Compliance against Conditions

Attached to the e-mail Operational Works Application OPW22/0163 Stage 1 (2 lots only) - DA Form 1 - Engineering Plans - Compliance against Conditions - Rehab, Fencing & Covenant Plans - Prelim Stage 1 Plan - 60 Glenridge Dr Cooroibah.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

0121345ÿ7899 11ÿ911 20ÿ9 2 1 ÿ                                                   ÿ 21ÿÿ
ÿ
ÿ
                                  ÿ ÿ!ÿ"ÿ#"ÿÿ"$ÿ$ÿ%&ÿ
                                        '()ÿÿ
                                  ÿ *%+,ÿÿ-ÿ%ÿ"$"ÿÿ) ÿ%ÿ!ÿ"%ÿ&%ÿ
                                        ,ÿÿ$ÿÿ'.)(ÿ/ÿ,ÿ'.)(ÿ)+ÿ
                                  "ÿ ÿ,ÿ$ÿ% ÿ-%ÿ&0) #$ÿ
                           ÿ 1ÿ %ÿ%&ÿÿ!)ÿ+%2ÿ
                                  ÿ 3#ÿ%ÿ)#ÿ$)ÿ&%ÿ!%ÿÿ
                                        "$%ÿÿ
                                  ÿ 4%ÿ"#ÿ%&ÿ/%%,ÿ/ÿ%%$ÿ&%)ÿ)+5ÿ
                                        +%%ÿÿ%ÿÿ$%/ÿ%&ÿ#ÿ)+ÿ
                                  ÿ 4%ÿ"#ÿ%&ÿ%"0/$ÿ%ÿ)+#ÿ%ÿ%0$ÿ
                                        +#ÿ
                                  "ÿ 6$ÿ%&ÿ$% ÿ#)ÿÿ!%ÿÿ
                                  "ÿ 7ÿ&%ÿÿÿ89ÿ%&ÿÿ!%ÿ
                                        ÿÿ
                                  "ÿ 3,ÿ&ÿ+ÿ/ÿÿ+"% ÿ'(ÿ)%ÿ+%ÿ
                                        "ÿ!ÿ+#ÿÿ
                                  "ÿ :,ÿÿ"$%% ÿ$%/ÿ%/ÿ%ÿ$%/ÿ%ÿ&ÿ&%)ÿ
                                  "ÿ; #ÿ,ÿ&&#ÿ%ÿ++ÿ/ÿ
    '<ÿ%ÿ%ÿÿ=+%ÿ7%>ÿ3++%"ÿ+ÿ)$ÿ&%ÿÿ!%ÿ/%>ÿ%&ÿ
        6$ÿ'5ÿÿ!>ÿ$ ÿ%ÿÿ!%ÿ%&ÿ?@ÿ) ÿ!ÿ%$ÿÿ#,ÿ&%ÿÿ
        #%)+%ÿ%&ÿÿ!%ÿ/%>ÿÿÿ,ÿ+&%)#ÿ)#ÿ+%ÿ     To be paid prior
        &ÿÿÿ#%%ÿ%&ÿÿ++%"ÿÿ                                          to pre-start

    'Aÿ1ÿ&%%/$ÿ)% ÿ%&ÿÿ!>ÿ$ -!%ÿ),ÿ!ÿÿÿÿÿ%&ÿ#ÿ
        +&%)#ÿ#ÿ,ÿ&%%/$ÿ*% #ÿ++%"ÿÿ&%%/2ÿ
        ÿ Bÿ'ÿ0ÿC'.5...ÿ
        !ÿ Bÿ(ÿ0ÿC'.5...ÿ
        #ÿ BÿDÿ0ÿC'.5...ÿ
    'Eÿ%ÿ%ÿÿ=+%ÿ7%>ÿ3++%"ÿ+ÿ)$ÿ&%ÿÿ!%ÿ/%>ÿ%&ÿ
        6$ÿ(5ÿÿ!>ÿ$ ÿ%ÿÿ!%ÿ%&ÿ?F@ÿ) ÿ!ÿ%$ÿÿ#,ÿ&%ÿÿ
        #%)+%ÿ%&ÿÿ!%ÿÿÿ,ÿ+&%)#ÿ)#ÿ+%ÿ
        &ÿÿÿ#%%ÿ%&ÿÿ++%"ÿÿ
    'Gÿ1ÿ&%%/$ÿ)% ÿ%&ÿÿ!>ÿ$ -!%ÿ),ÿ!ÿÿÿÿÿ%&ÿ#ÿ
        +&%)#ÿ#ÿ,ÿ&%%/$ÿ*% #ÿ++%"ÿÿ&%%/2ÿ
        ÿ Bÿ'ÿ0ÿC(.5...ÿ
        !ÿ Bÿ(ÿ0ÿC(.5...ÿ
        #ÿ BÿDÿ0ÿC(.5...ÿ
    (.ÿ*% #ÿ"ÿÿ$ÿ%ÿ%+ÿÿÿÿ)#ÿ+%ÿ+$ÿ%ÿ
        +&%)#ÿ
    ('ÿ3ÿ*%"ÿ3ÿ;$)ÿÿH%ÿ)IÿÿÿJ ÿK!%ÿ
        %$)ÿH%ÿ)Iÿ) ÿ!ÿ++ÿ!,ÿÿL &ÿ+%Mÿÿ%ÿ% $ÿÿ
        =+%ÿ7%>ÿ++%"ÿ                                                   Complies -
                                                                                       Attached is
                                                                                       rehabilitation plan
                                                                                       for stage 1


[OCR of page images]
GENERAL COMMITTEE MEETING MINUTES 13 JUNE 2022

 

16.

17.

18.

19.

20.

21.

ii. Planted shrubs have achieved an average height of
1.2m.

iii, | Canopy and / or vegetative strata must not be devoid for
any area greater than 1.0m2 within any 10m2 sample.

iv. Plant density shading out and/or self-mulching.
d. The duration of the establishment period:

i. Adherence to maintenance regime for rehabilitation and
revegetation areas.

ii. No evidence of woody weeds reshooting from stumps,
poisoned trees or the regrowth of cut stumps.

iii | No evidence of over-weeding or impact on non-target
species.

iv. Signs of indigenous recruitment in rehabilitation areas.

Vv. Weed infestations less than 5% of the rehabilitation
areas.

vi. Any failed plants within the previous 12 month period
have been replaced.

vii. | Healthy and vigorous growth allowed to grow to full form.
viii. Mulch layer sufficient to suppress weeds.

Prior to the Operational Works Approval prestart meeting for the rehabilitation works of

Stage 1, a bank guarantee or a bond of $30,000 must be lodged as security for the

completion of the rehabilitation works and three year performance maintenance period To be paid prior
identified in the conditions of this approval. to pre-start

The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:

a. Year 1 - $10,000
b. Year 2 - $10,000
c. Year 3- $10,000

Prior to the Operational Works Approval prestart meeting for the rehabilitation works of
Stage 2, a bank guarantee or a bond of $60,000 must be lodged as security for the
completion of the rehabilitation and three year performance maintenance period
identified in the conditions of this approval.

The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:

a. Year 1 - $20,000
b. Year 2 - $20,000
Cc. Year 3 - $20,000

Council reserves the right to stop and start the maintenance period depending on
performance.

A Covenant Area Management Plan (or similar) and a Bushland Rehabilitation
Program (or similar) must be prepared by a qualified person* and endorsed through an

Operational Works approval.

Complies -
Attached is
rehabilitation plan
for stage 1
Log in to download the original file

Compliance against Conditions.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.