management (Accommodation Module) pee oes oer , UI percentage of voters as defined by special resoluti meeting, within 30 minutes of the meeting's start nee RIE Per presen Po oncny eiag Meeting opened on Monday 16 September 2024 at 3:00 PM 1. CONFIRMATION OF MINUTES Eiaiutec/ Melon Ordinary Resolution RESOLVED that the minutes of the previous general meeting h eld 1 adopted as a true and correct record. 2 oa MOTION CARRIED YES 2: NO 0 ABSTAIN nl 2, LOT 13 LOT IMPROVEMENT Ordinary Resolution Submitted by A McRaye, Loft: 13 RESOLVED that the Body Corporate approve Lot 13 to install a patio roof cover by “Collins Building Designs" as detailed in the application submitted. The owner of Lot 13 confirms full understanding of the Body Corporate By-Laws. Also, that all proposed works are fo be met by the Lot Owner including any damage to common property, waste removal and insurance. The installation will be in accordance with the body corporate by-law 16 (External Alterations) of the Community Management Statement and_ following approval conditions. The costs associated with the installation, waste removal and insurance of the Lot Improvement are the lot owner's responsibility and not the body corporate. e Any future maintenance of the Lot Improvement will be the responsibility of the owners and subsequent owners and not the body corporate. * That the installation of the Lot Improvement does not detract from the appearance of any lot included in, or on the common property for the community title scheme, as per the Body Corporate and Community (AccommodationModule). «That the Lot Improvement be installed by a qualified and licensed contractor between the hours of 9:00 am and 5:00 pm Monday to Friday (excluding public holidays). e |f the owner or subsequent owners fails to remedy any breach with the Lot improvement the body corporate may, ona further 3 days’ notice to the owner, enter the unit and carry out the necessary works to remedy the breach and that the body corporate may recover the costs in respect of that breach. e That the body corporate committee may reserve the right to revoke their approval and that the Lot Improvement be immediately removed if the owner(s) or subsequent owner(s) fail to comply with the above conditions. MOTION CARRIED yes | 5 | NO | 4 | ABSTAIN in| ee The meeting was declared closed at 3:05 PM. sat. _ sid Monday 16 September 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original