Attached to the e-mail Operational Works Application OPW22/0163 Stage 1 (2 lots only) - DA Form 1 - Engineering Plans - Compliance against Conditions - Rehab, Fencing & Covenant Plans - Prelim Stage 1 Plan - 60 Glenridge Dr Cooroibah.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

0121345ÿ7899 11ÿ911 20ÿ9 2 1 ÿ                                                       ÿ 21ÿÿ
ÿ
ÿ
         ÿ ÿ ÿÿ ÿ !"ÿ#$ $%ÿ$ ÿ&$ÿÿ ÿ
               $$%ÿ!'ÿÿ&(ÿ$ ÿ!$)$ÿÿ  $ ÿ*ÿÿ%$ ÿ
               +ÿ
         ÿ ÿ$$(ÿ*$ÿ ÿ$ÿ#%ÿ$$(,ÿ++$$,ÿ!,ÿ
               !%'ÿÿ!)(ÿ ÿ!$)$ÿ)ÿÿ)(ÿ*ÿÿ$*(ÿ$  ÿ
               !$)$ÿÿ+ÿ
           ÿ ÿ-$$%ÿ&&ÿ$.ÿÿÿ!)(ÿ ÿ!$)$ÿ)ÿÿ)(ÿ*ÿ ÿ
               +.(ÿ!$)ÿ)ÿ (ÿ"ÿ/$+ÿ&ÿ)ÿ0+$%ÿ ÿ1$%ÿ
               2ÿ3443ÿ ÿ$ ÿ ÿ ÿ/$+ÿ
         ÿ ÿ+ÿ#$ $%ÿ.  ÿ!,ÿ+ÿ!ÿ ÿ$ ÿ.$!(ÿ'ÿ
               ÿ!)(ÿ ÿ!$)$ÿ)ÿ $ÿ&ÿÿ$%ÿÿ
         &ÿ ÿ$$%ÿ!ÿ ÿÿÿ&(ÿ$ ÿ!$)$ÿ)ÿÿ)(ÿ$ÿ(ÿ
               &$,ÿ$ $%ÿ&$ÿ,ÿÿ!)(ÿ$ ÿ!$)$ÿ)ÿ5ÿ$ÿ ÿÿÿ
                5ÿ..$ÿ
    16789:;<ÿ=>9?@ÿ
    ABÿC)ÿÿ$ÿ$ÿ)ÿ*%ÿÿ$ÿ)ÿ&%ÿ&ÿ)ÿ5ÿ$ÿÿD$%ÿ1$*ÿ
         +ÿÿ ÿÿÿ&ÿ $$%ÿC)ÿ!"ÿ+ÿÿ "ÿ$ÿ
         ÿ!$)ÿÿE.$ÿF"ÿ..*ÿ ÿ+ÿ$ ÿ$ÿ.$Gÿ             Complies - See
                                                                                                   attached
         ÿ C)ÿ&%ÿ&ÿ.. ÿHÿBÿ+ÿÿ+. ÿ.$ÿÿ)ÿ$%ÿ&ÿ)ÿ         engineering plans

               *(ÿ.ÿ&ÿI%ÿJÿ                                                           in front of lot 8


         ÿ C)ÿ+$ ÿ&ÿ)ÿ&%,ÿ$ $%ÿ)ÿ.. ÿ$$,ÿ+ÿÿ
               +. ÿ.$ÿÿ)ÿ$%ÿ&ÿ)ÿ*(ÿ.ÿ&ÿI%ÿ3ÿC)ÿ$$ÿ
               +ÿÿ ÿ%(ÿ$ÿÿ!$)ÿ!$%ÿKÿ3JLMBN0443,ÿ
               O*$$ÿ1ÿ.. ÿ(ÿCE1ÿ%$ÿ
         P $$ÿABÿ$ÿ$+. ÿ.ÿÿJALÿ&ÿ)ÿQRSTTUTVÿXYZÿ[\]^ÿ$%ÿN"ÿ
         $&ÿ
    AMÿ2ÿ!ÿ$$ÿ+ÿÿ ÿ5$$%ÿD$%ÿ1$*ÿ!$)ÿ)ÿ!ÿ ÿC)ÿ
         !"ÿ+ÿÿ "ÿ$ÿÿ!$)ÿÿE.$ÿF"ÿ..*ÿ ÿÿ
         +. ÿ.$ÿÿ)ÿ$%ÿ&ÿ)ÿ*(ÿ.ÿ&ÿI%ÿ3ÿC)ÿ$$ÿ+ÿÿ
          ÿ%(ÿ$ÿÿ!$)ÿ !$%ÿKÿ3JLMBN0443,ÿO*$$ÿPÿ
         .. ÿ(ÿCE1ÿ%$,ÿ)ÿ_%$$%ÿO.ÿ1+ÿKÿ3JLMB`O0J,ÿ
         O*$$ÿaÿ.. ÿ(ÿCE1ÿ%$ÿ ÿ3Aÿb)ÿ3433ÿ ÿ+ÿ$ ÿ$ÿ
         .$Gÿ
         ÿ ÿ$$ÿ!$)ÿ*)$ÿ.$$(ÿ+$$ ÿÿD$%ÿ1$*ÿ
         ÿ .*$$ÿ&ÿ$%)ÿ$ÿ /ÿ&ÿ)ÿ$%ÿ. ÿ&ÿ)ÿ ÿÿ
         ÿ $ÿ&ÿ)ÿ!ÿ..(ÿ $ÿ
         P $$ÿAMÿ$ÿ$+. ÿ.ÿÿJALÿ&ÿ)ÿQRSTTUTVÿXYZÿ[\]^ÿ$%ÿN"ÿ
         $&ÿ
    28cÿ3>;d@ÿ
    L4ÿC)ÿ!ÿ ÿÿ)!ÿÿ)ÿ2..* ÿ0ÿ+ÿÿ ÿ ÿ $ ÿÿ
         efghijkÿmnoÿpgfqrÿstruÿvoÿtwiofuhqowÿxwÿhyygfihwyoÿpxunÿhwÿz{ofhuxgwh|ÿ}gfqrÿ
         ..*ÿ ÿÿ+. ÿ.$ÿÿ)ÿ$%ÿ&ÿ)ÿ*(ÿ.ÿ&ÿI%ÿ3ÿC)ÿ
         !"ÿ+ÿ$ ÿ$ÿ.$Gÿ
         ÿ ÿ*ÿ!$)ÿ&ÿ34ÿ+ÿ!$)ÿ!$$%ÿÿ)ÿNNÿ) ÿ ÿ%(ÿ
               $ÿÿ!$)ÿ)ÿ..* ÿ.ÿ
         ÿ ÿÿ$ÿ%(ÿ$ÿÿ!$)ÿ!$%ÿKÿ3JLMBN0443,ÿO*$$ÿ
               Pÿ.. ÿ(ÿCE1ÿ%$ÿ


[OCR of page images]
GENERAL COMMITTEE MEETING MINUTES 13 JUNE 2022

 

b. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement.

Cc. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement.

d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage
Act 2002 and associated codes and requirements.

e. all dams (including ponded water, dam walls and associated spillway structures)
are wholly located within the boundaries of a single lot.

f. all retaining walls and structures are fully contained within the lot they retain any
fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties.

External Works

48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive
must be reconstructed to be free draining. The works must be undertaken in

i i i ; : Complies - S:
accordance with an Operational Works approval and must include in particular: omp tes - wee

attached
engineering plans

a. The frontage of proposed Lot 8 must be completed prior to the sealing of the oF rcs

survey plan for Stage 1.

b. The remainder of the frontage, including the proposed intersection, must be
completed prior to the sealing of the survey plan for Stage 2. The intersection
must be constructed generally in accordance with drawing No. 21598-P002,
Revision D prepared by TOD engineers.

Condition 48 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.

49. Anew intersection must be constructed joining Glenridge Drive with the new road. The
works must be undertaken in accordance with an Operational Works approval and be
completed prior to the sealing of the survey plan for Stage 2. The intersection must be
constructed generally in accordance with drawing No. 21598-P002, Revision C
prepared by TOD engineers, the Engineering Report Document No. 21598 _RP1,
Revision B prepared by TOD engineers dated 24 March 2022 and must include in
particular:

a. an intersection with vehicle priority maintained on Glenridge Drive
b. provision of sight distances adequate for the design speed of the road
Cc. truncation of the new property boundaries

Condition 49 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.

New Roads

50. The new road as shown on the Approved Plans must be constructed and dedicated as
“road”. The works must be undertaken in accordance with an Operational Works
approval and be completed prior to the sealing of the survey plan for Stage 2. The
works must include in particular:

a. arreserve width of 20 metres with widening at the cul-de-sac head and generally
in accordance with the approved plan

b. | across section generally in accordance with drawing No. 21598-P002, Revision
C prepared by TOD engineers
Log in to download the original file

Compliance against Conditions.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.